1 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Postikudi | 2019-06-06 08:00:54.0 | | |
2 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Utkal | 2019-06-05 17:43:55.0 | | |
3 | Upper Indravati (KBK) | Odisha | Kalahandi | HeadWorks | Other | | Tunnel Intake Point | 2019-06-06 16:04:37.0 | | |
4 | Upper Indravati (KBK) | Odisha | Kalahandi | HeadWorks | Other | | Tunnel Intake Point | 2019-06-06 16:04:38.0 | | |
5 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | This work is to be done by Railway Department, due to corona effect the works are pending. The payment has been released to railway department from client.
| 2020-06-25 12:01:19.0 | | |
6 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | Complete | Highway crossing (NH4) works for main canal is completed. | 2020-06-25 12:04:07.0 | | |
7 | Upper Tunga | Karnataka | Haveri | Distributaries | Distributaries | Yet To Be Completed | Off take point of DY- 6 is pending due to land acquisition | 2020-06-25 13:18:10.0 | | |
8 | Upper Tunga | Karnataka | Haveri | Distributaries | Distributaries | Yet To Be Completed | Due to land acquisition the work is not yet started. | 2020-06-25 14:01:06.0 | | |
9 | Nandur Madhmeshwar Ph. II | | Nashik | HeadWorks | Dam | Complete | bham dam | 2019-06-04 11:18:30.0 | | |
10 | Dolaithabi Barrage | | Imphal East | MainCanal | Structure | yettobecomplete | | 2018-11-21 02:49:28.0 | | |
11 | null | | Chhatarpur | MainCanal | Maincanal | Complete | | 2018-10-04 11:09:09.0 | | |
12 | Durgawati | | Kaimur (Bhabua) | Distributaries | Structure | Complete | | 2018-12-13 17:12:59.0 | | |
13 | NLBC | | Yadgir | Minors_Sub_Minors | AnyOther | | | 2018-11-08 15:03:05.0 | | |
14 | Punpun | | Aurangabad | Headworks | Barrage | Ongoing | | 2018-12-12 14:22:53.0 | | |
15 | Upper Indravati (KBK) | Odisha | Kalahandi | Maincanal | Main Canal | Complete | Right Main Canal | 2019-06-06 10:52:37.0 | | |
16 | Upper Indravati (KBK) | Odisha | Kalahandi | HeadWorks | Other | | Penstock | 2019-06-06 16:04:37.0 | | |
17 | Upper Indravati (KBK) | Odisha | Kalahandi | Distributaries | Distributaries | Complete | Bijamara Distributary | 2019-06-06 16:29:14.0 | | |
18 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Bijamara Village | 2019-06-06 16:46:21.0 | | |
19 | Upper Indravati (KBK) | Odisha | Kalahandi | Distributaries | Distributaries | Complete | Ambatula Distributary | 2019-06-06 17:01:25.0 | | |
20 | Upper Indravati (KBK) | Odisha | Kalahandi | Maincanal | Structure | Complete | Right Main Canal | 2019-06-06 10:52:37.0 | | |
21 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Jaypatnam | 2019-06-06 16:24:46.0 | | |
22 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | Excavation work is in progress, will be completed by 25th July 2020 | 2020-06-25 16:09:59.0 | | |
23 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | Complete | Completed | 2020-06-25 16:24:19.0 | | |
24 | Champamati | | Kokrajhar | Branch Canal | Branch Canal | Complete | SRBC | 2019-05-11 13:39:49.0 | | |
25 | J. Chokka Rao LIS | | Warangal | Minors/ Sub-Minors | Structure | OnGoing | | 2019-05-03 12:23:49.0 | | |
26 | Thoubal | Manipur | Senapati | Maincanal | Any Other | | abutment under construction | 2019-08-27 12:50:17.0 | | |
27 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | Yet To Be Completed | land problem | 2019-12-05 12:20:59.0 | | |
28 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | | Katni | BranchCanal | Maincanal | Ongoing | | 2018-12-18 12:48:31.0 | | |
29 | Dolaithabi Barrage | Manipur | Imphal East | Distributaries | Distributaries | Yet To Be Completed | field channel | 2019-08-26 13:28:28.0 | | |
30 | Gundlakamma | Andhra Pradesh | Prakasam | Structure | Maincanal | Complete | Super Passage Cum SLRB | 2019-11-18 11:56:35.0 | | |
31 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | Complete | 21R major distributoris | 2019-12-05 11:30:38.0 | | |
32 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | Complete | Nachangaon | 2019-08-05 13:31:36.0 | | |
33 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | khangaon Fall | 2019-08-05 18:02:36.0 | | |
34 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | | 2019-12-16 14:45:13.0 | | |
35 | Thoubal | Manipur | Thoubal | Main Canal | Maincanal | OnGoing | | 2019-08-27 17:23:24.0 | | |
36 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | Mangalpur Sub Minor | 2019-06-06 10:56:05.0 | | |
37 | Upper Indravati (KBK) | Odisha | Kalahandi | Maincanal | Main Canal | Complete | Left Main Canal | 2019-06-06 17:12:04.0 | | |
