IDProject NameStateDistrictMain TypeTypeStatusNameDate TimeViewImage
1Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherPostikudi2019-06-06 08:00:54.0
2Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherUtkal2019-06-05 17:43:55.0
3Upper Indravati (KBK)OdishaKalahandiHeadWorksOtherTunnel Intake Point2019-06-06 16:04:37.0
4Upper Indravati (KBK)OdishaKalahandiHeadWorksOtherTunnel Intake Point2019-06-06 16:04:38.0
5Upper TungaKarnatakaHaveriMain CanalMain CanalOnGoingThis work is to be done by Railway Department, due to corona effect the works are pending. The payment has been released to railway department from client. 2020-06-25 12:01:19.0
6Upper TungaKarnatakaHaveriMain CanalMain CanalCompleteHighway crossing (NH4) works for main canal is completed.2020-06-25 12:04:07.0
7Upper TungaKarnatakaHaveriDistributariesDistributariesYet To Be CompletedOff take point of DY- 6 is pending due to land acquisition2020-06-25 13:18:10.0
8Upper TungaKarnatakaHaveriDistributariesDistributariesYet To Be CompletedDue to land acquisition the work is not yet started.2020-06-25 14:01:06.0
9Nandur Madhmeshwar Ph. IINashikHeadWorksDamCompletebham dam2019-06-04 11:18:30.0
10Dolaithabi BarrageImphal EastMainCanalStructureyettobecomplete2018-11-21 02:49:28.0
11nullChhatarpurMainCanalMaincanalComplete2018-10-04 11:09:09.0
12DurgawatiKaimur (Bhabua)DistributariesStructureComplete2018-12-13 17:12:59.0
13NLBCYadgirMinors_Sub_MinorsAnyOther2018-11-08 15:03:05.0
14PunpunAurangabadHeadworksBarrageOngoing2018-12-12 14:22:53.0
15Upper Indravati (KBK)OdishaKalahandiMaincanalMain CanalCompleteRight Main Canal2019-06-06 10:52:37.0
16Upper Indravati (KBK)OdishaKalahandiHeadWorksOtherPenstock2019-06-06 16:04:37.0
17Upper Indravati (KBK)OdishaKalahandiDistributariesDistributariesCompleteBijamara Distributary2019-06-06 16:29:14.0
18Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherBijamara Village2019-06-06 16:46:21.0
19Upper Indravati (KBK)OdishaKalahandiDistributariesDistributariesCompleteAmbatula Distributary2019-06-06 17:01:25.0
20Upper Indravati (KBK)OdishaKalahandiMaincanalStructureCompleteRight Main Canal2019-06-06 10:52:37.0
21Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherJaypatnam2019-06-06 16:24:46.0
22Upper TungaKarnatakaHaveriMain CanalMain CanalOnGoingExcavation work is in progress, will be completed by 25th July 20202020-06-25 16:09:59.0
23Upper TungaKarnatakaHaveriMain CanalMain CanalCompleteCompleted2020-06-25 16:24:19.0
24ChampamatiKokrajharBranch CanalBranch CanalCompleteSRBC2019-05-11 13:39:49.0
25J. Chokka Rao LISWarangalMinors/ Sub-MinorsStructureOnGoing2019-05-03 12:23:49.0
26ThoubalManipurSenapatiMaincanalAny Otherabutment under construction2019-08-27 12:50:17.0
27SRSP St. IITelanganaWarangalDistributariesDistributariesYet To Be Completedland problem2019-12-05 12:20:59.0
28Bargi Diversion Projrct Ph- III (Km.104 to Km. 154)KatniBranchCanalMaincanalOngoing2018-12-18 12:48:31.0
29Dolaithabi BarrageManipurImphal EastDistributariesDistributariesYet To Be Completedfield channel2019-08-26 13:28:28.0
30GundlakammaAndhra PradeshPrakasamStructureMaincanalCompleteSuper Passage Cum SLRB2019-11-18 11:56:35.0
31SRSP St. IITelanganaWarangalDistributariesDistributariesComplete21R major distributoris2019-12-05 11:30:38.0
32Lower WardhaMaharashtraWardhaStructureMinors/ Sub-MinorsCompleteNachangaon2019-08-05 13:31:36.0
33Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletekhangaon Fall2019-08-05 18:02:36.0
34Peddavagu (Sch.Jaganathpoor)TelanganaAdilabadMain CanalMain CanalOnGoing2019-12-16 14:45:13.0
35ThoubalManipurThoubalMain CanalMaincanalOnGoing2019-08-27 17:23:24.0
36Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteMangalpur Sub Minor2019-06-06 10:56:05.0
37Upper Indravati (KBK)OdishaKalahandiMaincanalMain CanalCompleteLeft Main Canal2019-06-06 17:12:04.0
38Upper Indravati (KBK)OdishaKalahandiDistributariesDistributariesCompleteGolamunda Distributary2019-06-07 16:10:58.0
39Upper Indravati (KBK)OdishaKalahandiDistributariesStructureCompleteTel River Aquiduct2019-06-07 16:10:58.0
40Upper Indravati (KBK)OdishaKalahandiDistributariesDistributariesCompleteNagfani Distributary2019-06-06 16:06:26.0
41Upper Indravati (KBK)OdishaKalahandiMaincanalMain CanalCompleteRight Extension Main Canal2019-06-06 08:05:25.0
42Nandur Madhmeshwar Ph. IINashikHeadWorksOtherCompleter&r works2019-06-04 11:18:31.0
43Upper TungaKarnatakaHaveriMain CanalMain CanalOnGoingExcavation work is completed2020-06-25 17:10:09.0
44Upper TungaKarnatakaHaveriMain CanalMain CanalOnGoingEarthwork under progress at tail end for 700meters 2020-06-25 17:17:59.0
45KeloMaincanalMain CanalComplete2019-06-11 11:17:46.0
46Waghur ProjectJalgaonMaincanalCritical Issue / BottleneckOnGoing2019-05-08 17:56:06.0
47TelengiriOdishaKoraputMinors/ Sub-MinorsOutletComplete2019-06-11 20:46:57.0
48TelengiriOdishaKoraputMinors/ Sub-MinorsOutletComplete2019-06-11 20:46:58.0
49TelengiriOdishaKoraputMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteB.Singhpur -podapadar minor2019-06-11 20:46:58.0
50TelengiriOdishaKoraputMaincanalOutletOnGoingCD work over WC under progress2019-06-11 20:46:58.0
51Bargi Diversion Project Ph- I (km. 16 to Km 63)JabalpurMinors_Sub_MinorsAnyOther2018-12-17 14:46:12.0
52DhansiriUdalguriDistributariesMaincanalOngoing2018-12-17 11:32:35.0
53Mod. of Gang CanalMainCanalStructureComplete2018-09-28 17:03:36.0
54Mod. of Gang CanalMainCanalStructureComplete2018-09-28 17:03:36.0
55TelengiriOdishaKoraputMinors/ Sub-MinorsOutletCompletevillage B Janiguda2019-06-11 20:46:57.0
56Mod. of Gang CanalBranchCanalStructureOngoing2018-09-28 17:03:36.0
57Mod. of Gang CanalBranchCanalStructureOngoing2018-09-28 17:03:36.0
58Sagad ProjectMadhya PradeshVidishaMaincanalMain CanalCompletemain canal gudan khedi village2019-06-13 11:12:29.0
59TelengiriOdishaKoraputMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-06-11 20:46:57.0
60TelengiriOdishaKoraputMaincanalMain CanalComplete2019-06-11 20:46:58.0
61TelengiriOdishaKoraputMaincanalMain CanalCompletecut and cover2019-06-11 20:46:58.0
62Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherWell2019-06-06 10:58:06.0
63Upper Indravati (KBK)OdishaKalahandiMaincanalAny OtherKusumkhunti Well2019-06-06 17:20:47.0
64Upper Indravati (KBK)OdishaKalahandiDistributariesDistributariesCompleteJaring Distributary2019-06-06 08:43:27.0
65Upper Indravati (KBK)OdishaKalahandiDistributariesDistributariesCompleteKoilgaon Distributary2019-06-06 08:46:08.0
66Upper TungaHaveriDistributariesMaincanalComplete2018-12-12 13:41:12.0
67KeloMaincanalMain CanalComplete2019-06-11 11:18:01.0
68Subernarekha MultipurposeJharkhandSaraikela-KharsawanHeadWorksDamOnGoing2019-08-05 18:06:45.0
69Dolaithabi BarrageManipurImphal EastDistributariesDistributariesYet To Be Completedfield channel2019-08-26 13:30:04.0
70Upper TungaHaveriMainCanalMaincanalOngoing2018-12-12 10:55:03.0
71--Select--HaveriDistributariesAnyOther2018-12-14 14:01:12.0
72ThoubalImphal EastMainCanalMaincanalOngoing2018-11-21 15:10:17.0
73DurgawatiRohtasHeadworksDamComplete2018-12-13 16:35:45.0
74Sangola Branch CanalMaharashtraSolapurDistributariesDistributariesCompletelining is completed in the month of Nov 20192019-12-26 14:44:01.0
75ChampamatiChirangMainCanalAnyOther2018-12-07 12:26:30.0
76DhansiriUdalguriDistributariesMaincanalOngoing2018-12-17 11:36:41.0
77DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 10:30:20.0
78DurgawatiRohtasMainCanalStructureComplete2018-12-13 09:35:38.0
79DurgawatiRohtasMainCanalStructureComplete2018-12-13 11:38:18.0
80J. Chokka Rao LISWarangalMaincanalAny Othernull2019-05-04 09:10:06.0
81Int. Anandapur Barrage Ph. IOdishaKendujharMaincanalStructureOnGoing2019-08-27 12:57:17.0
82BuldanaMainCanalMaincanalComplete2018-11-27 11:39:10.0
83BuldanaMainCanalMaincanalComplete2018-11-27 11:39:44.0
84Mahi ProjectDharDistributariesOutletComplete2018-12-05 15:23:02.0
85MusuramilliEast GodavariMainCanalMaincanalComplete2018-12-05 13:03:43.0
86Sagad ProjectMadhya PradeshVidishaHeadWorksOtheraqueduct at enchda village2019-06-13 12:09:11.0
87TaraliMaharashtraSataraMaincanalMain CanalOnGoingKhatav left bank canal2019-06-13 11:40:21.0
88TaraliMaharashtraSataraMaincanalStructureOnGoing2019-06-13 11:40:21.0
89Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteMangalpur Sub Minor2019-06-06 11:19:37.0
90NLBCBijapurHeadworksDamComplete2018-11-08 19:25:17.0
91Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherWell2019-06-06 09:03:47.0
92DhansiriUdalguriDistributariesMaincanalOngoing2018-12-12 11:17:28.0
93Sagad ProjectMadhya PradeshVidishaHeadWorksDamCompletesagad dam2019-06-13 13:57:18.0
94J. Chokka Rao LISWarangalHeadWorksOthernull2019-05-03 10:23:53.0
95Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:20:46.0
96Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:42:47.0
97ChampamatiChirangMainCanalMaincanalComplete2018-12-07 11:56:12.0
98DhansiriUdalguriDistributariesMaincanalOngoing2018-12-12 12:47:25.0
99DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 10:22:02.0
100DurgawatiRohtasMainCanalMaincanalComplete2018-12-13 11:11:51.0
101J. Chokka Rao LISWarangalHeadWorksOthernull2019-05-03 18:04:43.0
102KhadakpurnaBuldanaMinors_Sub_MinorsOutletOngoing2018-11-27 12:20:01.0
103KudaliMaharashtraSataraHeadWorksDamOnGoingMahu dam2019-06-14 11:57:57.0
104KudaliMaharashtraSataraHeadWorksDamOnGoingmahu dam2019-06-14 12:05:48.0
105Mahi ProjectDharMinors_Sub_MinorsOutletComplete2018-12-04 14:30:50.0
106Mahi ProjectDharDistributariesOutletComplete2018-12-05 15:46:48.0
107Maniyari Tank (ERM)Branch CanalBranch CanalComplete2019-06-18 11:34:20.0
108Nandur Madhmeshwar Ph. IIAurangabadMinors_Sub_MinorsAnyOther2018-11-28 13:37:16.0
109PunpunAurangabadMainCanalStructureComplete2018-12-12 14:25:31.0
110PunpunAurangabadHeadworksBarrageOngoing2018-12-12 13:47:15.0
111Sardar SarovarKachchhBranchCanalMaincanalOngoing2018-12-05 10:01:34.0
112TaraliMaharashtraSataraMaincanalStructure2019-06-13 11:46:16.0
113TaraliMaharashtraSataraMaincanalMain CanalOnGoing2019-06-13 12:42:19.0
114ThoubalThoubalMainCanalMaincanalComplete2018-11-22 09:33:47.0
115Upper Indravati (KBK)OdishaKalahandiHeadWorksBarrageComplete2019-06-06 11:21:52.0
116Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherWell2019-06-06 09:13:29.0
117Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:20:54.0
118Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:43:01.0
119ThoubalManipurImphal EastBranch CanalBranch CanalYet To Be Completed2019-08-27 14:03:54.0
120Bansagar Unit - IIRewaBranchCanalStructureComplete2018-12-14 14:04:24.0
121Bargi Diversion Projrct Ph- III (Km.104 to Km. 154)KatniMainCanalAnyOther2018-12-18 11:41:32.0
122DhansiriUdalguriDistributariesMaincanalOngoing2018-12-17 11:47:42.0
123DhansiriUdalguriDistributariesMaincanalOngoing2018-12-17 13:27:39.0
124Dolaithabi BarrageManipurImphal EastDistributariesDistributariesYet To Be Completedfield channel2019-08-26 13:34:05.0
125DurgawatiRohtasDistributariesMaincanalComplete2018-12-13 10:30:34.0
126DurgawatiRohtasDistributariesStructureComplete2018-12-13 12:11:33.0
127DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 10:23:21.0
128DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 09:36:48.0
129GundlakammaAndhra PradeshPrakasamStructureMaincanalCompleteDLRB cum Drain2019-11-18 12:08:01.0
130Int. Anandapur Barrage Ph. IOdishaKendujharMaincanalMain CanalCompleteMDR bridge under construction2019-08-27 17:45:56.0
131SRSP St. IITelanganaWarangalDistributariesDistributariesCompleteDBM602019-12-05 12:47:11.0