38 | Upper Indravati (KBK) | Odisha | Kalahandi | Distributaries | Distributaries | Complete | Golamunda Distributary | 2019-06-07 16:10:58.0 | | |
39 | Upper Indravati (KBK) | Odisha | Kalahandi | Distributaries | Structure | Complete | Tel River Aquiduct | 2019-06-07 16:10:58.0 | | |
40 | Upper Indravati (KBK) | Odisha | Kalahandi | Distributaries | Distributaries | Complete | Nagfani Distributary | 2019-06-06 16:06:26.0 | | |
41 | Upper Indravati (KBK) | Odisha | Kalahandi | Maincanal | Main Canal | Complete | Right Extension Main Canal | 2019-06-06 08:05:25.0 | | |
42 | Nandur Madhmeshwar Ph. II | | Nashik | HeadWorks | Other | Complete | r&r works | 2019-06-04 11:18:31.0 | | |
43 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | Excavation work is completed | 2020-06-25 17:10:09.0 | | |
44 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | Earthwork under progress at tail end for 700meters | 2020-06-25 17:17:59.0 | | |
45 | Kelo | | | Maincanal | Main Canal | Complete | | 2019-06-11 11:17:46.0 | | |
46 | Waghur Project | | Jalgaon | Maincanal | Critical Issue / Bottleneck | OnGoing | | 2019-05-08 17:56:06.0 | | |
47 | Telengiri | Odisha | Koraput | Minors/ Sub-Minors | Outlet | Complete | | 2019-06-11 20:46:57.0 | | |
48 | Telengiri | Odisha | Koraput | Minors/ Sub-Minors | Outlet | Complete | | 2019-06-11 20:46:58.0 | | |
49 | Telengiri | Odisha | Koraput | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | B.Singhpur -podapadar minor | 2019-06-11 20:46:58.0 | | |
50 | Telengiri | Odisha | Koraput | Maincanal | Outlet | OnGoing | CD work over WC under progress | 2019-06-11 20:46:58.0 | | |
51 | Bargi Diversion Project Ph- I (km. 16 to Km 63) | | Jabalpur | Minors_Sub_Minors | AnyOther | | | 2018-12-17 14:46:12.0 | | |
52 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-17 11:32:35.0 | | |
53 | Mod. of Gang Canal | | | MainCanal | Structure | Complete | | 2018-09-28 17:03:36.0 | | |
54 | Mod. of Gang Canal | | | MainCanal | Structure | Complete | | 2018-09-28 17:03:36.0 | | |
55 | Telengiri | Odisha | Koraput | Minors/ Sub-Minors | Outlet | Complete | village B Janiguda | 2019-06-11 20:46:57.0 | | |
56 | Mod. of Gang Canal | | | BranchCanal | Structure | Ongoing | | 2018-09-28 17:03:36.0 | | |
57 | Mod. of Gang Canal | | | BranchCanal | Structure | Ongoing | | 2018-09-28 17:03:36.0 | | |
58 | Sagad Project | Madhya Pradesh | Vidisha | Maincanal | Main Canal | Complete | main canal gudan khedi village | 2019-06-13 11:12:29.0 | | |
59 | Telengiri | Odisha | Koraput | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-06-11 20:46:57.0 | | |
60 | Telengiri | Odisha | Koraput | Maincanal | Main Canal | Complete | | 2019-06-11 20:46:58.0 | | |
61 | Telengiri | Odisha | Koraput | Maincanal | Main Canal | Complete | cut and cover | 2019-06-11 20:46:58.0 | | |
62 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Well | 2019-06-06 10:58:06.0 | | |
63 | Upper Indravati (KBK) | Odisha | Kalahandi | Maincanal | Any Other | | Kusumkhunti Well | 2019-06-06 17:20:47.0 | | |
64 | Upper Indravati (KBK) | Odisha | Kalahandi | Distributaries | Distributaries | Complete | Jaring Distributary | 2019-06-06 08:43:27.0 | | |
65 | Upper Indravati (KBK) | Odisha | Kalahandi | Distributaries | Distributaries | Complete | Koilgaon Distributary | 2019-06-06 08:46:08.0 | | |
66 | Upper Tunga | | Haveri | Distributaries | Maincanal | Complete | | 2018-12-12 13:41:12.0 | | |
67 | Kelo | | | Maincanal | Main Canal | Complete | | 2019-06-11 11:18:01.0 | | |
68 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | HeadWorks | Dam | OnGoing | | 2019-08-05 18:06:45.0 | | |
69 | Dolaithabi Barrage | Manipur | Imphal East | Distributaries | Distributaries | Yet To Be Completed | field channel | 2019-08-26 13:30:04.0 | | |
70 | Upper Tunga | | Haveri | MainCanal | Maincanal | Ongoing | | 2018-12-12 10:55:03.0 | | |
71 | --Select-- | | Haveri | Distributaries | AnyOther | | | 2018-12-14 14:01:12.0 | | |
72 | Thoubal | | Imphal East | MainCanal | Maincanal | Ongoing | | 2018-11-21 15:10:17.0 | | |
73 | Durgawati | | Rohtas | Headworks | Dam | Complete | | 2018-12-13 16:35:45.0 | | |
74 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Distributaries | Complete | lining is completed in the month of Nov 2019 | 2019-12-26 14:44:01.0 | | |
75 | Champamati | | Chirang | MainCanal | AnyOther | | | 2018-12-07 12:26:30.0 | | |
76 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-17 11:36:41.0 | | |
77 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 10:30:20.0 | | |
78 | Durgawati | | Rohtas | MainCanal | Structure | Complete | | 2018-12-13 09:35:38.0 | | |
79 | Durgawati | | Rohtas | MainCanal | Structure | Complete | | 2018-12-13 11:38:18.0 | | |
80 | J. Chokka Rao LIS | | Warangal | Maincanal | Any Other | null | | 2019-05-04 09:10:06.0 | | |
81 | Int. Anandapur Barrage Ph. I | Odisha | Kendujhar | Maincanal | Structure | OnGoing | | 2019-08-27 12:57:17.0 | | |
82 | | | Buldana | MainCanal | Maincanal | Complete | | 2018-11-27 11:39:10.0 | | |
83 | | | Buldana | MainCanal | Maincanal | Complete | | 2018-11-27 11:39:44.0 | | |
84 | Mahi Project | | Dhar | Distributaries | Outlet | Complete | | 2018-12-05 15:23:02.0 | | |
85 | Musuramilli | | East Godavari | MainCanal | Maincanal | Complete | | 2018-12-05 13:03:43.0 | | |
86 | Sagad Project | Madhya Pradesh | Vidisha | HeadWorks | Other | | aqueduct at enchda village | 2019-06-13 12:09:11.0 | | |
87 | Tarali | Maharashtra | Satara | Maincanal | Main Canal | OnGoing | Khatav left bank canal | 2019-06-13 11:40:21.0 | | |
88 | Tarali | Maharashtra | Satara | Maincanal | Structure | OnGoing | | 2019-06-13 11:40:21.0 | | |
89 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | Mangalpur Sub Minor | 2019-06-06 11:19:37.0 | | |
90 | NLBC | | Bijapur | Headworks | Dam | Complete | | 2018-11-08 19:25:17.0 | | |
91 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Well | 2019-06-06 09:03:47.0 | | |
92 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-12 11:17:28.0 | | |
93 | Sagad Project | Madhya Pradesh | Vidisha | HeadWorks | Dam | Complete | sagad dam | 2019-06-13 13:57:18.0 | | |
94 | J. Chokka Rao LIS | | Warangal | HeadWorks | Other | null | | 2019-05-03 10:23:53.0 | | |
95 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:20:46.0 | | |
96 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:42:47.0 | | |
97 | Champamati | | Chirang | MainCanal | Maincanal | Complete | | 2018-12-07 11:56:12.0 | | |
98 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-12 12:47:25.0 | | |
99 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 10:22:02.0 | | |
100 | Durgawati | | Rohtas | MainCanal | Maincanal | Complete | | 2018-12-13 11:11:51.0 | | |
101 | J. Chokka Rao LIS | | Warangal | HeadWorks | Other | null | | 2019-05-03 18:04:43.0 | | |
102 | Khadakpurna | | Buldana | Minors_Sub_Minors | Outlet | Ongoing | | 2018-11-27 12:20:01.0 | | |
103 | Kudali | Maharashtra | Satara | HeadWorks | Dam | OnGoing | Mahu dam | 2019-06-14 11:57:57.0 | | |
104 | Kudali | Maharashtra | Satara | HeadWorks | Dam | OnGoing | mahu dam | 2019-06-14 12:05:48.0 | | |
105 | Mahi Project | | Dhar | Minors_Sub_Minors | Outlet | Complete | | 2018-12-04 14:30:50.0 | | |
106 | Mahi Project | | Dhar | Distributaries | Outlet | Complete | | 2018-12-05 15:46:48.0 | | |
107 | Maniyari Tank (ERM) | | | Branch Canal | Branch Canal | Complete | | 2019-06-18 11:34:20.0 | | |
108 | Nandur Madhmeshwar Ph. II | | Aurangabad | Minors_Sub_Minors | AnyOther | | | 2018-11-28 13:37:16.0 | | |
109 | Punpun | | Aurangabad | MainCanal | Structure | Complete | | 2018-12-12 14:25:31.0 | | |
110 | Punpun | | Aurangabad | Headworks | Barrage | Ongoing | | 2018-12-12 13:47:15.0 | | |
111 | Sardar Sarovar | | Kachchh | BranchCanal | Maincanal | Ongoing | | 2018-12-05 10:01:34.0 | | |
112 | Tarali | Maharashtra | Satara | Maincanal | Structure | | | 2019-06-13 11:46:16.0 | | |
113 | Tarali | Maharashtra | Satara | Maincanal | Main Canal | OnGoing | | 2019-06-13 12:42:19.0 | | |
114 | Thoubal | | Thoubal | MainCanal | Maincanal | Complete | | 2018-11-22 09:33:47.0 | | |
115 | Upper Indravati (KBK) | Odisha | Kalahandi | HeadWorks | Barrage | Complete | | 2019-06-06 11:21:52.0 | | |
116 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Well | 2019-06-06 09:13:29.0 | | |
117 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:20:54.0 | | |
118 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:43:01.0 | | |
119 | Thoubal | Manipur | Imphal East | Branch Canal | Branch Canal | Yet To Be Completed | | 2019-08-27 14:03:54.0 | | |
120 | Bansagar Unit - II | | Rewa | BranchCanal | Structure | Complete | | 2018-12-14 14:04:24.0 | | |
121 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | | Katni | MainCanal | AnyOther | | | 2018-12-18 11:41:32.0 | | |
122 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-17 11:47:42.0 | | |
123 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-17 13:27:39.0 | | |
124 | Dolaithabi Barrage | Manipur | Imphal East | Distributaries | Distributaries | Yet To Be Completed | field channel | 2019-08-26 13:34:05.0 | | |
125 | Durgawati | | Rohtas | Distributaries | Maincanal | Complete | | 2018-12-13 10:30:34.0 | | |