132KaranjaKarnatakaBidarMain CanalMain CanalCompleteD1 A2019-12-23 11:17:09.0
133KhadakpurnaBuldanaMaincanalMain CanalOnGoing2019-05-08 11:46:58.0
134Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteshekapur minor 12019-08-05 18:07:02.0
135Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:23:45.0
136Mahan ProjectChhindwaraBranchCanalStructureOngoing2018-12-13 12:47:40.0
137Sagad ProjectMadhya PradeshVidishaDistributariesDistributariesCompletedistributary no.32019-06-13 11:50:58.0
138Upper Indravati (KBK)OdishaKalahandiMaincanalMain CanalCompleteLeft Main Canal2019-06-06 11:25:54.0
139Upper TungaHaveriMainCanalMaincanalComplete2018-12-12 13:52:41.0
140nullChhatarpurMainCanalMaincanalComplete2018-10-04 11:09:09.0
141nullKargilMainCanalMaincanalOngoing2018-10-02 09:41:13.0
142DhansiriUdalguriDistributariesMaincanalOngoing2018-12-12 11:37:56.0
143DurgawatiRohtasDistributariesOutletComplete2018-12-13 11:46:16.0
144nullKargilMainCanalMaincanalOngoing2018-10-02 09:41:13.0
145Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteKalampur Minor2019-06-06 09:32:53.0
146Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:20:59.0
147Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:43:11.0
148Singhpur ProjectChhatarpurMainCanalMaincanalComplete2018-10-03 15:43:17.0
149ChampamatiChirangMainCanalAnyOther2018-12-07 12:55:19.0
150Upper Indravati (KBK)OdishaKalahandiHeadWorksBarrageCompleteMangalpur2019-06-06 11:48:53.0
151Singhpur ProjectChhatarpurDistributariesAnyOther2018-10-03 16:58:01.0
152Dolaithabi BarrageManipurImphal EastDistributariesDistributariesYet To Be Completedfield channel2019-08-26 13:35:32.0
153PunpunRohtasDistributariesMaincanalComplete2018-12-13 10:44:32.0
154DurgawatiRohtasDistributariesOutletComplete2018-12-13 10:46:41.0
155DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 11:43:42.0
156DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 12:35:02.0
157DurgawatiRohtasMinors_Sub_MinorsMaincanalComplete2018-12-13 14:03:19.0
158DurgawatiRohtasMainCanalMaincanalOngoing2018-12-13 09:40:16.0
159DurgawatiRohtasDistributariesOutletComplete2018-12-13 12:36:38.0
160KeloRaigarhDistributariesMaincanalOngoing2018-12-20 15:25:40.0
161Mahi ProjectDharHeadworksDamComplete2018-12-04 15:29:46.0
162Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:24:50.0
163Upper TungaHaveriMinors_Sub_MinorsMaincanalComplete2018-12-12 14:20:11.0
164Saryu Nahar PariyojanaUttar PradeshBahraichHeadWorksBarrageComplete2019-08-05 18:08:28.0
165Singhpur ProjectChhatarpurMainCanalMaincanalComplete2018-10-03 15:43:17.0
166nullChhatarpurMainCanalStructureComplete2018-10-03 15:58:16.0
167Upper Indravati (KBK)KalahandiMainCanalStructureComplete2018-12-27 09:49:32.0
168DurgawatiRohtasDistributariesOutletComplete2018-12-13 12:01:34.0
169Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherWell2019-06-06 10:20:28.0
170Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:24:20.0
171Dolaithabi BarrageManipurImphal EastAny OtherDistributariesnullcompleted2019-08-26 14:26:55.0
172GundlakammaAndhra PradeshPrakasamDamHeadWorksCompleteDam2019-11-18 12:33:09.0
173Nardave (Mahammadwadi)MaharashtraSindhudurgHeadWorksDamYet To Be Completedthis is to be planned by March 20 on the first priority2019-12-05 13:14:31.0
174BoroliaWarangalHeadWorksDamCompletetest2019-05-03 14:23:28.0
175DhansiriUdalguriDistributariesMaincanalComplete2018-12-12 12:03:31.0
176Mahi ProjectDharMainCanalMaincanalComplete2018-12-04 17:09:11.0
177Maniyari Tank (ERM)MaincanalMain CanalComplete2019-06-18 12:45:36.0
178Bargi Diversion Project Ph- I (km. 16 to Km 63)JabalpurDistributariesStructureComplete2018-12-17 11:22:31.0
179ChampamatiChirangMainCanalAnyOther2018-12-07 11:48:41.0
180ChampamatiChirangBranchCanalMaincanalComplete2018-12-07 13:57:53.0
181DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 09:47:49.0
182DurgawatiRohtasMainCanalStructureOngoing2018-12-13 11:08:00.0
183Int. Anandapur Barrage Ph. IOdishaBaleshwarMaincanalStructureCompleted/s photo2019-08-28 12:53:34.0
184Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteshekapur minor 1 Fall2019-08-05 18:09:01.0
185Bansagar Unit - IISidhiBranchCanalStructureComplete2018-12-14 13:33:07.0
186Mahuar ProjectSidhiDistributariesOutletComplete2018-12-13 15:29:31.0
187Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:25:47.0
188NLBCYadgirMinors_Sub_MinorsAnyOther2018-11-08 15:05:47.0
189Sardar SarovarPatanDistributariesMaincanalComplete2018-12-06 12:47:10.0
190Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteKendupuda Minor2019-06-06 10:20:28.0
191Upper Indravati (KBK)OdishaKalahandiHeadWorksOtherLift Canal2019-06-06 11:51:37.0
192Upper Indravati (KBK)KalahandiMainCanalMaincanalComplete2018-12-27 09:42:38.0
193Dolaithabi BarrageImphal EastMainCanalStructureyettobecomplete2018-11-21 02:52:22.0
194Gosikhurd (NP)BhandaraHeadworksDamComplete2018-10-11 11:00:20.0
195Gosikhurd (NP)BhandaraMainCanalAnyOther2018-10-11 12:29:12.0
196Gosikhurd (NP)BhandaraDistributariesMaincanalOngoing2018-10-11 12:48:02.0
197Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:24:34.0
198Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:51:43.0
199Subernarekha MultipurposeJharkhandSaraikela-KharsawanHeadWorksBarrageComplete2019-06-27 18:05:53.0
200Bargi Diversion Projrct Ph- III (Km.104 to Km. 154)KatniMainCanalAnyOther2018-12-18 15:37:58.0
201Bargi Diversion Projrct Ph- III (Km.104 to Km. 154)KatniMainCanalStructureOngoing2018-12-18 16:07:14.0
202Bargi Diversion Projrct Ph- II (Km. 63 to Km. 104)JabalpurDistributariesMaincanalOngoing2018-12-18 17:20:41.0
203BoroliaWarangalHeadWorksDamCompletetest app2019-05-03 14:27:42.0
204DurgawatiRohtasMainCanalMaincanalComplete2018-12-13 10:09:25.0
205DurgawatiRohtasDistributariesOutletComplete2018-12-13 12:43:55.0
206Gosikhurd (NP)BhandaraMainCanalMaincanalOngoing2018-10-11 11:34:31.0
207Gosikhurd (NP)BhandaraDistributariesMaincanalComplete2018-10-11 13:02:25.0
208Gosikhurd (NP)BhandaraDistributariesMaincanalComplete2018-10-11 13:49:44.0
209SRSP St. IIWarangalMinors_Sub_MinorsMaincanalOngoing2018-09-28 17:03:36.0
210KeloRaigarhMinors_Sub_MinorsMaincanalOngoing2018-12-20 15:10:55.0
211Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:33:00.0
212Narmada CanalJalorMainCanalStructureOngoing2018-10-11 16:51:14.0
213nullJalorMainCanalStructureOngoing2018-10-11 17:17:25.0
214Narmada CanalJalorMainCanalMaincanalComplete2018-10-11 16:41:13.0
215nullJalorMainCanalStructureOngoing2018-10-11 17:18:20.0
216Subernarekha MultipurposeJharkhandSaraikela-KharsawanDistributariesDistributariesComplete2019-06-27 14:50:03.0
217Upper Indravati (KBK)OdishaKalahandiHeadWorksOtherLift Canal Pump House2019-06-06 12:14:39.0
218Upper Indravati (KBK)OdishaKalahandiHeadWorksOtherTail Race Channel2019-06-06 12:14:40.0
219Arjun ShayakMahobaHeadworksDamOngoing2018-10-30 13:08:13.0
220nullKamrup MetropolitanHeadworksDamnull2018-10-05 16:35:26.0
221nullKamrup MetropolitanHeadworksDamnull2018-10-05 16:35:26.0
222BoroliaWarangalHeadWorksDamCompletetest2019-05-03 16:22:16.0
223Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:51:58.0
224Subernarekha MultipurposeJharkhandSaraikela-KharsawanHeadWorksBarrageComplete2019-06-27 18:05:53.0
225Dolaithabi BarrageManipurImphal EastAny OtherDistributariesnullcompleted2019-08-26 14:28:17.0
226Madhya Ganga Canal Ph-IIUttar PradeshBijnorBarrageHeadWorksCompleteStorage provide water for irrigation to Madhya Ganga Canal Phase I & II and Augmentation of Upper Ganga Canal2019-08-28 17:15:55.0
227nullPrakasamHeadworksBarrageComplete2018-10-22 11:23:35.0
228Gosikhurd (NP)BhandaraBranchCanalAnyOther2018-10-11 12:43:18.0
229Gosikhurd (NP)BhandaraMinors_Sub_MinorsMaincanalOngoing2018-10-11 12:55:11.0
230Gosikhurd (NP)BhandaraMainCanalOutletComplete2018-10-10 11:55:56.0
231Gosikhurd (NP)BhandaraBranchCanalAnyOther2018-10-10 14:32:13.0
232nullBhandaraMainCanalMaincanalOngoing2018-10-10 17:16:33.0
233SRSP St. IINalgondaMainCanalMaincanalOngoing2018-09-28 17:03:36.0
234J. Chokka Rao LISWarangalHeadWorksOthernull2019-05-03 18:02:13.0
235SRSP St. IINalgondaMinors_Sub_MinorsMaincanalComplete2018-09-28 17:03:36.0
236SRSP St. IINalgondaDistributariesMaincanalOngoing2018-09-28 17:03:36.0
237Int. Anandapur Barrage Ph. IOdishaBaleshwarMaincanalMain CanalYet To Be Completedcritical LA issues, land owners refusing to receive compensation2019-08-28 12:57:34.0
238Lower PedhiAmravatiBranchCanalStructureOngoing2018-10-09 17:30:24.0
239Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletekhamgaon minor 12019-08-05 18:42:48.0
240Madhya Ganga Canal Ph-IIUttar PradeshBijnorStructureMain CanalOnGoingPermission for cutting trees in Main Canal alignment granted2019-08-29 11:43:07.0
241Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:33:51.0
242Waghur ProjectJalgaonMaincanalMain CanalYet To Be Completed2019-05-08 16:35:55.0
243Gosikhurd (NP)BhandaraMainCanalStructureComplete2018-10-11 13:33:56.0
244Maniyari Tank (ERM)HeadWorksDamComplete2019-06-18 12:53:06.0
245Subernarekha MultipurposeJharkhandSaraikela-KharsawanHeadWorksBarrageCompleteKharkai2019-06-27 18:08:13.0
246Waghur ProjectJalgaonMaincanalMain CanalOnGoing2019-05-08 17:00:51.0
247Madhya Ganga Canal Ph-IIUttar PradeshBijnorOtherHeadWorksCompleteHead Regulator of Madhya Ganga Left Bank Canal Phase II2019-08-28 17:21:22.0
248GundlakammaAndhra PradeshPrakasamDamHeadWorksCompleteDam2019-11-18 12:33:38.0
249Arjun ShayakUttar PradeshMahobaOtherHeadWorksOnGoingR&R Issues and Demand of Compensation on Present Rates2019-11-26 14:16:18.0
250Nardave (Mahammadwadi)MaharashtraSindhudurgStructureMain CanalCompletecompleted in 20072019-12-05 13:17:28.0
251Gosikhurd (NP)BhandaraMainCanalAnyOther2018-10-12 09:18:49.0
252ChampamatiChirangMainCanalAnyOther2018-12-07 12:08:32.0
253Gosikhurd (NP)BhandaraBranchCanalMaincanalOngoing2018-10-10 14:25:48.0
254Gosikhurd (NP)BhandaraMainCanalStructureComplete2018-10-12 10:00:45.0
255Gosikhurd (NP)BhandaraBranchCanalAnyOther2018-10-11 14:09:44.0
256KaranjaKarnatakaBidarStructureDistributariesComplete2019-12-23 11:35:49.0
257Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletekhamgaon minor 12019-08-05 18:43:45.0
258Madhya Ganga Canal Ph-IIUttar PradeshBijnorStructureMain CanalOnGoing2019-08-29 12:28:27.0
259Madhya Ganga Canal Ph-IIUttar PradeshJyotiba Phule NagarStructureMain CanalCompleteHead Regulators of Chandausi and Bahjoi Branch Canal2019-08-29 14:23:17.0
260Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:41:13.0
261nullErnakulamMinors_Sub_MinorsMaincanalOngoing2018-10-12 10:20:18.0
262Nandur Madhmeshwar Ph. IIAurangabadMinors_Sub_MinorsAnyOther2018-11-28 13:39:52.0
263Narmada CanalJalorMainCanalMaincanalComplete2018-10-11 16:39:17.0
264Narmada CanalJalorMainCanalStructureOngoing2018-10-11 16:44:50.0
265Narmada CanalJalorMainCanalStructureComplete2018-10-12 10:33:29.0
266Narmada CanalJalorMainCanalStructureComplete2018-10-12 10:37:45.0
267Sardar SarovarKachchhBranchCanalMaincanalOngoing2018-12-05 10:19:55.0
268Upper TungaHaveriMinors_Sub_MinorsStructureComplete2018-12-12 12:52:10.0
269Waghur ProjectJalgaonBranch CanalBranch CanalComplete2019-05-08 17:11:06.0
270Subernarekha MultipurposeJharkhandSaraikela-KharsawanHeadWorksBarrageCompleteKharkai2019-06-27 18:12:51.0
271Subernarekha MultipurposeJharkhandSaraikela-KharsawanHeadWorksBarrageCompleteKharkai2019-06-27 18:12:51.0
272Subernarekha MultipurposeJharkhandSaraikela-KharsawanHeadWorksDamOnGoing2019-06-27 18:12:52.0
273WardhaHeadworksDamComplete2018-09-28 17:03:36.0