126 | Durgawati | | Rohtas | Distributaries | Structure | Complete | | 2018-12-13 12:11:33.0 | | |
127 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 10:23:21.0 | | |
128 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 09:36:48.0 | | |
129 | Gundlakamma | Andhra Pradesh | Prakasam | Structure | Maincanal | Complete | DLRB cum Drain | 2019-11-18 12:08:01.0 | | |
130 | Int. Anandapur Barrage Ph. I | Odisha | Kendujhar | Maincanal | Main Canal | Complete | MDR bridge under construction | 2019-08-27 17:45:56.0 | | |
131 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | Complete | DBM60 | 2019-12-05 12:47:11.0 | | |
132 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | D1 A | 2019-12-23 11:17:09.0 | | |
133 | Khadakpurna | | Buldana | Maincanal | Main Canal | OnGoing | | 2019-05-08 11:46:58.0 | | |
134 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | shekapur minor 1 | 2019-08-05 18:07:02.0 | | |
135 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:23:45.0 | | |
136 | Mahan Project | | Chhindwara | BranchCanal | Structure | Ongoing | | 2018-12-13 12:47:40.0 | | |
137 | Sagad Project | Madhya Pradesh | Vidisha | Distributaries | Distributaries | Complete | distributary no.3 | 2019-06-13 11:50:58.0 | | |
138 | Upper Indravati (KBK) | Odisha | Kalahandi | Maincanal | Main Canal | Complete | Left Main Canal | 2019-06-06 11:25:54.0 | | |
139 | Upper Tunga | | Haveri | MainCanal | Maincanal | Complete | | 2018-12-12 13:52:41.0 | | |
140 | null | | Chhatarpur | MainCanal | Maincanal | Complete | | 2018-10-04 11:09:09.0 | | |
141 | null | | Kargil | MainCanal | Maincanal | Ongoing | | 2018-10-02 09:41:13.0 | | |
142 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-12 11:37:56.0 | | |
143 | Durgawati | | Rohtas | Distributaries | Outlet | Complete | | 2018-12-13 11:46:16.0 | | |
144 | null | | Kargil | MainCanal | Maincanal | Ongoing | | 2018-10-02 09:41:13.0 | | |
145 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | Kalampur Minor | 2019-06-06 09:32:53.0 | | |
146 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:20:59.0 | | |
147 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:43:11.0 | | |
148 | Singhpur Project | | Chhatarpur | MainCanal | Maincanal | Complete | | 2018-10-03 15:43:17.0 | | |
149 | Champamati | | Chirang | MainCanal | AnyOther | | | 2018-12-07 12:55:19.0 | | |
150 | Upper Indravati (KBK) | Odisha | Kalahandi | HeadWorks | Barrage | Complete | Mangalpur | 2019-06-06 11:48:53.0 | | |
151 | Singhpur Project | | Chhatarpur | Distributaries | AnyOther | | | 2018-10-03 16:58:01.0 | | |
152 | Dolaithabi Barrage | Manipur | Imphal East | Distributaries | Distributaries | Yet To Be Completed | field channel | 2019-08-26 13:35:32.0 | | |
153 | Punpun | | Rohtas | Distributaries | Maincanal | Complete | | 2018-12-13 10:44:32.0 | | |
154 | Durgawati | | Rohtas | Distributaries | Outlet | Complete | | 2018-12-13 10:46:41.0 | | |
155 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 11:43:42.0 | | |
156 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 12:35:02.0 | | |
157 | Durgawati | | Rohtas | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-13 14:03:19.0 | | |
158 | Durgawati | | Rohtas | MainCanal | Maincanal | Ongoing | | 2018-12-13 09:40:16.0 | | |
159 | Durgawati | | Rohtas | Distributaries | Outlet | Complete | | 2018-12-13 12:36:38.0 | | |
160 | Kelo | | Raigarh | Distributaries | Maincanal | Ongoing | | 2018-12-20 15:25:40.0 | | |
161 | Mahi Project | | Dhar | Headworks | Dam | Complete | | 2018-12-04 15:29:46.0 | | |
162 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:24:50.0 | | |
163 | Upper Tunga | | Haveri | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-12 14:20:11.0 | | |
164 | Saryu Nahar Pariyojana | Uttar Pradesh | Bahraich | HeadWorks | Barrage | Complete | | 2019-08-05 18:08:28.0 | | |
165 | Singhpur Project | | Chhatarpur | MainCanal | Maincanal | Complete | | 2018-10-03 15:43:17.0 | | |
166 | null | | Chhatarpur | MainCanal | Structure | Complete | | 2018-10-03 15:58:16.0 | | |
167 | Upper Indravati (KBK) | | Kalahandi | MainCanal | Structure | Complete | | 2018-12-27 09:49:32.0 | | |
168 | Durgawati | | Rohtas | Distributaries | Outlet | Complete | | 2018-12-13 12:01:34.0 | | |
169 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Well | 2019-06-06 10:20:28.0 | | |
170 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:24:20.0 | | |
171 | Dolaithabi Barrage | Manipur | Imphal East | Any Other | Distributaries | null | completed | 2019-08-26 14:26:55.0 | | |
172 | Gundlakamma | Andhra Pradesh | Prakasam | Dam | HeadWorks | Complete | Dam | 2019-11-18 12:33:09.0 | | |