274KeloRaigarhMainCanalCriticalIssueyettobecomplete2018-12-20 15:56:26.0
275Gosikhurd (NP)BhandaraBranchCanalMaincanalComplete2018-10-10 14:46:09.0
276Gosikhurd (NP)BhandaraMainCanalStructureComplete2018-10-12 09:33:41.0
277nullChandrapurMainCanalMaincanalOngoing2018-10-17 13:58:26.0
278Gosikhurd (NP)BhandaraMainCanalMaincanalComplete2018-10-17 12:34:14.0
279Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:08:31.0
280Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:43:18.0
281Narmada CanalJalorMainCanalStructureComplete2018-10-12 10:30:45.0
282Narmada CanalJalorMainCanalStructureComplete2018-10-12 10:35:20.0
283Subernarekha MultipurposeJharkhandPurbi SinghbhumDistributariesDistributariesCompleteKashidih minor2019-06-28 10:25:43.0
284Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:44:17.0
285Subernarekha MultipurposeJharkhandPurbi SinghbhumDistributariesDistributariesCompleteKhasidi2019-06-28 10:25:43.0
286Subernarekha MultipurposeJharkhandPurbi SinghbhumMinors/ Sub-MinorsMinors/ Sub-MinorsCompletemahuliya subminor2019-06-28 11:43:17.0
287Subernarekha MultipurposeJharkhandPurbi SinghbhumMinors/ Sub-MinorsOutletCompleteturnout2019-06-28 11:43:17.0
288Subernarekha MultipurposeJharkhandPurbi SinghbhumMinors/ Sub-MinorsStructureComplete2019-06-28 11:43:18.0
289Subernarekha MultipurposeJharkhandPurbi SinghbhumMaincanalStructureOnGoing2019-06-28 14:05:13.0
290GundlakammaPrakasamMinors_Sub_MinorsAnyOther2018-10-22 12:13:26.0
291DhansiriUdalguriDistributariesMaincanalOngoing2018-12-12 12:16:48.0
292Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:44:17.0
293Madhya Ganga Canal Ph-IIUttar PradeshBijnorBarrageHeadWorksCompleteDownstream Side2019-08-28 17:26:32.0
294Arjun ShayakMahobaMainCanalMaincanalComplete2018-10-29 15:35:36.0
295Arjun ShayakMahobaHeadworksDamComplete2018-10-29 15:37:33.0
296--Select--HaveriMainCanalMaincanalOngoing2018-12-13 11:34:30.0
297Gosikhurd (NP)ChandrapurMainCanalMaincanalOngoing2018-10-17 14:01:15.0
298nullPrakasamBranchCanalMaincanalComplete2018-10-22 12:51:38.0
299GundlakammaPrakasamBranchCanalMaincanalComplete2018-10-22 12:54:00.0
300nullPrakasamMainCanalMaincanalComplete2018-10-22 14:07:06.0
301nullPrakasamDistributariesMaincanalComplete2018-10-22 14:08:06.0
302SRSP St. IIWarangalMinors_Sub_MinorsMaincanalOngoing2018-09-28 17:03:36.0
303nullPrakasamDistributariesMaincanalComplete2018-10-22 14:09:28.0
304SRSP St. IIWarangalBranchCanalMaincanalOngoing2018-09-28 17:03:36.0
305J. Chokka Rao LISWarangalMaincanalStructureComplete2019-05-03 16:26:00.0
306Madhya Ganga Canal Ph-IIUttar PradeshBijnorStructureMain CanalComplete2019-08-29 12:46:58.0
307Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:10:10.0
308Sri KomarambheemTelanganaAdilabadDistributariesDistributariesComplete2019-08-29 14:27:41.0
309Mod. of Gang CanalMinors_Sub_MinorsOutletComplete2018-09-28 17:03:36.0
310Arjun ShayakMahobaHeadworksDamComplete2018-10-29 15:45:50.0
311Arjun ShayakMahobaHeadworksDamComplete2018-10-29 15:50:57.0
312Upper Indravati (KBK)KalahandiMinors_Sub_MinorsMaincanalComplete2018-12-27 12:26:43.0
313Upper TungaHaveriDistributariesMaincanalOngoing2018-12-13 12:47:21.0
314KanupurOdishaKendujharHeadWorksDamYet To Be CompletedHL Bridge over spillchannel on NH yet to be started2019-08-31 18:17:48.0
315Arjun ShayakMahobaMainCanalMaincanalOngoing2018-10-29 18:22:07.0
316Arjun ShayakMahobaMainCanalAnyOther2018-10-30 10:30:44.0
317Arjun ShayakMahobaMainCanalAnyOther2018-10-30 10:32:57.0
318Arjun ShayakMahobaMainCanalAnyOther2018-10-30 11:48:28.0
319Upper Indravati (KBK)KalahandiDistributariesMaincanalComplete2018-12-27 11:09:47.0
320DurgawatiRohtasMainCanalMaincanalComplete2018-12-13 10:10:16.0
321DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 10:22:04.0
322DurgawatiRohtasMainCanalStructureOngoing2018-12-13 11:10:06.0
323KudaliMaharashtraSataraHeadWorksDamOnGoingHathyar Dam2019-06-28 10:35:26.0
324Madhya Ganga Canal Ph-IIUttar PradeshBijnorStructureMain CanalOnGoingCourt Case resolved2019-08-28 18:10:51.0
325Madhya Ganga Canal Ph-IIUttar PradeshJyotiba Phule NagarStructureMain CanalOnGoing2019-08-29 13:21:28.0
326Mod. of Gang CanalBranchCanalAnyOther2018-09-28 17:03:36.0
327Mod. of Gang CanalBranchCanalAnyOther2018-09-28 17:03:36.0
328Mod. of Gang CanalBranchCanalAnyOther2018-09-28 17:03:36.0
329ThoubalThoubalMainCanalAnyOther2018-12-27 12:20:41.0
330ThoubalThoubalMainCanalAnyOther2018-12-27 12:25:30.0
331Upper Indravati (KBK)KalahandiMinors_Sub_MinorsMaincanalComplete2018-12-27 12:36:34.0
332NLBCYadgirMaincanalAny Othernull2019-03-11 16:38:29.0
333NLBCYadgirBranch CanalStructureComplete2019-03-11 16:41:15.0
334Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:44:33.0
335NLBCYadgirMaincanalAny Othernull2019-03-11 16:57:23.0
336NLBCYadgirMaincanalAny Othernull2019-03-11 16:57:31.0
337Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:45:00.0
338ChampamatiAssamGandhinagarOtherHeadWorksnull2019-06-28 14:51:31.0
339DurgawatiKaimur (Bhabua)MainCanalMaincanalComplete2018-12-13 17:10:59.0
340Gosikhurd (NP)BhandaraDistributariesMaincanalOngoing2018-10-12 11:00:23.0
341NLBCYadgirBranchCanalMaincanalComplete2018-11-08 16:13:23.0
342NLBCYadgirDistributariesStructureComplete2019-03-11 17:07:11.0
343Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompletefor testing2019-06-28 14:53:43.0
344Sardar SarovarGujaratGandhinagarMaincanalMain CanalCompletesample photo2019-06-28 15:46:56.0
345Subernarekha MultipurposeJharkhandPurbi SinghbhumMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingsubminor 3 of khasidi Dy2019-06-28 10:38:11.0
346Subernarekha MultipurposeJharkhandPurbi SinghbhumMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingsubminor 32019-06-28 10:38:12.0
347Subernarekha MultipurposeJharkhandPurbi SinghbhumMaincanalStructureOnGoingAquaduct2019-06-28 16:13:13.0
348Upper Indravati (KBK)KalahandiMinors_Sub_MinorsMaincanalComplete2018-12-27 11:12:15.0
349Subernarekha MultipurposeJharkhandSaraikela-KharsawanHeadWorksDamOnGoingSpillway2019-06-29 12:41:57.0
350ChampamatiAssamGandhinagarOtherHeadWorksnull2019-06-28 14:54:50.0
351Lower PanzaraMaincanalStructureComplete2019-07-07 09:44:44.0
352Lower PanzaraMaincanalStructureComplete2019-07-07 09:44:47.0
353Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:49:57.0
354Mod. of Gang CanalRajasthanGanganagarAny OtherMinors/ Sub-MinorsnullT minor 2019-07-17 10:20:40.0
355Mod. of Gang CanalRajasthanGanganagarMinors/ Sub-MinorsAny OtherT Chak2019-07-17 10:45:29.0
356Mod. of Gang CanalRajasthanGanganagarOutletMinors/ Sub-MinorsComplete30 H2019-07-17 12:49:30.0
357Mod. of Gang CanalRajasthanGanganagarOutletMinors/ Sub-MinorsComplete29 PS(A) 2019-07-17 16:37:40.0
358Sardar SarovarGujaratGandhinagarStructureMaincanalComplete2019-06-28 14:38:14.0
359Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompletefor testing2019-06-28 14:52:13.0
360Subernarekha MultipurposeJharkhandPurbi SinghbhumMaincanalStructureOnGoingaquaduct2019-06-28 16:13:13.0
361Subernarekha MultipurposeJharkhandPurbi SinghbhumHeadWorksBarrageComplete2019-06-28 16:26:03.0
362Subernarekha MultipurposeJharkhandPurbi SinghbhumMaincanalMain CanalCompleteGRMC2019-06-28 16:26:54.0
363Subernarekha MultipurposeJharkhandPurbi SinghbhumMaincanalMain CanalCompleteGRMC2019-06-28 17:01:45.0
364Subernarekha MultipurposeJharkhandSaraikela-KharsawanMaincanalMain CanalCompleteGuari Canal2019-06-29 12:43:55.0
365NawadaBranch CanalOnGoing123452019-07-25 16:14:09.0
366Sri KomarambheemTelanganaAdilabadHeadWorksDamComplete2019-08-29 13:34:59.0
367KanupurOdishaKendujharHeadWorksDamOnGoingDelayed progress2019-08-31 18:17:51.0
368Arjun ShayakUttar PradeshMahobaStructureMain CanalOnGoingElectrical Pole shifting done, work completed upto 80%2019-11-26 15:17:31.0
369Nandur Madhmeshwar Ph. IIMaharashtraSindhudurgHeadWorksDamOnGoing2019-12-05 14:39:39.0
370DurgawatiRohtasHeadworksDamComplete2018-12-13 16:32:44.0
371Gosikhurd (NP)BhandaraHeadworksDamnull2018-10-16 18:07:51.0
372Bargi Diversion Projrct Ph- II (Km. 63 to Km. 104)JabalpurDistributariesStructureComplete2018-12-17 11:11:23.0
373ChampamatiKokrajharBranch CanalBranch CanalCompleteRBC32019-05-11 14:20:49.0
374Gosikhurd (NP)ChandrapurMainCanalStructureComplete2018-10-12 12:22:41.0
375GundlakammaAndhra PradeshPrakasamStructureBranch CanalCompleteOfftake 2019-11-18 12:38:06.0
376KaranjaKarnatakaBidarStructureDistributariesCompleteLining work is in progress2019-12-23 11:53:33.0
377KaranjaKarnatakaBidarMain CanalMain CanalCompletedown stream at Railway crossing on atiwal lift2019-12-23 13:28:53.0
378KeloRaigarhMainCanalMaincanalComplete2018-12-20 16:16:41.0
379KeloRaigarhDistributariesMaincanalComplete2018-12-20 16:40:20.0
380KeloRaigarhMainCanalStructureComplete2018-12-21 09:50:23.0
381Waghur ProjectJalgaonMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoing2019-05-09 11:28:39.0
382Madhya Ganga Canal Ph-IIUttar PradeshBijnorStructureMain CanalOnGoing2019-08-28 19:02:33.0
383Mod. of Gang CanalBranchCanalAnyOther2018-09-28 17:03:36.0
384Mod. of Gang CanalMainCanalStructureComplete2018-09-28 17:03:36.0
385Mod. of Gang CanalRajasthanGanganagarOutletMinors/ Sub-MinorsComplete29 PS(A) 2019-07-17 16:39:21.0
386Mod. of Gang CanalMainCanalStructureComplete2018-09-28 17:03:36.0
387Mod. of Gang CanalRajasthanGanganagarOutletMinors/ Sub-MinorsComplete30 H2019-07-17 12:50:40.0
388Sardar SarovarKachchhBranchCanalStructureOngoing2018-12-05 09:59:10.0
389Sardar SarovarPatanMinors_Sub_MinorsOutletComplete2018-12-06 13:20:21.0
390Sri KomarambheemTelanganaAdilabadStructureMaincanalComplete2019-08-29 14:30:43.0
391KeloRaigarhHeadworksDamComplete2018-12-21 10:00:39.0
392Upper TungaHaveriMaincanalStructureOnGoing2019-03-14 11:11:57.0
393Sri Rameshwar IrrigationBelgaumHeadWorksOthernull2019-03-13 11:07:54.0
394Sri Rameshwar IrrigationBelgaumHeadWorksOthernull2019-03-13 11:08:14.0
395Sri Rameshwar IrrigationBelgaumHeadWorksOthernull2019-03-13 11:10:28.0
396Sri Rameshwar IrrigationBelgaumHeadWorksOthernull2019-03-13 11:10:31.0
397Upper TungaHaveriMaincanalStructureOnGoing2019-03-14 11:02:30.0
398BoroliaAssamNawadaDamHeadWorksCompletetest2019-07-26 17:25:29.0
399KeloRaigarhMainCanalStructurenull2018-12-21 09:51:59.0
400Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:50:12.0
401Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 13:51:10.0
402Mod. of Gang CanalRajasthanGanganagarOutletMinors/ Sub-MinorsComplete83 RB2019-07-17 18:09:26.0
403MusuramilliEast GodavariDistributariesStructureComplete2018-12-05 13:32:31.0
404MusuramilliEast GodavariDistributariesStructureComplete2018-12-05 13:32:32.0
405Mod. of Gang CanalRajasthanGanganagarOutletMinors/ Sub-MinorsComplete30 H2019-07-17 12:50:42.0
406Nandur Madhmeshwar Ph. IInullOutletOnGoing2019-07-07 09:45:36.0
407PalemvaguKhammamDistributariesDistributariesOnGoing2019-05-04 14:45:49.0
408PalemvaguTelanganaKhammamDistributariesDistributariesOnGoingD142019-07-29 10:38:44.0
409BoroliaAssamGandhinagarMain CanalMaincanalComplete2019-06-28 14:38:39.0
410Sardar SarovarPatanMinors_Sub_MinorsOutletnull2018-12-06 13:11:40.0
411Sri Rameshwar IrrigationBelgaumDistributariesAny Othernull2019-03-13 13:26:20.0
412ThoubalThoubalBranchCanalAnyOther2018-12-27 10:29:48.0
413ThoubalThoubalMainCanalAnyOther2018-12-27 10:23:37.0
414ThoubalThoubalMainCanalAnyOther2018-12-27 10:32:07.0
415ThoubalThoubalMainCanalAnyOther2018-12-27 10:41:53.0
416Upper Indravati (KBK)KalahandiMinors_Sub_MinorsMaincanalComplete2018-12-27 10:23:10.0
417Upper Indravati (KBK)KalahandiMainCanalMaincanalComplete2018-12-27 13:08:28.0