173 | Nardave (Mahammadwadi) | Maharashtra | Sindhudurg | HeadWorks | Dam | Yet To Be Completed | this is to be planned by March 20 on the first priority | 2019-12-05 13:14:31.0 | | |
174 | Borolia | | Warangal | HeadWorks | Dam | Complete | test | 2019-05-03 14:23:28.0 | | |
175 | Dhansiri | | Udalguri | Distributaries | Maincanal | Complete | | 2018-12-12 12:03:31.0 | | |
176 | Mahi Project | | Dhar | MainCanal | Maincanal | Complete | | 2018-12-04 17:09:11.0 | | |
177 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | Complete | | 2019-06-18 12:45:36.0 | | |
178 | Bargi Diversion Project Ph- I (km. 16 to Km 63) | | Jabalpur | Distributaries | Structure | Complete | | 2018-12-17 11:22:31.0 | | |
179 | Champamati | | Chirang | MainCanal | AnyOther | | | 2018-12-07 11:48:41.0 | | |
180 | Champamati | | Chirang | BranchCanal | Maincanal | Complete | | 2018-12-07 13:57:53.0 | | |
181 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 09:47:49.0 | | |
182 | Durgawati | | Rohtas | MainCanal | Structure | Ongoing | | 2018-12-13 11:08:00.0 | | |
183 | Int. Anandapur Barrage Ph. I | Odisha | Baleshwar | Maincanal | Structure | Complete | d/s photo | 2019-08-28 12:53:34.0 | | |
184 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | shekapur minor 1 Fall | 2019-08-05 18:09:01.0 | | |
185 | Bansagar Unit - II | | Sidhi | BranchCanal | Structure | Complete | | 2018-12-14 13:33:07.0 | | |
186 | Mahuar Project | | Sidhi | Distributaries | Outlet | Complete | | 2018-12-13 15:29:31.0 | | |
187 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:25:47.0 | | |
188 | NLBC | | Yadgir | Minors_Sub_Minors | AnyOther | | | 2018-11-08 15:05:47.0 | | |
189 | Sardar Sarovar | | Patan | Distributaries | Maincanal | Complete | | 2018-12-06 12:47:10.0 | | |
190 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | Kendupuda Minor | 2019-06-06 10:20:28.0 | | |
191 | Upper Indravati (KBK) | Odisha | Kalahandi | HeadWorks | Other | | Lift Canal | 2019-06-06 11:51:37.0 | | |
192 | Upper Indravati (KBK) | | Kalahandi | MainCanal | Maincanal | Complete | | 2018-12-27 09:42:38.0 | | |
193 | Dolaithabi Barrage | | Imphal East | MainCanal | Structure | yettobecomplete | | 2018-11-21 02:52:22.0 | | |
194 | Gosikhurd (NP) | | Bhandara | Headworks | Dam | Complete | | 2018-10-11 11:00:20.0 | | |
195 | Gosikhurd (NP) | | Bhandara | MainCanal | AnyOther | | | 2018-10-11 12:29:12.0 | | |
196 | Gosikhurd (NP) | | Bhandara | Distributaries | Maincanal | Ongoing | | 2018-10-11 12:48:02.0 | | |
197 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:24:34.0 | | |
198 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:51:43.0 | | |
199 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | HeadWorks | Barrage | Complete | | 2019-06-27 18:05:53.0 | | |
200 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | | Katni | MainCanal | AnyOther | | | 2018-12-18 15:37:58.0 | | |
201 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | | Katni | MainCanal | Structure | Ongoing | | 2018-12-18 16:07:14.0 | | |
202 | Bargi Diversion Projrct Ph- II (Km. 63 to Km. 104) | | Jabalpur | Distributaries | Maincanal | Ongoing | | 2018-12-18 17:20:41.0 | | |
203 | Borolia | | Warangal | HeadWorks | Dam | Complete | test app | 2019-05-03 14:27:42.0 | | |
204 | Durgawati | | Rohtas | MainCanal | Maincanal | Complete | | 2018-12-13 10:09:25.0 | | |
205 | Durgawati | | Rohtas | Distributaries | Outlet | Complete | | 2018-12-13 12:43:55.0 | | |
206 | Gosikhurd (NP) | | Bhandara | MainCanal | Maincanal | Ongoing | | 2018-10-11 11:34:31.0 | | |
207 | Gosikhurd (NP) | | Bhandara | Distributaries | Maincanal | Complete | | 2018-10-11 13:02:25.0 | | |
208 | Gosikhurd (NP) | | Bhandara | Distributaries | Maincanal | Complete | | 2018-10-11 13:49:44.0 | | |
209 | SRSP St. II | | Warangal | Minors_Sub_Minors | Maincanal | Ongoing | | 2018-09-28 17:03:36.0 | | |
210 | Kelo | | Raigarh | Minors_Sub_Minors | Maincanal | Ongoing | | 2018-12-20 15:10:55.0 | | |
211 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:33:00.0 | | |
212 | Narmada Canal | | Jalor | MainCanal | Structure | Ongoing | | 2018-10-11 16:51:14.0 | | |
213 | null | | Jalor | MainCanal | Structure | Ongoing | | 2018-10-11 17:17:25.0 | | |
214 | Narmada Canal | | Jalor | MainCanal | Maincanal | Complete | | 2018-10-11 16:41:13.0 | | |
215 | null | | Jalor | MainCanal | Structure | Ongoing | | 2018-10-11 17:18:20.0 | | |
216 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | Distributaries | Distributaries | Complete | | 2019-06-27 14:50:03.0 | | |
217 | Upper Indravati (KBK) | Odisha | Kalahandi | HeadWorks | Other | | Lift Canal Pump House | 2019-06-06 12:14:39.0 | | |