418Upper Indravati (KBK)KalahandiDistributariesStructureComplete2018-12-27 13:10:55.0
419PalemvaguTelanganaKhammamDistributariesDistributariesOnGoingD152019-07-29 10:38:45.0
420Tadipudi LISAndhra PradeshWest GodavariOtherHeadWorksnull2019-09-06 11:19:59.0
421Upper Indravati (KBK)KalahandiMinors_Sub_MinorsMaincanalComplete2018-12-27 12:43:17.0
422Upper Indravati (KBK)KalahandiDistributariesMaincanalComplete2018-12-27 13:11:52.0
423Waghur ProjectJalgaonHeadWorksOthernull2019-05-09 10:27:43.0
424Upper TungaHaveriMaincanalStructureOnGoing2019-03-14 11:09:43.0
425Dolaithabi BarrageImphal EastMainCanalAnyOther2018-12-27 16:38:47.0
426Int. Anandapur Barrage Ph. IOdishaBaleshwarMaincanalMain CanalComplete2019-08-29 09:41:11.0
427Madhya Ganga Canal Ph-IIUttar PradeshJyotiba Phule NagarStructureMain CanalOnGoing2019-08-29 13:49:57.0
428Mod. of Gang CanalRajasthanGanganagarOutletMinors/ Sub-MinorsComplete20 FF2019-07-17 14:16:15.0
429Mod. of Gang CanalRajasthanGanganagarOutletMinors/ Sub-MinorsComplete83 RB2019-07-17 18:11:12.0
430Nandur Madhmeshwar Ph. IInullOutletOnGoing2019-07-07 09:45:38.0
431Peddavagu @ NeelwaiTelanganaAdilabadMain CanalMain CanalOnGoingRD4.050Km approach canal to rmc2019-11-22 12:09:41.0
432Sardar SarovarGujaratGandhinagarStructureMaincanalComplete2019-06-28 14:39:07.0
433Sri KomarambheemTelanganaAdilabadStructureMaincanalComplete2019-08-29 14:33:08.0
434ThoubalThoubalMainCanalAnyOther2018-12-27 10:46:37.0
435ThoubalThoubalMainCanalAnyOther2018-12-27 13:33:19.0
436Upper Indravati (KBK)KalahandiMainCanalMaincanalComplete2018-12-27 10:45:45.0
437Upper Indravati (KBK)KalahandiDistributariesMaincanalComplete2018-12-27 10:48:34.0
438Upper Indravati (KBK)KalahandiMainCanalMaincanalComplete2018-12-27 10:54:08.0
439Upper Indravati (KBK)KalahandiDistributariesMaincanalComplete2018-12-27 10:55:32.0
440Sardar SarovarGujaratNawadaHeadWorksBarrageYet To Be Completed3332019-07-26 17:26:46.0
441Upper TungaHaveriMaincanalStructureOnGoing2019-03-14 12:34:12.0
442Upper TungaHaveriMaincanalStructureYet To Be Completed2019-03-14 12:35:24.0
443Upper TungaHaveriMaincanalStructureOnGoing2019-03-14 12:36:37.0
444Upper TungaHaveriMinors/ Sub-MinorsAny Othernull2019-03-14 16:22:04.0
445Dolaithabi BarrageImphal EastMainCanalMaincanalOngoing2018-11-21 02:56:42.0
446Mahuar ProjectMadhya PradeshShivpuriHeadWorksDamCompletelocated at shivpuri district2019-07-27 12:01:54.0
447Sindh Project Ph - IIMadhya PradeshShivpuriOtherHeadWorksnullcapacity of 100 mcm2019-07-29 11:01:17.0
448Upper TungaHaveriMinors/ Sub-MinorsAny Othernull2019-03-14 16:26:31.0
449Upper TungaHaveriMaincanalStructureOnGoing2019-03-14 11:15:22.0
450ChampamatiKokrajharMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteMicro lift irrigation2019-05-11 14:39:34.0
451nullChandrapurMainCanalMaincanalOngoing2018-10-17 13:56:56.0
452Madhya Ganga Canal Ph-IIUttar PradeshJyotiba Phule NagarStructureBranch CanalOnGoingOfftake of Shakarpur, Hasanpur, Bagarpur Dys2019-08-29 14:49:32.0
453Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 14:41:16.0
454Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 14:44:37.0
455Mod. of Gang CanalMinors_Sub_MinorsOutletComplete2018-09-28 17:03:36.0
456Nandur Madhmeshwar Ph. IInullOutletOnGoing2019-07-07 09:45:42.0
457PalemvaguKhammamDistributariesDistributariesOnGoing2019-05-04 14:48:20.0
458Sardar SarovarGujaratGandhinagarOutletMaincanalComplete2019-06-28 14:42:00.0
459Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompletefor testing2019-06-28 14:58:13.0
460Subernarekha MultipurposeJharkhandPurbi SinghbhumDistributariesDistributariesCompleteOR472019-06-28 12:55:56.0
461Upper TungaHaveriMaincanalStructureOnGoing2019-03-14 11:38:45.0
462Upper TungaHaveriMaincanalCritical Issue / BottleneckYet To Be Completed2019-03-14 12:06:55.0
463Upper TungaHaveriDistributariesCritical Issue / BottleneckOnGoing2019-03-14 12:51:52.0
464Upper TungaHaveriMinors/ Sub-MinorsAny Othernull2019-03-14 16:25:40.0
465Waghur ProjectJalgaonHeadWorksOthernull2019-05-09 10:29:12.0
466Lower PanzaraDhuleHeadWorksOtherGotane2019-05-28 13:51:37.0
467Tadipudi LISAndhra PradeshEast GodavariOtherHeadWorksnullPump House with 4 motors 2019-09-06 11:33:08.0
468Arjun ShayakUttar PradeshMahobaMain CanalMain CanalOnGoing2019-11-25 16:54:23.0
469J. Chokka Rao LISWarangalHeadWorksOthernull2019-05-03 10:23:16.0
470SubernarekhaOdishaMayurbhanjHeadWorksOtherunder progress2019-07-30 08:49:59.0
471Lower WardhaMaharashtraWardhaBranch CanalBranch CanalComplete2019-08-05 11:51:53.0
472Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-08-05 16:10:07.0
473Indira Sagar Project Canal Ph I & II (Km. 0 to Km. 142)West NimarnullOutletComplete2019-02-26 11:35:08.0
474Indira Sagar Project Canal Ph I & II (Km. 0 to Km. 142)West NimarnullOutletComplete2019-02-26 12:00:42.0
475KanupurOdishaKendujharMaincanalStructureOnGoingLikely to be completed by June 20202019-08-29 10:51:57.0
476KeloRaigarhMainCanalStructureOngoing2018-12-21 10:42:32.0
477KeloRaigarhMainCanalMaincanalComplete2018-12-21 11:10:08.0
478KeloRaigarhMainCanalStructureOngoing2018-12-21 11:28:08.0
479Lower PanzaraDhuleMinors/ Sub-MinorsAny Othernull2019-03-06 16:37:56.0
480Madhya Ganga Canal Ph-IIUttar PradeshJyotiba Phule NagarStructureBranch CanalOnGoingVRB at Chandausi Branch Canal2019-08-29 16:45:29.0
481Kandi Canal Ext. (Ph. II)PunjabSouthMinors/ Sub-MinorsMinors/ Sub-MinorsCompletetest2019-08-02 16:28:50.0
482Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 14:46:23.0
483Mod. of Gang CanalMinors_Sub_MinorsOutletnull2018-09-28 17:03:36.0
484Nardave (Mahammadwadi)MaharashtraSindhudurgMain CanalAny OtherComplete2019-12-05 14:52:44.0
485Peddavagu @ NeelwaiTelanganaAdilabadDistributariesDistributariesComplete6l distributaes2019-11-22 12:15:25.0
486Mahan ProjectChhindwaraBranchCanalStructureOngoing2018-12-13 13:20:16.0
487ChampamatiAssamGandhinagarOutletMaincanalComplete2019-06-28 14:42:23.0
488Subernarekha MultipurposeJharkhandPurbi SinghbhumMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteOR462019-06-28 13:13:35.0
489Lower PanzaraDhuleMaincanalAny Othernull2019-03-06 19:02:43.0
490Waghur ProjectJalgaonnullOutletComplete2019-03-08 07:10:10.0
491Waghur ProjectJalgaonHeadWorksDamComplete2019-03-07 17:47:27.0
492Waghur ProjectJalgaonHeadWorksDamComplete2019-03-11 11:15:19.0
493Waghur ProjectJalgaonHeadWorksDamComplete2019-03-11 11:17:13.0
494Waghur ProjectJalgaonHeadWorksDamComplete2019-03-11 11:17:15.0
495Tadipudi LISAndhra PradeshEast GodavariOtherHeadWorksnullintake from Godavari river2019-09-06 11:35:04.0
496Peddavagu @ NeelwaiTelanganaAdilabadHeadWorksOtherComplete2019-11-22 12:46:21.0
497Arjun ShayakUttar PradeshMahobaDamHeadWorksCompleteWater stored 2019-11-26 09:47:15.0
498Sri Rameshwar IrrigationBelgaumHeadWorksOthernull2019-03-13 11:11:14.0
499Sri Rameshwar IrrigationBelgaumHeadWorksOthernull2019-03-13 11:16:15.0
500Lower WardhaMaharashtraWardhaBranch CanalBranch CanalComplete2019-08-05 11:53:04.0
501Lower WardhaMaharashtraWardhaOutletMinors/ Sub-MinorsComplete2019-08-05 16:12:20.0
502Indiramma Flood Flow CanalKarimnagarHeadWorksOthernull2019-03-11 11:25:49.0
503KanupurOdishaKendujharMaincanalMain CanalOnGoingAqueduct over Silisuan nallah2019-08-29 10:51:59.0
504Lower PanzaraDhuleMaincanalAny Othernull2019-03-06 19:09:54.0
505Maniyari Tank (ERM)MaincanalMain CanalOnGoing2019-06-18 14:59:44.0
506NLBCYadgirMaincanalStructureComplete2019-03-11 16:29:17.0
507Sardar SarovarGujaratGandhinagarMain CanalMaincanalOnGoing2019-06-28 14:42:54.0
508Saryu Nahar PariyojanaUttar PradeshShrawastiMain CanalMain CanalOnGoingRapti link channel2019-08-06 11:52:31.0
509Saryu Nahar PariyojanaUttar PradeshShrawastiMain CanalMain CanalCompleterapti main canal2019-08-06 16:36:31.0
510SubernarekhaOdishaMayurbhanjMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoing2019-07-30 09:47:00.0
511Lower WardhaMaharashtraWardhaStructureBranch CanalComplete2019-08-06 12:55:02.0
512Sri Rameshwar IrrigationBelgaumHeadWorksOthernull2019-03-13 11:17:02.0
513Upper TungaHaveriDistributariesCritical Issue / BottleneckOnGoing2019-03-14 12:53:09.0
514Upper TungaHaveriDistributariesCritical Issue / BottleneckYet To Be Completed2019-03-14 12:53:42.0
515Upper TungaHaveriDistributariesStructureOnGoing2019-03-14 13:25:43.0
516BoroliaAssamLucknowDamHeadWorksCompletetest app by bisag 13_09_20092019-09-13 14:45:44.0
517BoroliaAssamLucknowStructureMain CanalCompletetest app by bisag2019-09-17 14:49:28.0
518Lower WardhaMaharashtraWardhaAny OtherBranch CanalComplete2019-08-05 11:55:12.0
519Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-08-05 16:13:56.0
520Saryu Nahar PariyojanaUttar PradeshShrawastiMain CanalStructureOnGoingin progress2019-08-06 12:57:15.0
521Tadipudi LISAndhra PradeshWest GodavariDistributariesDistributariesCompleteDistributary 42019-09-06 12:11:38.0
522Saryu Nahar PariyojanaUttar PradeshShrawastiMinors/ Sub-MinorsOutletCompleteBidhuni minor Basti branch2019-08-07 10:14:20.0
523Saryu Nahar PariyojanaUttar PradeshBalrampurMain CanalAny OtherCompleteRapti main canal RD 69.835 km2019-08-07 13:42:12.0
524Sindh Project Ph - IIMadhya PradeshGwaliorHeadWorksOtherRD 1725m2019-07-30 11:31:24.0
525Sri Rameshwar IrrigationBelgaumMaincanalStructureComplete2019-03-13 12:23:07.0
526Sri Rameshwar IrrigationBelgaumMaincanalAny Othernull2019-03-13 12:24:17.0
527Sri Rameshwar IrrigationBelgaumnullOutletComplete2019-03-13 12:41:35.0
528Sri Rameshwar IrrigationBelgaumMaincanalStructureComplete2019-03-13 13:02:31.0
529Lower WardhaMaharashtraYavatmalHeadWorksOtherComplete2019-08-07 13:49:08.0
530Upper TungaHaveriMinors/ Sub-MinorsAny Othernull2019-03-14 16:20:01.0
531Upper TungaHaveriDistributariesStructureOnGoing2019-03-14 13:26:27.0
532Nardave (Mahammadwadi)MaharashtraSindhudurgMain CanalAny OtherComplete2019-12-05 14:53:46.0
533Upper TungaHaveriMaincanalStructureComplete2019-03-14 13:56:30.0
534Bhima LISKarnatakaBijapurBarrageHeadWorksComplete2019-12-24 11:21:34.0
535Bhima LISKarnatakaGulbargaOtherHeadWorksCompleteIntake Channel2019-12-24 11:56:33.0
536Lower WardhaMaharashtraWardhaBranch CanalBranch CanalCompletevegetation in canal.2019-08-05 11:56:32.0
537Lower WardhaMaharashtraWardhaOutletMinors/ Sub-MinorsComplete2019-08-05 16:15:32.0
538Lower WardhaMaharashtraYavatmalBarrageHeadWorksOnGoing2019-08-06 13:46:27.0
539Peddavagu @ NeelwaiTelanganaAdilabadMain CanalMain CanalComplete2019-11-22 12:47:11.0
540J. Chokka Rao LISWarangalMaincanalAny Othernull2019-05-04 09:28:52.0
541J. Chokka Rao LISWarangalDistributariesDistributariesOnGoing2019-05-03 11:25:16.0
542KaranjaKarnatakaBidarStructureMain CanalOnGoingwork in progress 2019-12-23 12:04:30.0
543Lower WardhaMaharashtraYavatmalHeadWorksOtherComplete2019-08-07 12:28:32.0
544Tadipudi LISAndhra PradeshWest GodavariMain CanalMaincanalCompletemain canal at ch:11.0662019-09-06 12:13:01.0
545Rajiv Bhima LISTelanganaMahbubnagarMaincanalMain CanalCompleteRD8.0KM2019-09-24 12:47:20.0
546Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompletetesting2019-06-28 14:43:57.0
547Sardar SarovarKachchhBranchCanalStructureOngoing2018-12-05 10:22:16.0
548Saryu Nahar PariyojanaUttar PradeshBalrampurMain CanalStructureOnGoingon Rapti main canal2019-08-07 14:08:35.0
549Sindh Project Ph - IIMadhya PradeshGwaliorMain CanalMaincanalCompletecompleted by 20162019-07-30 11:38:28.0
550Sardar SarovarGujaratLucknowHeadWorksBarrageCompletetest app by bisag offline 13_09_20092019-09-13 14:47:12.0
551BoroliaAssamLucknowMain CanalMain CanalCompletetest app by bisag2019-09-17 14:55:41.0
552Peddavagu @ NeelwaiTelanganaAdilabadHeadWorksDamComplete2019-11-22 12:48:15.0
553Waghur ProjectJalgaonMaincanalMain CanalComplete2019-05-09 12:17:34.0
554Dolaithabi BarrageImphal EastMainCanalMaincanalOngoing2018-11-21 02:59:01.0
555BoroliaAssamLucknowMain CanalMain CanalComplete122019-09-17 14:59:37.0
556DurgawatiRohtasDistributariesMaincanalComplete2018-12-13 11:36:47.0
557Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-08-05 12:33:01.0
558Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingpimpalgaon minor2019-08-05 16:34:43.0
559Lower WardhaMaharashtraYavatmalBarrageHeadWorksOnGoing2019-08-06 13:46:48.0
560ChampamatiChirangBranch CanalBranch CanalComplete2019-05-11 11:46:27.0
561DhansiriUdalguriDistributariesMaincanalOngoing2018-12-12 12:59:23.0
562DhansiriUdalguriDistributariesMaincanalOngoing2018-12-12 15:20:44.0
563Indiramma Flood Flow CanalKarimnagarDistributariesDistributariesComplete2019-05-03 11:26:25.0
564J. Chokka Rao LISWarangalDistributariesDistributariesOnGoing2019-05-03 11:26:09.0
565Indiramma Flood Flow CanalKarimnagarDistributariesDistributariesComplete2019-05-03 11:26:28.0
566MusuramilliEast GodavariMainCanalMaincanalComplete2018-12-05 13:00:16.0
567PalemvaguKhammamDistributariesDistributariesOnGoing2019-05-04 14:29:15.0
568Tadipudi LISAndhra PradeshWest GodavariOtherHeadWorksnullPump House 2019-09-06 12:29:14.0
569Rajiv Bhima LISTelanganaMahbubnagarAny OtherMaincanalnull0.435Km2019-09-24 12:49:42.0
570Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompleteFor testing2019-06-28 14:44:31.0
571Sindh Project Ph - IIMadhya PradeshGwaliorMaincanalMain CanalCompletejorasi tunnel2019-07-30 13:59:07.0
572Tillari (MH)MaharashtraSindhudurgBranch CanalBranch CanalOnGoingthe patch work of 1 km under km 30.0 of banda branch canal, is to be completed by may 20 as per tender condition2019-12-06 12:42:59.0
573Tillari (MH)MaharashtraSindhudurgStructureBranch CanalOnGoing2019-12-06 13:57:00.0
574GundlakammaPrakasamHeadWorksDamComplete2019-05-30 09:27:07.0
575Nandur Madhmeshwar Ph. IINashikHeadWorksDamCompleteBham Dam2019-05-31 10:23:05.0
576Sindh Project Ph - IIMadhya PradeshGwaliorBranch CanalBranch CanalCompleteudaipura branch canal of 14.951 km length2019-07-30 14:02:17.0
577Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-08-05 12:34:09.0
578Gosikhurd (NP)BhandaraMainCanalAnyOther2018-10-11 10:53:42.0
579Gosikhurd (NP)BhandaraMainCanalMaincanalOngoing2018-10-11 11:25:46.0
580Gosikhurd (NP)BhandaraMainCanalMaincanalComplete2018-10-11 12:22:10.0
581Gosikhurd (NP)BhandaraMainCanalMaincanalOngoing2018-10-11 10:42:47.0
582GundlakammaPrakasamMaincanalMain CanalCompleteleft canal2019-05-30 09:00:53.0
583GundlakammaPrakasamHeadWorksDamCompleteRD0.12019-05-30 10:46:27.0
584Aruna ProjectDhuleDistributariesOutletCompleteCADWM Field Channel2019-05-28 11:05:46.0
585Aruna ProjectDhuleDistributariesOutletCompleteFYI, OR 32019-05-28 11:33:13.0
586Aruna ProjectDhuleMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteCADWM works2019-05-28 11:36:51.0
587Aruna ProjectDhuleMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteLBC Command2019-05-28 12:09:44.0
588Nandur Madhmeshwar Ph. IIAurangabadMinors/ Sub-MinorsStructureOnGoing2019-05-30 14:01:03.0
589Nandur Madhmeshwar Ph. IIAurangabadMinors/ Sub-MinorsStructureOnGoing2019-05-30 14:03:08.0
590Nandur Madhmeshwar Ph. IIAurangabadMinors/ Sub-MinorsStructureOnGoing2019-05-30 11:27:24.0
591Nandur Madhmeshwar Ph. IIAurangabadMinors/ Sub-MinorsStructureOnGoing2019-05-30 11:27:24.0
592Nandur Madhmeshwar Ph. IIAurangabadMinors/ Sub-MinorsOutletOnGoing2019-05-30 11:35:00.0
593Nandur Madhmeshwar Ph. IIAurangabadMinors/ Sub-MinorsOutletOnGoing2019-05-30 12:09:58.0
594Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompleteworkshop2019-06-28 14:45:12.0
595Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingpimpalgaon minor2019-08-05 16:36:10.0
596Lower WardhaMaharashtraYavatmalBarrageHeadWorksOnGoing2019-08-06 13:47:15.0
597Lower WardhaMaharashtraYavatmalOtherHeadWorksComplete2019-08-07 14:42:15.0
598Rajiv Bhima LISTelanganaMahbubnagarAny OtherMaincanalnull0.435Km2019-09-24 12:50:19.0
599Arjun ShayakUttar PradeshMahobaDamHeadWorksCompleteFilled upto FRL 5782019-11-26 09:53:33.0
600LucknowDamCompletetest app by dipak kobiya2019-09-17 15:11:38.0
601Bhima LISKarnatakaBijapurBarrageHeadWorksComplete2019-12-24 11:25:18.0
602Bhima LISKarnatakaGulbargaOtherHeadWorksComplete2019-12-24 11:57:54.0
603Bhima LISKarnatakaGulbargaOtherHeadWorksComplete109 cusec, 2 Pump working and 1 stand by2019-12-24 12:32:55.0
604Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-08-05 12:34:37.0
605Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteNarayanpur2019-08-05 16:56:25.0
606Lower PanzaraDhuleMaincanalMain CanalCompleteRBMC2019-05-30 11:16:25.0
607Lower PanzaraDhuleMaincanalAny Other2019-05-30 11:16:26.0
608Lower PanzaraDhuleMaincanalOutletCompleteDy 6 on RBMC2019-05-30 11:16:26.0
609Lower WardhaMaharashtraYavatmalBarrageHeadWorksOnGoing2019-08-06 13:49:36.0
610KaranjaKarnatakaBidarStructureMain CanalOnGoingwork in progress 2019-12-23 12:05:46.0
611Peddavagu @ NeelwaiTelanganaAdilabadMain CanalMain CanalYet To Be Completedforest department land problem2019-11-22 13:01:34.0
612Tadipudi LISAndhra PradeshWest GodavariOtherHeadWorksnullPump House 2019-09-06 12:30:49.0
613Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompleteworkshop2019-06-28 14:45:13.0
614Sindh Project Ph - IIMadhya PradeshGwaliorDistributariesDistributariesComplete17.21 km distributary from udaipura branch canal2019-07-30 14:36:26.0
615Tillari (MH)MaharashtraSindhudurgBranch CanalBranch CanalYet To Be CompletedPDN location of banda branch canal from 44.00 to 57.00 km,. Agency is final plot marking work by agency is in progress 2019-12-06 14:18:37.0
616Tillari (MH)MaharashtraNorth GoaBranch CanalStructureYet To Be Completed2019-12-09 12:54:52.0
617Lower WardhaMaharashtraYavatmalOtherHeadWorksComplete2019-08-07 14:43:13.0
618Upper PengangaMaharashtraNandedBranch CanalBranch CanalOnGoingwork is in progress, Crossing SH 44, Dharmabad2019-10-14 15:26:48.0
619Rajiv Bhima LISTelanganaMahbubnagarOtherHeadWorksnullBeema lift 2 stage 1 at Thirumalayapu2019-09-24 17:04:40.0
620Upper PengangaMaharashtraNandedBranch CanalBranch CanalCompleteDOL 1,FC 4, Dharmabad Branch Canal CADWM WORKS,2019-10-15 10:03:43.0
621Gosikhurd (NP)MaharashtraBhandaraDamHeadWorksComplete2019-10-10 15:05:29.0
622GundlakammaAndhra PradeshPrakasamDamHeadWorksComplete2019-11-18 11:07:44.0
623Arjun ShayakUttar PradeshMahobaDamHeadWorksCompleteWater stored upto FRL 5782019-11-26 09:55:11.0
624ChampamatiChirangBranch CanalBranch CanalCompleteLeft Branch Canal2019-05-11 12:32:46.0
625Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletesonegaon2019-08-05 12:41:11.0
626Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteNarayanpur2019-08-05 16:56:57.0
627Lower WardhaMaharashtraWardhaBarrageHeadWorksOnGoing2019-08-06 14:02:24.0
628Lower WardhaMaharashtraYavatmalOtherHeadWorksCompletewater tank, samaj mandir2019-08-07 14:47:48.0
629Peddavagu @ NeelwaiTelanganaAdilabadMain CanalMain CanalCompleteRd 4.5km2019-11-22 13:02:47.0
630Tadipudi LISAndhra PradeshWest GodavariOtherHeadWorksnullPump House cum intake channel2019-09-06 12:33:28.0
631Rajiv Bhima LISTelanganaMahbubnagarAny OtherMaincanalnull0.45km2019-09-24 12:54:23.0
632Sardar SarovarGujaratGandhinagarMaincanalMain CanalCompleteFor Offline testing2019-06-28 14:47:05.0
633Saryu Nahar PariyojanaUttar PradeshBalrampurMain CanalStructureOnGoingRapti Main canal2019-08-07 16:13:19.0
634Saryu Nahar PariyojanaUttar PradeshSiddharthnagarMain CanalStructureOnGoingRapti main canal2019-08-07 17:57:59.0
635SubernarekhaOdishaMayurbhanjMinors/ Sub-MinorsStructureCompleteescape channel outfalls to a local MIP tank( phulajharitank)2019-07-30 14:46:46.0
636Tillari (MH)MaharashtraSindhudurgOutletMinors/ Sub-MinorsComplete2019-12-06 16:19:59.0
637Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoing2019-08-08 18:10:59.0
638Lower PedhiMaharashtraAmravatiDamHeadWorksComplete2019-08-09 13:13:14.0
639Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoing2019-08-09 14:54:38.0
640Lower PedhiMaharashtraAmravatiOtherHeadWorksOnGoing2019-08-09 15:09:11.0
641Dolaithabi BarrageManipurImphal EastMaincanalMain CanalCompletewater transmission system2019-08-27 11:16:10.0
642Rajiv Bhima LISTelanganaMahbubnagarOtherHeadWorksnullBeema lift 2 stage 1 at Thirumalayapu2019-09-24 17:05:25.0
643Lower PedhiMaharashtraAmravatiDamHeadWorksComplete2019-08-09 13:14:33.0
644Gosikhurd (NP)MaharashtraChandrapurBranch CanalBranch CanalOnGoingincomplete2019-10-09 15:15:43.0
645Gosikhurd (NP)MaharashtraBhandaraDamHeadWorksComplete2019-10-10 15:07:26.0
646GundlakammaAndhra PradeshPrakasamDamHeadWorksCompleteGates2019-11-18 11:08:42.0
647Sardar SarovarGujaratGandhinagarMain CanalMaincanalnull228.6402019-06-28 14:47:12.0
648Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletesonegaon2019-08-05 12:42:01.0
649Lower WardhaMaharashtraWardhaOutletMinors/ Sub-MinorsComplete2019-08-05 17:03:52.0
650BemblaMaharashtraYavatmalDamHeadWorksCompletegram panchyat karyalay2019-08-07 15:42:11.0
651Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoingdownstream2019-08-08 18:14:52.0
652Lower PedhiMaharashtraAmravatiDamHeadWorksComplete2019-08-09 13:13:52.0
653Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoing2019-08-09 14:55:16.0
654Lower PedhiMaharashtraAmravatiOtherHeadWorksOnGoing2019-08-09 15:09:41.0
655ChampamatiKokrajharBranch CanalBranch CanalCompleteSRBC2019-05-11 13:17:45.0
656Dolaithabi BarrageManipurSenapatiDistributariesDistributariesComplete2019-08-26 11:19:52.0
657Tadipudi LISAndhra PradeshWest GodavariMaincanalMain CanalCompleteSublift 32019-09-06 14:35:28.0
658Rajiv Bhima LISTelanganaMahbubnagarAny OtherMaincanalnullsuper passage RD 2.2km2019-09-24 13:15:42.0
659SubernarekhaOdishaMayurbhanjMaincanalMain CanalComplete2019-07-30 14:46:53.0
660ThoubalManipurImphal EastMain CanalMaincanalComplete2019-08-27 15:03:06.0
661Rajiv Bhima LISTelanganaMahbubnagarDamHeadWorksOnGoing2019-09-24 14:20:37.0
662ThoubalManipurImphal EastMain CanalMaincanalComplete2019-08-27 15:06:30.0
663GundlakammaAndhra PradeshPrakasamDamHeadWorksCompleteIntake Well for Drinking Water2019-11-18 11:10:55.0
664ThoubalManipurImphal EastDistributariesDistributariesComplete2019-08-27 15:08:55.0
665Tillari (MH)MaharashtraNorth GoaOutletBranch CanalYet To Be CompletedNOC FROM NHAI IS PENDING PENDING2019-12-09 12:57:18.0
666Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletesonegaon2019-08-05 12:43:15.0
667BemblaMaharashtraYavatmalDamHeadWorksCompletewater tank2019-08-07 15:42:47.0
668Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoingdownstream2019-08-08 18:16:05.0
669Lower PedhiMaharashtraAmravatiOtherHeadWorksOnGoing2019-08-09 15:10:26.0
670BemblaMaharashtraYavatmalMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteoutlet2019-08-07 18:22:29.0
671Dolaithabi BarrageManipurSenapatiDistributariesDistributariesComplete2019-08-26 11:20:03.0
672Dolaithabi BarrageManipurImphal EastBranch CanalBranch CanalComplete2019-08-26 11:54:18.0
673Gosikhurd (NP)MaharashtraChandrapurStructureBranch CanalOnGoing2019-10-09 16:52:04.0
674Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletekhamgaon2019-08-05 17:24:54.0
675PalemvaguTelanganaKhammamDistributariesDistributariesOnGoing2019-11-16 12:42:23.0