218 | Upper Indravati (KBK) | Odisha | Kalahandi | HeadWorks | Other | | Tail Race Channel | 2019-06-06 12:14:40.0 | | |
219 | Arjun Shayak | | Mahoba | Headworks | Dam | Ongoing | | 2018-10-30 13:08:13.0 | | |
220 | null | | Kamrup Metropolitan | Headworks | Dam | null | | 2018-10-05 16:35:26.0 | | |
221 | null | | Kamrup Metropolitan | Headworks | Dam | null | | 2018-10-05 16:35:26.0 | | |
222 | Borolia | | Warangal | HeadWorks | Dam | Complete | test | 2019-05-03 16:22:16.0 | | |
223 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:51:58.0 | | |
224 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | HeadWorks | Barrage | Complete | | 2019-06-27 18:05:53.0 | | |
225 | Dolaithabi Barrage | Manipur | Imphal East | Any Other | Distributaries | null | completed | 2019-08-26 14:28:17.0 | | |
226 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Barrage | HeadWorks | Complete | Storage provide water for irrigation to Madhya Ganga Canal Phase I & II and Augmentation of Upper Ganga Canal | 2019-08-28 17:15:55.0 | | |
227 | null | | Prakasam | Headworks | Barrage | Complete | | 2018-10-22 11:23:35.0 | | |
228 | Gosikhurd (NP) | | Bhandara | BranchCanal | AnyOther | | | 2018-10-11 12:43:18.0 | | |
229 | Gosikhurd (NP) | | Bhandara | Minors_Sub_Minors | Maincanal | Ongoing | | 2018-10-11 12:55:11.0 | | |
230 | Gosikhurd (NP) | | Bhandara | MainCanal | Outlet | Complete | | 2018-10-10 11:55:56.0 | | |
231 | Gosikhurd (NP) | | Bhandara | BranchCanal | AnyOther | | | 2018-10-10 14:32:13.0 | | |
232 | null | | Bhandara | MainCanal | Maincanal | Ongoing | | 2018-10-10 17:16:33.0 | | |
233 | SRSP St. II | | Nalgonda | MainCanal | Maincanal | Ongoing | | 2018-09-28 17:03:36.0 | | |
234 | J. Chokka Rao LIS | | Warangal | HeadWorks | Other | null | | 2019-05-03 18:02:13.0 | | |
235 | SRSP St. II | | Nalgonda | Minors_Sub_Minors | Maincanal | Complete | | 2018-09-28 17:03:36.0 | | |
236 | SRSP St. II | | Nalgonda | Distributaries | Maincanal | Ongoing | | 2018-09-28 17:03:36.0 | | |
237 | Int. Anandapur Barrage Ph. I | Odisha | Baleshwar | Maincanal | Main Canal | Yet To Be Completed | critical LA issues, land owners refusing to receive compensation | 2019-08-28 12:57:34.0 | | |
238 | Lower Pedhi | | Amravati | BranchCanal | Structure | Ongoing | | 2018-10-09 17:30:24.0 | | |
239 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | khamgaon minor 1 | 2019-08-05 18:42:48.0 | | |
240 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | OnGoing | Permission for cutting trees in Main Canal alignment granted | 2019-08-29 11:43:07.0 | | |
241 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:33:51.0 | | |
242 | Waghur Project | | Jalgaon | Maincanal | Main Canal | Yet To Be Completed | | 2019-05-08 16:35:55.0 | | |
243 | Gosikhurd (NP) | | Bhandara | MainCanal | Structure | Complete | | 2018-10-11 13:33:56.0 | | |
244 | Maniyari Tank (ERM) | | | HeadWorks | Dam | Complete | | 2019-06-18 12:53:06.0 | | |
245 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | HeadWorks | Barrage | Complete | Kharkai | 2019-06-27 18:08:13.0 | | |
246 | Waghur Project | | Jalgaon | Maincanal | Main Canal | OnGoing | | 2019-05-08 17:00:51.0 | | |
247 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Other | HeadWorks | Complete | Head Regulator of Madhya Ganga Left Bank Canal Phase II | 2019-08-28 17:21:22.0 | | |
248 | Gundlakamma | Andhra Pradesh | Prakasam | Dam | HeadWorks | Complete | Dam | 2019-11-18 12:33:38.0 | | |
249 | Arjun Shayak | Uttar Pradesh | Mahoba | Other | HeadWorks | OnGoing | R&R Issues and Demand of Compensation on Present Rates | 2019-11-26 14:16:18.0 | | |
250 | Nardave (Mahammadwadi) | Maharashtra | Sindhudurg | Structure | Main Canal | Complete | completed in 2007 | 2019-12-05 13:17:28.0 | | |
251 | Gosikhurd (NP) | | Bhandara | MainCanal | AnyOther | | | 2018-10-12 09:18:49.0 | | |
252 | Champamati | | Chirang | MainCanal | AnyOther | | | 2018-12-07 12:08:32.0 | | |
253 | Gosikhurd (NP) | | Bhandara | BranchCanal | Maincanal | Ongoing | | 2018-10-10 14:25:48.0 | | |
254 | Gosikhurd (NP) | | Bhandara | MainCanal | Structure | Complete | | 2018-10-12 10:00:45.0 | | |
255 | Gosikhurd (NP) | | Bhandara | BranchCanal | AnyOther | | | 2018-10-11 14:09:44.0 | | |
256 | Karanja | Karnataka | Bidar | Structure | Distributaries | Complete | | 2019-12-23 11:35:49.0 | | |
257 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | khamgaon minor 1 | 2019-08-05 18:43:45.0 | | |
258 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | OnGoing | | 2019-08-29 12:28:27.0 | | |
259 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Main Canal | Complete | Head Regulators of Chandausi and Bahjoi Branch Canal | 2019-08-29 14:23:17.0 | | |
260 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:41:13.0 | | |
261 | null | | Ernakulam | Minors_Sub_Minors | Maincanal | Ongoing | | 2018-10-12 10:20:18.0 | | |
262 | Nandur Madhmeshwar Ph. II | | Aurangabad | Minors_Sub_Minors | AnyOther | | | 2018-11-28 13:39:52.0 | | |
263 | Narmada Canal | | Jalor | MainCanal | Maincanal | Complete | | 2018-10-11 16:39:17.0 | | |
264 | Narmada Canal | | Jalor | MainCanal | Structure | Ongoing | | 2018-10-11 16:44:50.0 | | |
265 | Narmada Canal | | Jalor | MainCanal | Structure | Complete | | 2018-10-12 10:33:29.0 | | |
266 | Narmada Canal | | Jalor | MainCanal | Structure | Complete | | 2018-10-12 10:37:45.0 | | |
267 | Sardar Sarovar | | Kachchh | BranchCanal | Maincanal | Ongoing | | 2018-12-05 10:19:55.0 | | |
268 | Upper Tunga | | Haveri | Minors_Sub_Minors | Structure | Complete | | 2018-12-12 12:52:10.0 | | |
269 | Waghur Project | | Jalgaon | Branch Canal | Branch Canal | Complete | | 2019-05-08 17:11:06.0 | | |
270 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | HeadWorks | Barrage | Complete | Kharkai | 2019-06-27 18:12:51.0 | | |
271 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | HeadWorks | Barrage | Complete | Kharkai | 2019-06-27 18:12:51.0 | | |
272 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | HeadWorks | Dam | OnGoing | | 2019-06-27 18:12:52.0 | | |
273 | | | Wardha | Headworks | Dam | Complete | | 2018-09-28 17:03:36.0 | | |
274 | Kelo | | Raigarh | MainCanal | CriticalIssue | yettobecomplete | | 2018-12-20 15:56:26.0 | | |
275 | Gosikhurd (NP) | | Bhandara | BranchCanal | Maincanal | Complete | | 2018-10-10 14:46:09.0 | | |
276 | Gosikhurd (NP) | | Bhandara | MainCanal | Structure | Complete | | 2018-10-12 09:33:41.0 | | |
277 | null | | Chandrapur | MainCanal | Maincanal | Ongoing | | 2018-10-17 13:58:26.0 | | |
278 | Gosikhurd (NP) | | Bhandara | MainCanal | Maincanal | Complete | | 2018-10-17 12:34:14.0 | | |
279 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:08:31.0 | | |
280 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:43:18.0 | | |
281 | Narmada Canal | | Jalor | MainCanal | Structure | Complete | | 2018-10-12 10:30:45.0 | | |
282 | Narmada Canal | | Jalor | MainCanal | Structure | Complete | | 2018-10-12 10:35:20.0 | | |
283 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Distributaries | Distributaries | Complete | Kashidih minor | 2019-06-28 10:25:43.0 | | |
284 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:44:17.0 | | |
285 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Distributaries | Distributaries | Complete | Khasidi | 2019-06-28 10:25:43.0 | | |
286 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | mahuliya subminor | 2019-06-28 11:43:17.0 | | |
287 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Minors/ Sub-Minors | Outlet | Complete | turnout | 2019-06-28 11:43:17.0 | | |
288 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Minors/ Sub-Minors | Structure | Complete | | 2019-06-28 11:43:18.0 | | |
289 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Maincanal | Structure | OnGoing | | 2019-06-28 14:05:13.0 | | |
290 | Gundlakamma | | Prakasam | Minors_Sub_Minors | AnyOther | | | 2018-10-22 12:13:26.0 | | |
291 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-12 12:16:48.0 | | |
292 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:44:17.0 | | |
293 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Barrage | HeadWorks | Complete | Downstream Side | 2019-08-28 17:26:32.0 | | |
294 | Arjun Shayak | | Mahoba | MainCanal | Maincanal | Complete | | 2018-10-29 15:35:36.0 | | |
295 | Arjun Shayak | | Mahoba | Headworks | Dam | Complete | | 2018-10-29 15:37:33.0 | | |
296 | --Select-- | | Haveri | MainCanal | Maincanal | Ongoing | | 2018-12-13 11:34:30.0 | | |
297 | Gosikhurd (NP) | | Chandrapur | MainCanal | Maincanal | Ongoing | | 2018-10-17 14:01:15.0 | | |
298 | null | | Prakasam | BranchCanal | Maincanal | Complete | | 2018-10-22 12:51:38.0 | | |
299 | Gundlakamma | | Prakasam | BranchCanal | Maincanal | Complete | | 2018-10-22 12:54:00.0 | | |
300 | null | | Prakasam | MainCanal | Maincanal | Complete | | 2018-10-22 14:07:06.0 | | |
301 | null | | Prakasam | Distributaries | Maincanal | Complete | | 2018-10-22 14:08:06.0 | | |
302 | SRSP St. II | | Warangal | Minors_Sub_Minors | Maincanal | Ongoing | | 2018-09-28 17:03:36.0 | | |
303 | null | | Prakasam | Distributaries | Maincanal | Complete | | 2018-10-22 14:09:28.0 | | |