676Tadipudi LISAndhra PradeshWest GodavariMaincanalStructureCompleteregulator to sublift 32019-09-06 14:35:31.0
677Rajiv Bhima LISTelanganaMahbubnagarMain CanalMaincanalCompletecross regulator2019-09-24 17:17:58.0
678Sardar SarovarGujaratGandhinagarMaincanalMain CanalOnGoing2019-06-28 14:47:58.0
679Dolaithabi BarrageManipurImphal EastMaincanalMain CanalComplete2019-08-27 11:16:22.0
680ThoubalManipurImphal EastMaincanalMain CanalCompletetunnel 2 water transmission system2019-08-27 11:17:43.0
681Rajiv Bhima LISTelanganaMahbubnagarDamHeadWorksOnGoing2019-09-24 17:36:12.0
682GundlakammaAndhra PradeshPrakasamDamHeadWorksCompleteDown stream side if reservoir2019-11-18 11:13:20.0
683YerracalvaAndhra PradeshWest GodavariMain CanalMaincanalCompleteHydraulic Particulars2019-11-29 11:43:45.0
684ThoubalManipurSenapatiMaincanalMain CanalCompletewater transmission system2019-08-27 11:17:48.0
685Peddavagu (Sch.Jaganathpoor)TelanganaAdilabadBarrageHeadWorksOnGoing2019-12-16 12:51:41.0
686Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-08-05 12:46:03.0
687Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoingdownstream2019-08-08 18:16:49.0
688Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoing2019-08-09 13:24:10.0
689Lower PedhiMaharashtraAmravatiOtherHeadWorksOnGoing2019-08-09 15:11:03.0
690Dolaithabi BarrageManipurImphal EastBarrageHeadWorksComplete2019-08-26 12:47:04.0
691Tadipudi LISAndhra PradeshWest GodavariDistributariesDistributariesYet To Be CompletedLand Aquistion2019-09-06 14:45:23.0
692Gosikhurd (NP)MaharashtraChandrapurStructureBranch CanalOnGoing2019-10-09 16:54:27.0
693Lower WardhaMaharashtraWardhaDistributariesDistributariesCompleteKhamgaon2019-08-05 17:27:15.0
694BemblaMaharashtraYavatmalStructureMinors/ Sub-MinorsCompleteoutlet2019-08-07 18:31:53.0
695Tadipudi LISAndhra PradeshWest GodavariMain CanalMaincanalCompleteMain canal Road crossing 2019-09-06 14:54:36.0
696Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompletefor testing2019-06-28 14:48:37.0
697ThoubalManipurThoubalDistributariesDistributariesCompletefield channel to crops2019-08-27 16:32:29.0
698Tillari (MH)MaharashtraNorth GoaOutletBranch CanalOnGoing2019-12-09 15:31:56.0
699Tillari (MH)MaharashtraNorth GoaStructureMain CanalOnGoing2019-12-09 16:27:46.0
700Rajiv Bhima LISTelanganaMahbubnagarDamHeadWorksOnGoing2019-09-24 17:37:13.0
701GundlakammaAndhra PradeshPrakasamDamHeadWorksCompleteUpstream of reservoir2019-11-18 11:14:56.0
702Peddavagu (Sch.Jaganathpoor)TelanganaAdilabadBarrageHeadWorksOnGoing2019-12-16 12:52:25.0
703Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-08-05 12:47:08.0
704Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoingdownstream2019-08-08 18:25:51.0
705Lower PedhiMaharashtraAmravatiHeadWorksDamComplete2019-08-09 13:59:04.0
706Dolaithabi BarrageManipurImphal EastBarrageHeadWorksComplete2019-08-26 12:51:44.0
707ThoubalManipurSenapatiHeadWorksDamComplete2019-08-27 11:22:47.0
708Rajiv Bhima LISTelanganaMahbubnagarOtherHeadWorksnullunder progress2019-09-24 17:50:42.0
709BemblaMaharashtraYavatmalOutletMinors/ Sub-MinorsCompleteoutlet2019-08-07 18:35:20.0
710Gosikhurd (NP)MaharashtraChandrapurBranch CanalBranch CanalOnGoingOngoing aqueduct work2019-10-09 17:23:34.0
711GundlakammaAndhra PradeshPrakasamMain CanalMaincanalnullHead Regulator 2019-11-18 11:32:17.0
712Aruna ProjectDhuleMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteCADWM works2019-05-28 11:43:14.0
713Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletekhamgaon minor2019-08-05 17:36:42.0
714Sardar SarovarGujaratGandhinagarMaincanalMain CanalCompletefor offline testing2019-06-28 14:50:19.0
715ThoubalManipurThoubalDistributariesDistributariesCompletefield channel2019-08-27 16:51:32.0
716Tillari (MH)MaharashtraNorth GoaOutletBranch CanalOnGoing2019-12-09 15:36:35.0
717Bhima LISKarnatakaGulbargaStructureMain CanalCompleteOfftake point of D1 & D2 in Allagi Main Canal2019-12-24 13:10:05.0
718Tillari (MH)MaharashtraNorth GoaMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingthivim minor offtake from 23.3km of LBMC. it covers around 396Ha2019-12-09 16:40:43.0
719Aruna ProjectMaharashtraSindhudurgMain CanalStructureOnGoingyet to be completed by March 202019-12-04 20:04:50.0
720SRSP St. IITelanganaWarangalDistributariesDistributariesComplete3R-21R-DBM602019-12-05 11:38:47.0
721Peddavagu (Sch.Jaganathpoor)TelanganaAdilabadBarrageHeadWorksOnGoing2019-12-16 13:00:49.0
722Bhima LISKarnatakaBijapurBarrageHeadWorksComplete2019-12-24 11:26:30.0
723Bhima LISKarnatakaGulbargaOtherHeadWorksComplete2019-12-24 12:00:07.0
724Indiramma Flood Flow CanalTelanganaKarimnagarHeadWorksOtherComplete2019-12-24 13:07:12.0
725Lower PedhiMaharashtraAmravatiDamHeadWorksOnGoingdownstream2019-08-08 18:26:20.0
726Lower PedhiMaharashtraAmravatiHeadWorksDamComplete2019-08-09 13:59:42.0
727Dolaithabi BarrageManipurImphal EastDistributariesDistributariesComplete2019-08-26 13:00:26.0
728Int. Anandapur Barrage Ph. IOdishaKendujharHeadWorksBarrageComplete2019-08-27 12:26:44.0
729Rajiv Bhima LISTelanganaMahbubnagarOtherHeadWorksnullunder progress2019-09-24 17:51:34.0
730ThoubalManipurThoubalDistributariesDistributariesCompletefield channel by CAD2019-08-27 16:51:49.0
731GundlakammaAndhra PradeshPrakasamAny OtherMaincanalnullAyacut-Paddy2019-11-18 11:36:59.0
732Indiramma Flood Flow CanalTelanganaKarimnagarMain CanalMain CanalCompleteIffc infall regulator2019-12-24 12:34:37.0
733SRSP St. IITelanganaKhammamDistributariesDistributariesCompletepackage 542019-12-05 10:17:09.0
734KaranjaKarnatakaBidarMain CanalMain CanalCompleteAtiwal lift canal2019-12-23 13:14:30.0
735KaranjaKarnatakaBidarOutletMain CanalComplete2019-12-23 14:04:05.0
736Aruna ProjectDhuleMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteLBC2019-05-28 11:46:52.0
737Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingNachangaon2019-08-05 13:28:49.0
738Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsOutletCompletekhamgaon OL 32019-08-05 17:42:35.0
739Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalCompleteLining is completed,in patches2019-12-26 12:24:49.0
740KaranjaKarnatakaBidarMain CanalMain CanalYet To Be CompletedLA issues2019-12-23 10:30:39.0
741Bhima LISKarnatakaBijapurBarrageHeadWorksCompleteReservoir 2019-12-24 11:27:26.0
742Indiramma Flood Flow CanalTelanganaKarimnagarMain CanalMain CanalOnGoingleft main canal2019-12-24 13:16:51.0
743PalemvaguKhammamDistributariesDistributariesOnGoing2019-05-04 14:45:41.0
744Dolaithabi BarrageManipurImphal EastDistributariesDistributariesComplete2019-08-26 13:01:12.0
745Sangola Branch CanalMaharashtraSolapurMain CanalMain CanalYet To Be CompletedNRBC TOTAL LENGTH 55.9 KM nearly 50.0 km is completed,5 km is pending,up to be completed by May 202019-12-26 12:52:58.0
746GundlakammaAndhra PradeshPrakasamStructureMaincanalComplete2019-11-18 11:41:03.0
747Indiramma Flood Flow CanalTelanganaKarimnagarMain CanalStructureComplete2019-12-24 12:45:15.0
748SRSP St. IITelanganaWarangalDistributariesDistributariesOnGoing4R-3R-21R-DBM602019-12-05 11:49:47.0
749Int. Anandapur Barrage Ph. IOdishaKendujharHeadWorksBarrageCompleteBarrage work completed2019-08-27 12:26:45.0
750SRSP St. IITelanganaKhammamDistributariesDistributariesComplete2019-12-05 10:18:59.0
751KaranjaKarnatakaBidarOtherHeadWorksComplete2019-12-23 11:14:06.0
752KaranjaKarnatakaBidarStructureMain CanalCompleteJack well2019-12-23 13:15:21.0
753Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingNachangaon2019-08-05 13:29:19.0
754Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletekhamgaon Fall2019-08-05 17:43:48.0
755PalemvaguKhammamDistributariesDistributariesOnGoing2019-05-04 14:45:34.0
756Peddavagu (Sch.Jaganathpoor)TelanganaAdilabadMain CanalMain CanalComplete2019-12-16 13:37:06.0
757Saryu Nahar PariyojanaUttar PradeshBastiBranch CanalBranch CanalCompleteBasti Branch canal2019-08-08 08:58:33.0
758ThoubalManipurThoubalDistributariesDistributariesCompletefield channel by CADWM2019-08-27 16:54:58.0
759KaranjaKarnatakaBidarMain CanalMain CanalYet To Be CompletedLA iusses2019-12-23 10:32:00.0
760Bhima LISKarnatakaGulbargaOtherHeadWorksComplete2019-12-24 11:46:15.0
761Indiramma Flood Flow CanalTelanganaKarimnagarHeadWorksOtherComplete2019-12-24 13:12:13.0
762Sangola Branch CanalMaharashtraSolapurDistributariesStructureCompleteLining in patch is pending2019-12-26 14:53:38.0
763Madhya Ganga Canal Ph-IIUttar PradeshGulbargaMain CanalOutletCompleteDPO 1 of Allagi B Main Canal2019-12-24 13:31:31.0
764Dolaithabi BarrageManipurImphal EastDistributariesDistributariesCompletefield channel.2019-08-26 13:26:22.0
765GundlakammaAndhra PradeshPrakasamStructureBranch CanalCompleteWorking Condition2019-11-18 11:54:45.0
766Indiramma Flood Flow CanalTelanganaKarimnagarMain CanalStructureComplete2019-12-24 12:47:09.0
767SRSP St. IITelanganaWarangalDistributariesDistributariesOnGoing4R-3R-21R-DBM602019-12-05 11:53:10.0
768Int. Anandapur Barrage Ph. IOdishaKendujharStructureMaincanalComplete2019-08-27 12:29:25.0
769SRSP St. IITelanganaWarangalDistributariesDistributariesComplete2019-12-05 11:24:56.0
770KaranjaKarnatakaBidarOtherHeadWorksComplete2019-12-23 11:14:58.0
771KaranjaKarnatakaBidarMain CanalMain CanalCompleteDy 12019-12-23 13:16:24.0
772Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingNachangaon2019-08-05 13:29:45.0
773Lower WardhaMaharashtraWardhaMinors/ Sub-MinorsMinors/ Sub-MinorsCompletekhangaon Fall2019-08-05 18:01:15.0
774Peddavagu (Sch.Jaganathpoor)TelanganaAdilabadMain CanalMain CanalCompleteRCC guide Wall2019-12-16 13:38:32.0
775Peddavagu (Sch.Jaganathpoor)TelanganaAdilabadMain CanalMain CanalComplete2019-12-16 14:41:00.0
776Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalComplete2019-12-26 16:13:24.0
777Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalYet To Be CompletedLining2019-12-26 16:20:48.0
778ThoubalManipurThoubalMain CanalMaincanalOnGoing2019-08-27 17:22:41.0
779KaranjaKarnatakaBidarMain CanalMain CanalOnGoing25 Guntas Land pending, KLI2019-12-23 10:35:18.0
780Bhima LISKarnatakaGulbargaOtherHeadWorksCompleteBalundagi main canal2019-12-24 11:48:20.0
781Bhima LISKarnatakaGulbargaStructureMain CanalCompleteState Highway Xing2019-12-24 13:51:41.0
782Sangola Branch CanalMaharashtraSolapurDistributariesDistributariesOnGoingwork.is ongoing yet to be completed by feb 20192019-12-26 15:21:19.0
783Pushkara LISAndhra PradeshEast GodavariOtherHeadWorksComplete2019-12-27 10:22:44.0
784Pushkara LISAndhra PradeshEast GodavariOtherHeadWorksComplete2019-12-27 10:23:59.0
785Indiramma Flood Flow CanalTelanganaKarimnagarHeadWorksOtherComplete2019-12-24 13:01:28.0
786KaranjaKarnatakaBidarMain CanalMain CanalCompleteKLI2019-12-23 11:16:13.0
787Krishna Koyna LISMaharashtraSangliMain CanalMain CanalOnGoingAlmost linings is done, in some patches some portion of lining is pending2019-12-27 11:09:07.0
788Krishna Koyna LISMaharashtraSangliMain CanalMain CanalCompletework completed 2019-12-27 11:14:38.0
789Pushkara LISAndhra PradeshEast GodavariMain CanalMain CanalCompleteDelivery cistern2019-12-27 11:36:52.0
790Pushkara LISAndhra PradeshEast GodavariMain CanalMain CanalCompleteHead regulator2019-12-27 11:38:19.0
791Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalComplete2019-12-26 16:12:47.0
792Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalComplete2019-12-26 16:17:13.0
793Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalYet To Be Completedvegitations on canal2019-12-26 16:21:53.0
794Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalOnGoing2019-12-26 16:25:15.0
795Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalCompleteopen canal2019-12-26 16:37:36.0
796Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalCompleteopen canal2019-12-26 16:38:38.0
797KhadakpurnaMaharashtraBuldanaDamHeadWorksComplete100% storage2020-01-03 10:11:38.0
798KhadakpurnaMaharashtraBuldanaDamHeadWorksCompleteNon cleareance of bushes , trees on d/s & u/ s side of earthen portion .2020-01-03 10:21:25.0
799J. Chokka Rao LISTelanganaWarangalMain CanalAny OtherOnGoinglining work is in progress2020-01-21 16:50:18.0
800J. Chokka Rao LISTelanganaWarangalOtherHeadWorksOnGoing2020-01-21 16:51:25.0
801J. Chokka Rao LISTelanganaWarangalOtherHeadWorksOnGoing2020-01-21 17:45:46.0
802Krishna Koyna LISMaharashtraSangliMain CanalMain CanalCompleteprevious bottleneck of LA is tackled now2019-12-27 12:16:03.0
803Krishna Koyna LISMaharashtraSangliOutletMain CanalComplete2019-12-27 13:23:51.0
804Pushkara LISAndhra PradeshEast GodavariMain CanalMain CanalCompleteCross Regulator2019-12-27 12:05:27.0
805Pushkara LISAndhra PradeshEast GodavariDistributariesDistributariesCompleteKeshavaram distributary2019-12-27 12:06:51.0
806Pushkara LISAndhra PradeshEast GodavariStructureMain CanalComplete2019-12-27 12:23:53.0
807Pushkara LISAndhra PradeshEast GodavariMain CanalStructureComplete2019-12-27 12:53:56.0
808Pushkara LISAndhra PradeshEast GodavariStructureMain CanalComplete2019-12-27 12:59:39.0
809Pushkara LISAndhra PradeshEast GodavariStructureMain CanalComplete2019-12-27 13:01:58.0
810Pushkara LISAndhra PradeshEast GodavariStructureMain CanalCompleteMURARI HR ON PUSHKAR CANAL2019-12-27 13:23:47.0
811Pushkara LISAndhra PradeshEast GodavariStructureMain CanalComplete2019-12-27 13:25:14.0
812J. Chokka Rao LISTelanganaWarangalOtherHeadWorksComplete2020-01-22 15:18:51.0
813Lower DudhanaMaharashtraParbhaniMain CanalMain CanalCompletebottleneck was cleared2020-02-13 14:52:56.0
814ThotapallyAndhra PradeshVizianagaramBarrageHeadWorksOnGoingmaintenance of gantry girder2020-02-18 11:16:34.0
815ThotapallyAndhra PradeshVizianagaramBarrageHeadWorksCompletemaintenance of gantry girder2020-02-18 11:17:38.0
816ThotapallyAndhra PradeshVizianagaramOtherHeadWorksOnGoing2020-02-18 11:20:11.0
817ThotapallyAndhra PradeshVizianagaramOtherHeadWorksOnGoing2020-02-18 11:24:39.0
818ThotapallyAndhra PradeshVizianagaramOtherHeadWorksYet To Be CompletedProtection works required2020-02-18 11:26:55.0
819Lower DudhanaMaharashtraParbhaniMain CanalMain CanalCompleteRBC main canal, bottleneck was cleared2020-02-13 10:01:45.0
820Lower DudhanaMaharashtraParbhaniMain CanalMain CanalCompleteprevious bottleneck was cleared2020-02-13 14:42:07.0
821ThotapallyAndhra PradeshVizianagaramHeadWorksBarrageCompleteMaintenance work in progress2020-02-18 11:52:35.0
822ThotapallyAndhra PradeshVizianagaramMain CanalStructureComplete2020-02-18 13:37:19.0
823ThotapallyAndhra PradeshVizianagaramMain CanalStructureCompleteCross Regulator cum escape2020-02-18 13:46:19.0
824ThotapallyAndhra PradeshVizianagaramMain CanalStructureCompleteAqueduct2020-02-18 13:52:20.0
825ThotapallyAndhra PradeshVizianagaramMain CanalStructureCompleteBox type Aqueduct2020-02-18 14:30:06.0
826Morna (Gureghar)MaharashtraSataraOtherHeadWorksCompleteGP building aaddev2020-02-26 12:22:54.0
827Morna (Gureghar)MaharashtraSataraOtherHeadWorksCompleteGP building aaddev2020-02-26 12:24:04.0
828Morna (Gureghar)MaharashtraSataraOtherHeadWorksComplete aaddev2020-02-26 12:25:51.0
829Morna (Gureghar)MaharashtraSataraOtherHeadWorksCompleteanimal water tank2020-02-26 12:26:42.0
830Morna (Gureghar)MaharashtraSataraOtherHeadWorksCompleteGP building2020-02-26 13:08:21.0
831Morna (Gureghar)MaharashtraSataraOtherHeadWorksCompleteGP building2020-02-26 13:09:05.0
832Morna (Gureghar)MaharashtraSataraOtherHeadWorksComplete2020-02-26 13:12:14.0
833Morna (Gureghar)MaharashtraSataraOtherHeadWorksCompleteRR village2020-02-26 13:14:04.0
834DhansiriAssamUdalguriBranch CanalAny Other2020-03-13 13:16:50.0
835Morna (Gureghar)MaharashtraSataraStructureMain CanalComplete2020-02-26 12:50:30.0
836Morna (Gureghar)MaharashtraSataraStructureMain CanalComplete2020-02-26 12:51:20.0
837Morna (Gureghar)MaharashtraSataraMain CanalMain CanalCompleteLBC Canal2020-02-26 12:52:20.0
838ThotapallyAndhra PradeshVizianagaramMain CanalStructureCompletecross Regulator- gates not installed2020-02-18 14:32:19.0
839ThotapallyAndhra PradeshSrikakulamMain CanalStructureComplete2020-02-18 14:57:19.0
840ThotapallyAndhra PradeshSrikakulamBranch CanalBranch CanalCompleterajam branch canal2020-02-18 15:02:19.0
841ThotapallyAndhra PradeshVizianagaramMain CanalStructureComplete2020-02-18 15:42:29.0
842ThotapallyAndhra PradeshVizianagaramBranch CanalBranch CanalCompletesrikakulam branch canal2020-02-18 15:50:51.0
843ThotapallyAndhra PradeshVizianagaramMain CanalMain CanalCompleteSrikakulam branch canal gate2020-02-18 15:51:44.0
844Morna (Gureghar)MaharashtraSataraStructureMain CanalComplete2020-02-26 14:01:57.0
845WangMaharashtraSataraHeadWorksDamOnGoing2020-02-27 11:00:00.0
846WangMaharashtraSataraHeadWorksDamComplete2020-02-27 11:09:49.0
847WangMaharashtraSataraHeadWorksDamOnGoing2020-02-27 11:12:41.0
848WangMaharashtraSataraHeadWorksOtherOnGoingRR village2020-02-27 11:13:32.0
849WangMaharashtraSataraHeadWorksOtherOnGoingmendha village2020-02-27 11:14:45.0
850WangMaharashtraSataraHeadWorksOtherComplete2020-02-27 11:38:24.0
851WangMaharashtraSataraHeadWorksOtherCompleteUmarkanchn RR village2020-02-27 11:57:25.0
852WangMaharashtraSataraHeadWorksDamOnGoing2020-02-27 11:59:49.0
853WangMaharashtraSataraHeadWorksOtherComplete2020-02-27 12:00:46.0
854WangMaharashtraSataraHeadWorksDamOnGoing2020-02-27 12:47:10.0
855TaraliMaharashtraSataraOtherHeadWorksOnGoing2020-02-28 10:03:35.0
856TaraliMaharashtraSataraOtherHeadWorksOnGoing2020-02-28 10:05:12.0
857TaraliMaharashtraSataraHeadWorksDamComplete2020-02-28 11:58:37.0
858TaraliMaharashtraSataraHeadWorksOtherOnGoing2020-02-28 11:58:39.0
859TaraliMaharashtraSataraHeadWorksDamOnGoing2020-02-28 11:58:40.0
860TaraliMaharashtraSataraMain CanalMain CanalCompletekonjurde LIS2020-02-28 12:14:44.0
861TaraliMaharashtraSataraMain CanalMain CanalOnGoing2020-02-28 12:15:44.0
862TaraliMaharashtraSataraMain CanalMain CanalOnGoing2020-02-28 12:24:09.0
863TaraliMaharashtraSataraMain CanalMain CanalOnGoing2020-02-28 12:34:18.0
864TaraliMaharashtraSataraMain CanalMain CanalOnGoing2020-02-28 12:41:16.0
865TaraliMaharashtraSataraMain CanalStructureOnGoing2020-02-28 13:06:17.0
866TaraliMaharashtraSataraMain CanalMain CanalOnGoing2020-02-28 13:07:20.0
867nullPannaDistributariesOutletComplete2018-10-04 14:06:28.0
868TaraliMaharashtraSataraMain CanalStructureOnGoing2020-02-28 15:11:44.0
869TaraliMaharashtraSataraMain CanalAny OtherOnGoing2020-02-28 16:57:06.0
870Upper TungaKarnatakaHaveriMain CanalMain CanalOnGoingThe offset of 50m length has to be constructed by railway department. The work is pending from Railway Department due to corona and the payment has been released from client to railway department. 2020-06-25 11:49:09.0
871Upper TungaKarnatakaHaveriMain CanalMain CanalYet To Be CompletedDue to land acquisition the work is pending 2020-06-25 13:10:19.0
872Sri KomarambheemTelanganaAdilabadDamHeadWorksComplete2020-06-10 13:48:58.0
873Sri KomarambheemTelanganaAdilabadDamHeadWorksComplete2020-06-10 13:52:45.0
874Sri KomarambheemTelanganaAdilabadDamHeadWorksComplete2020-06-10 13:53:32.0
875Upper TungaKarnatakaHaveriDistributariesDistributariesYet To Be CompletedOff take point of DY- 6 is pending due to land acquisition2020-06-25 13:17:06.0
876Upper TungaKarnatakaHaveriMain CanalMain CanalOnGoingwork under progress2020-06-25 12:35:19.0
877Sri KomarambheemTelanganaAdilabadOtherHeadWorksComplete2020-06-10 14:08:43.0
878Sri KomarambheemTelanganaAdilabadMain CanalMain CanalComplete2020-06-10 14:09:56.0
879TaraliMaharashtraSataraMain CanalMain CanalComplete2020-02-28 17:07:07.0
880TaraliMaharashtraSataraMain CanalStructureOnGoing2020-03-03 20:55:33.0
881Upper TungaKarnatakaHaveriMain CanalMain CanalOnGoing2020-06-25 16:04:02.0
882Arjun ShayakMahobaMainCanalMaincanalOngoing2018-10-30 14:31:55.0
883Arjun ShayakMahobaMainCanalAnyOther2018-10-30 10:41:43.0
884Arjun ShayakMahobaMainCanalAnyOther2018-10-30 11:42:58.0
885Arjun ShayakUttar PradeshMahobaMain CanalMain CanalCompleteHead Regulator of Kabrai Feeder Channel2019-11-26 09:48:38.0
886Arjun ShayakUttar PradeshMahobaStructureMain CanalCompleteOld Main Canal, IP restored 2019-11-26 09:51:22.0
887Arjun ShayakUttar PradeshMahobaStructureMain CanalOnGoing2019-11-26 10:00:03.0
888Arjun ShayakUttar PradeshMahobaMain CanalMain CanalCompleteSoil Stabilization req.2019-11-26 10:07:08.0
889Arjun ShayakUttar PradeshMahobaStructureMain CanalOnGoingVRB for Village Ghutwai2019-11-26 10:22:50.0
890Arjun ShayakUttar PradeshMahobaStructureMain CanalOnGoingVRB for Jarauli2019-11-26 10:41:15.0
891Arjun ShayakUttar PradeshMahobaStructureMain CanalOnGoingDRB for Bumneta2019-11-26 10:58:20.0
892Arjun ShayakUttar PradeshMahobaStructureMain CanalOnGoingHR of Chandrawal Dam Feeder Channel2019-11-26 11:35:31.0
893Arjun ShayakUttar PradeshMahobaStructureMain CanalCompleteEscape Channel of Chandrawal Dam Feeder Channel, Gates are installed2019-11-26 11:39:26.0
894Arjun ShayakUttar PradeshMahobaStructureMain CanalOnGoingChandrawal River Crossing of Kabrai Feeder Channel2019-11-26 11:46:24.0
895Arjun ShayakUttar PradeshMahobaMain CanalMain CanalOnGoingMining Permission granted and work is in progress with full swing2019-11-26 12:00:40.0
896Arjun ShayakUttar PradeshMahobaMain CanalMain CanalOnGoingReach 21.5 km to 22.0 km of Kabrai Feeder Channel2019-11-26 12:02:54.0
897Arjun ShayakUttar PradeshMahobaStructureMain CanalOnGoingDRB at 3 km RD of Kabrai Main Canal2019-11-26 15:37:16.0
898Arjun ShayakUttar PradeshMahobaMain CanalMain CanalOnGoingHR of Khandeh Disty2019-11-26 16:07:43.0
899Arjuna ProjectMaharashtraRatnagiriMain CanalMain CanalCompleteLBC main canal of total length 16.00km is completed throughoutly.. and one time rotation is supplied in the month of May through the whole strech.. only total length of 87kms of CADWM ON LBC IS IN PROGRESS, 1200M OF LAYING IS DONE. THE WORK IS TO BE COMPLETED BY MARCH20, AS PER TENDER TERMS2019-12-03 23:50:19.0
900Bansagar Unit - IIRewaMinors_Sub_MinorsMaincanalComplete2018-12-15 10:05:12.0
901Bansagar Unit - IISidhiDistributariesOutletComplete2018-12-14 12:41:00.0
902Bargi Diversion Project Ph- I (km. 16 to Km 63)JabalpurMinors_Sub_MinorsStructureOngoing2018-12-17 15:38:48.0
903Bargi Diversion Project Ph- I (km. 16 to Km 63)JabalpurMinors_Sub_MinorsMaincanalComplete2018-12-17 14:43:43.0
904Bargi Diversion Project Ph- I (km. 16 to Km 63)JabalpurDistributariesStructureComplete2018-12-17 11:09:20.0
905Bargi Diversion Project Ph- I (km. 16 to Km 63)JabalpurMainCanalStructureComplete2018-12-17 12:51:52.0
906Bargi Diversion Projrct Ph- IV (Km. 154 to Km. 197)SatnaMainCanalStructureComplete2018-12-18 13:18:46.0
907Bargi Diversion Projrct Ph- III (Km.104 to Km. 154)KatniMainCanalStructureOngoing2018-12-18 11:33:34.0
908Bargi Diversion Projrct Ph- IV (Km. 154 to Km. 197)KatniMainCanalStructureComplete2018-12-18 12:59:42.0
909Bargi Diversion Projrct Ph- IV (Km. 154 to Km. 197)KatniMainCanalMaincanalComplete2018-12-18 13:04:33.0
910nullChhatarpurMainCanalStructureComplete2018-10-04 11:54:56.0
911nullChhatarpurMainCanalStructureComplete2018-10-04 11:54:56.0
912Bariyarpur LBCChhatarpurDistributariesOutletComplete2018-10-04 14:35:41.0
913nullPannaDistributariesOutletComplete2018-10-04 14:06:28.0
914nullChhatarpurMainCanalStructureComplete2018-10-03 15:58:16.0
915BemblaMaharashtraYavatmalMinors/ Sub-MinorsMinors/ Sub-MinorsComplete2019-08-07 18:21:01.0
916Bansagar Unit - IISidhiBranchCanalStructurenull2018-12-14 13:50:10.0
917Singhpur ProjectChhatarpurMinors_Sub_MinorsStructureComplete2018-10-03 16:56:46.0
918Lower WardhaMaharashtraYavatmalHeadWorksOtherCompletepump house filter parts are spread to outside.2019-08-07 12:35:00.0
919ChampamatiChirangMainCanalAnyOther2018-12-07 12:48:30.0
920Bhima LISKarnatakaGulbargaStructureDistributariesCompletedischarge measuring device2019-12-24 13:12:44.0
921ChampamatiChirangBranch CanalBranch CanalComplete2019-05-11 11:46:27.0
922ChampamatiChirangBranch CanalBranch CanalComplete2019-05-11 11:52:03.0
923ChampamatiChirangMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteMIC2019-05-11 11:55:35.0
924ChampamatiChirangMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteMIC2019-05-11 11:59:00.0
925ChampamatiKokrajharBranch CanalBranch CanalCompleteRBC32019-05-11 13:41:44.0
926ChampamatiKokrajharBranch CanalBranch CanalCompleteRBC32019-05-11 13:48:13.0
927DhansiriUdalguriDistributariesMaincanalOngoing2018-12-12 12:53:40.0
928DhansiriUdalguriDistributariesMaincanalOngoing2018-12-17 12:52:55.0
929DhansiriUdalguriDistributariesMaincanalOngoing2018-12-17 13:10:09.0
930DhansiriUdalguriDistributariesMaincanalOngoing2018-12-12 11:31:34.0
931DhansiriUdalguriMainCanalStructureOngoing2018-12-12 15:26:54.0
932Dhom BalkawadiMaharashtraSataraMinors/ Sub-MinorsMinors/ Sub-MinorsCompletetail2019-07-09 12:21:19.0
933Dhom BalkawadiMaharashtraSataraMaincanalStructureOnGoinggate installation balance2019-07-09 13:21:29.0
934Dolaithabi BarrageImphal EastMainCanalAnyOther2018-12-27 16:53:01.0
935Dolaithabi BarrageManipurImphal EastOutletBranch CanalComplete2019-08-26 14:35:44.0
936DurgawatiRohtasMainCanalStructureComplete2018-12-13 12:31:52.0
937DurgawatiRohtasMainCanalStructureComplete2018-12-13 13:43:11.0
938DurgawatiKaimur (Bhabua)MainCanalStructureComplete2018-12-14 12:12:22.0
939DurgawatiRohtasDistributariesOutletComplete2018-12-13 11:43:30.0
940DurgawatiRohtasDistributariesMaincanalComplete2018-12-13 12:34:41.0
941DurgawatiRohtasDistributariesStructureComplete2018-12-13 13:45:33.0
942DurgawatiKaimur (Bhabua)MainCanalStructureComplete2018-12-14 12:15:25.0
943DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 09:39:44.0
944DurgawatiRohtasMinors_Sub_MinorsStructureComplete2018-12-13 14:05:48.0
945DurgawatiRohtasDistributariesMaincanalOngoing2018-12-13 12:04:27.0
946Gosikhurd (NP)BhandaraMainCanalAnyOther2018-10-11 10:40:56.0
947ThoubalThoubalMainCanalAnyOther2018-12-27 12:27:56.0
948Gosikhurd (NP)MaharashtraBhandaraMain CanalMain CanalOnGoing2019-10-10 16:13:02.0
949GadnadiMaharashtraRatnagiriMain CanalMain CanalOnGoingBottleneck is settled2019-12-02 11:23:00.0
950GadnadiMaharashtraRatnagiriMain CanalMain CanalOnGoingbottleneck cleared2019-12-02 13:05:16.0
951Gosikhurd (NP)MaharashtraChandrapurBranch CanalBranch CanalOnGoingGodhijhari Branch Canal2019-10-09 15:10:30.0
952Gosikhurd (NP)BhandaraBranchCanalStructureComplete2018-10-11 14:31:17.0
953Gosikhurd (NP)ChandrapurMainCanalMaincanalOngoing2018-10-17 14:02:05.0
954GundlakammaPrakasamBranchCanalStructureComplete2018-10-22 13:37:50.0
955GundlakammaPrakasamDistributariesDistributariesOnGoing2019-05-30 10:52:46.0
956GundlakammaPrakasamDistributariesDistributariesOnGoing2019-05-30 10:52:46.0
957GundlakammaPrakasamDistributariesDistributariesOnGoing2019-05-30 11:04:12.0
958GundlakammaPrakasamDistributariesDistributariesOnGoing2019-05-30 11:04:12.0
959nullPrakasamDistributariesOutletComplete2018-10-22 14:12:01.0
960J. Chokka Rao LISTelanganaWarangalMain CanalAny OtherOnGoing23.40 phase iii2020-01-22 15:10:03.0
961J. Chokka Rao LISTelanganaWarangalMain CanalAny OtherCompletephase ii2020-01-22 16:08:24.0
962J. Chokka Rao LISTelanganaWarangalMain CanalAny OtherOnGoingin progress2020-01-22 16:43:21.0
963J. Chokka Rao LISWarangalMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoing2019-05-03 12:33:10.0
964J. Chokka Rao LISWarangalMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoing2019-05-03 12:33:48.0
965SRSP St. IITelanganaWarangalDistributariesDistributariesOnGoing2019-12-05 11:57:42.0
966SRSP St. IITelanganaKhammamDistributariesDistributariesCompleteDBM502019-12-05 10:29:29.0
967KaranjaKarnatakaBidarStructureMain CanalOnGoing2019-12-23 13:20:33.0
968KaranjaKarnatakaBidarMain CanalMain CanalCompletenear railway crossing2019-12-23 13:21:44.0
969KaranjaKarnatakaBidarStructureMain CanalOnGoingSyphone 2019-12-23 13:43:04.0
970KaranjaKarnatakaBidarStructureMain CanalOnGoingsyphone 2019-12-23 13:45:05.0
971KeloRaigarhDistributariesMaincanalOngoing2018-12-20 15:37:55.0
972KeloRaigarhHeadworksDamComplete2018-12-21 10:04:22.0
973KeloRaigarhMainCanalMaincanalComplete2018-12-21 10:36:53.0
974KhadakpurnaMaharashtraBuldanaMain CanalMain CanalOnGoingoutof 10km yet 4km is completed and balance work to be upto March 20202020-01-03 10:54:07.0
975KhadakpurnaMaharashtraBuldanaMain CanalMain CanalOnGoingLining work inprogress .Preparation of Surface is ready.2020-01-03 13:20:34.0
976Krishna Koyna LISMaharashtraSangliOutletMain CanalYet To Be CompletedOUTLET IS PROVIDES, VALVE AND CHAMVER ARE ESTABLISHED, CADWM WORKS IS PENDING2019-12-27 11:21:00.0
977Krishna Koyna LISMaharashtraSangliAny OtherMain CanalCompletefarmers are now preparing their draught prone land to the cultivated land, now they are fully take gate farming which is mostly famous for this area2019-12-27 11:31:09.0
978Krishna Koyna LISMaharashtraSangliStructureMain CanalCompletein the last three month this structure is completed, two time rotation is supplied2019-12-27 12:04:05.0
979Krishna Koyna LISMaharashtraSangliDistributariesDistributariesOnGoing2019-12-27 13:02:42.0
980Krishna Koyna LISMaharashtraSangliMinors/ Sub-MinorsMinors/ Sub-MinorsOnGoingCADWM WORKS ARE IN PROGRESS2019-12-27 15:41:48.0
981KudaliMaharashtraSataraMaincanalMain CanalOnGoingfeeder canal2019-06-14 12:47:56.0
982Lower PanzaraDhuleMinors/ Sub-MinorsStructureFC8L2019-05-28 13:58:15.0
983Lower WardhaMaharashtraYavatmalHeadWorksOtherComplete2019-08-07 12:27:27.0
984BemblaMaharashtraYavatmalMinors/ Sub-MinorsMinors/ Sub-MinorsCompleteroad crossing2019-08-07 18:37:04.0
985Madhya Ganga Canal Ph-IIUttar PradeshBijnorStructureMain CanalCompleteonly canal lining work is on progress2019-08-28 18:53:36.0
986Madhya Ganga Canal Ph-IIUttar PradeshJyotiba Phule NagarMain CanalMain CanalCompleteTail end of Main Canal2019-08-29 14:28:02.0
987Madhya Ganga Canal Ph-IIUttar PradeshJyotiba Phule NagarStructureMain CanalCompleteHead Regulator of Chandausi Branch Canal2019-08-29 14:29:45.0
988Madhya Ganga Canal Ph-IIUttar PradeshJyotiba Phule NagarStructureBranch CanalOnGoingOfftake of Didauli Dy at 14km RD of Chandausi Branch Canal2019-08-29 17:17:10.0
989Mahuar ProjectMadhya PradeshShivpuriOtherHeadWorksnullDRB at RBC from Mahauar dam2019-07-27 12:03:51.0
990Mod. of Gang CanalBranchCanalAnyOther2018-09-28 17:03:36.0
991Mod. of Gang CanalBranchCanalAnyOther2018-09-28 17:03:36.0
992Mod. of Gang CanalBranchCanalAnyOther2018-09-28 17:03:36.0
993Mod. of Gang CanalRajasthanGanganagarMinors/ Sub-MinorsOutletComplete2019-07-17 11:49:06.0
994Mod. of Gang CanalRajasthanGanganagarStructureBranch CanalCompleteNull2019-07-18 13:26:40.0
995Mod. of Gang CanalRajasthanGanganagarStructureBranch CanalCompleteNull2019-07-18 13:28:40.0
996Morna (Gureghar)MaharashtraSataraMain CanalMain CanalComplete2020-02-26 12:37:04.0
997Morna (Gureghar)MaharashtraSataraMain CanalMain CanalComplete2020-02-26 12:39:12.0
998Morna (Gureghar)MaharashtraSataraMain CanalMain CanalComplete2020-02-26 12:41:53.0
999Morna (Gureghar)MaharashtraSataraMain CanalMain CanalComplete2020-02-26 12:42:46.0
1000Morna (Gureghar)MaharashtraSataraStructureMain CanalOnGoing2020-02-26 12:46:25.0
1001Morna (Gureghar)MaharashtraSataraStructureMain CanalOnGoingRBC2020-02-26 13:38:41.0
1002Morna (Gureghar)MaharashtraSataraMain CanalMain CanalComplete2020-02-26 13:46:11.0
1003Morna (Gureghar)MaharashtraSataraStructureMain CanalComplete2020-02-26 13:48:27.0
1004Morna (Gureghar)MaharashtraSataraStructureMain CanalYet To Be Completed2020-02-26 13:51:31.0
1005Narmada CanalJalorMainCanalMaincanalComplete2018-10-11 16:48:05.0
1006nullJalorMainCanalStructureOngoing2018-10-11 17:17:00.0
1007Narmada CanalJalorMainCanalStructureComplete2018-10-12 10:43:42.0
1008Omkareshwar Project Canal Ph-III (RBC Km. 65.50 to Km. 142)Madhya PradeshDharMaincanalMain CanalCompletemain canal at mumbai agra highway nh3 passing through box culvert2020-04-29 01:10:36.0
1009Sangola Branch CanalMaharashtraSolapurStructureBranch CanalComplete2019-12-26 16:24:31.0
1010Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalCompleteRoad crossing and Pipe pushing2019-12-26 16:36:56.0
1011Sangola Branch CanalMaharashtraSolapurBranch CanalBranch CanalCompleteRoad crossing2019-12-26 16:39:25.0
1012Sardar SarovarGujaratGandhinagarMain CanalMaincanalOnGoing2019-06-28 14:43:53.0
1013Sardar SarovarGujaratGandhinagarMaincanalMain CanalCompletefor testing2019-06-28 14:56:34.0
1014Sardar SarovarGujaratGandhinagarMain CanalMaincanalCompletefor testing2019-06-28 14:58:08.0
1015Saryu Nahar PariyojanaUttar PradeshBahraichBranch CanalBranch CanalComplete??????2019-08-07 09:34:30.0
1016Saryu Nahar PariyojanaUttar PradeshBalrampurMain CanalMain CanalOnGoing2019-08-07 13:42:08.0
1017Sri KomarambheemTelanganaAdilabadDistributariesDistributariesCompleteD1L22020-06-10 14:20:50.0
1018Sri KomarambheemTelanganaAdilabadDistributariesDistributariesCompleteD1L22020-06-10 14:21:29.0
1019Sri Rameshwar IrrigationBelgaumMaincanalStructureComplete2019-03-13 13:04:42.0
1020Sri Rameshwar IrrigationBelgaumnullOutletComplete2019-03-13 13:20:40.0
1021SubernarekhaOdishaMayurbhanjBranch CanalBranch CanalOnGoingc/r cum H/R under progress2019-07-29 16:29:36.0
1022Subernarekha MultipurposeJharkhandPurbi SinghbhumMinors/ Sub-MinorsOutletComplete2019-08-19 11:19:36.0
1023TaraliMaharashtraSataraMaincanalMain CanalOnGoingMaan extended canal2019-06-13 15:17:53.0
1024TaraliMaharashtraSataraMain CanalMain CanalCompleteAqueduct2020-02-28 17:03:57.0
1025TaraliMaharashtraSataraMain CanalMain CanalComplete2020-02-28 17:06:06.0
1026Tillari (MH)MaharashtraNorth GoaOutletBranch CanalYet To Be CompletedNH 66, crossing is pending, all the letters regarding Required NOC is submitted to the NHAI, BUT still irrigation department does not receive any response from NHAI2019-12-09 12:19:20.0
1027Upper Indravati (KBK)OdishaKalahandiMinors/ Sub-MinorsAny OtherKashibahal Well2019-06-07 10:15:55.0
1028Upper Indravati (KBK)OdishaKalahandiBranch CanalBranch CanalCompletechhuriagarh branch canal2019-06-07 16:10:57.0
1031DurgawatiBiharRohtasDistributariesDistributariesComplete2020-08-06 11:34:05.0
1032DurgawatiBiharRohtasDistributariesDistributariesComplete2020-08-06 11:37:19.0
1033DurgawatiBiharRohtasDistributariesDistributariesComplete2020-08-06 12:02:45.0
1034DurgawatiBiharRohtasDistributariesDistributariesComplete2020-08-06 12:16:22.0
1035Sardar SarovarGujaratRajkotMain CanalMain CanalComplete2020-08-06 12:56:28.0
1036DurgawatiBiharRohtasDistributariesDistributariesOnGoing2020-08-06 14:19:35.0
1037DurgawatiBiharRohtasHeadWorksDamOnGoing2020-08-06 15:44:58.0
1038DurgawatiBiharRohtasHeadWorksDamComplete2020-08-06 16:37:02.0
1039DurgawatiBiharRohtasHeadWorksDamComplete2020-08-06 16:37:17.0