304 | SRSP St. II | | Warangal | BranchCanal | Maincanal | Ongoing | | 2018-09-28 17:03:36.0 | | |
305 | J. Chokka Rao LIS | | Warangal | Maincanal | Structure | Complete | | 2019-05-03 16:26:00.0 | | |
306 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | Complete | | 2019-08-29 12:46:58.0 | | |
307 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:10:10.0 | | |
308 | Sri Komarambheem | Telangana | Adilabad | Distributaries | Distributaries | Complete | | 2019-08-29 14:27:41.0 | | |
309 | Mod. of Gang Canal | | | Minors_Sub_Minors | Outlet | Complete | | 2018-09-28 17:03:36.0 | | |
310 | Arjun Shayak | | Mahoba | Headworks | Dam | Complete | | 2018-10-29 15:45:50.0 | | |
311 | Arjun Shayak | | Mahoba | Headworks | Dam | Complete | | 2018-10-29 15:50:57.0 | | |
312 | Upper Indravati (KBK) | | Kalahandi | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-27 12:26:43.0 | | |
313 | Upper Tunga | | Haveri | Distributaries | Maincanal | Ongoing | | 2018-12-13 12:47:21.0 | | |
314 | Kanupur | Odisha | Kendujhar | HeadWorks | Dam | Yet To Be Completed | HL Bridge over spillchannel on NH yet to be started | 2019-08-31 18:17:48.0 | | |
315 | Arjun Shayak | | Mahoba | MainCanal | Maincanal | Ongoing | | 2018-10-29 18:22:07.0 | | |
316 | Arjun Shayak | | Mahoba | MainCanal | AnyOther | | | 2018-10-30 10:30:44.0 | | |
317 | Arjun Shayak | | Mahoba | MainCanal | AnyOther | | | 2018-10-30 10:32:57.0 | | |
318 | Arjun Shayak | | Mahoba | MainCanal | AnyOther | | | 2018-10-30 11:48:28.0 | | |
319 | Upper Indravati (KBK) | | Kalahandi | Distributaries | Maincanal | Complete | | 2018-12-27 11:09:47.0 | | |
320 | Durgawati | | Rohtas | MainCanal | Maincanal | Complete | | 2018-12-13 10:10:16.0 | | |
321 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 10:22:04.0 | | |
322 | Durgawati | | Rohtas | MainCanal | Structure | Ongoing | | 2018-12-13 11:10:06.0 | | |
323 | Kudali | Maharashtra | Satara | HeadWorks | Dam | OnGoing | Hathyar Dam | 2019-06-28 10:35:26.0 | | |
324 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | OnGoing | Court Case resolved | 2019-08-28 18:10:51.0 | | |
325 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Main Canal | OnGoing | | 2019-08-29 13:21:28.0 | | |
326 | Mod. of Gang Canal | | | BranchCanal | AnyOther | | | 2018-09-28 17:03:36.0 | | |
327 | Mod. of Gang Canal | | | BranchCanal | AnyOther | | | 2018-09-28 17:03:36.0 | | |
328 | Mod. of Gang Canal | | | BranchCanal | AnyOther | | | 2018-09-28 17:03:36.0 | | |
329 | Thoubal | | Thoubal | MainCanal | AnyOther | | | 2018-12-27 12:20:41.0 | | |
330 | Thoubal | | Thoubal | MainCanal | AnyOther | | | 2018-12-27 12:25:30.0 | | |
331 | Upper Indravati (KBK) | | Kalahandi | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-27 12:36:34.0 | | |
332 | NLBC | | Yadgir | Maincanal | Any Other | null | | 2019-03-11 16:38:29.0 | | |
333 | NLBC | | Yadgir | Branch Canal | Structure | Complete | | 2019-03-11 16:41:15.0 | | |
334 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:44:33.0 | | |
335 | NLBC | | Yadgir | Maincanal | Any Other | null | | 2019-03-11 16:57:23.0 | | |
336 | NLBC | | Yadgir | Maincanal | Any Other | null | | 2019-03-11 16:57:31.0 | | |
337 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:45:00.0 | | |
338 | Champamati | Assam | Gandhinagar | Other | HeadWorks | null | | 2019-06-28 14:51:31.0 | | |
339 | Durgawati | | Kaimur (Bhabua) | MainCanal | Maincanal | Complete | | 2018-12-13 17:10:59.0 | | |
340 | Gosikhurd (NP) | | Bhandara | Distributaries | Maincanal | Ongoing | | 2018-10-12 11:00:23.0 | | |
341 | NLBC | | Yadgir | BranchCanal | Maincanal | Complete | | 2018-11-08 16:13:23.0 | | |
342 | NLBC | | Yadgir | Distributaries | Structure | Complete | | 2019-03-11 17:07:11.0 | | |
343 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | for testing | 2019-06-28 14:53:43.0 | | |
344 | Sardar Sarovar | Gujarat | Gandhinagar | Maincanal | Main Canal | Complete | sample photo | 2019-06-28 15:46:56.0 | | |
345 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | subminor 3 of khasidi Dy | 2019-06-28 10:38:11.0 | | |
346 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | subminor 3 | 2019-06-28 10:38:12.0 | | |
347 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Maincanal | Structure | OnGoing | Aquaduct | 2019-06-28 16:13:13.0 | | |
348 | Upper Indravati (KBK) | | Kalahandi | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-27 11:12:15.0 | | |
349 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | HeadWorks | Dam | OnGoing | Spillway | 2019-06-29 12:41:57.0 | | |
350 | Champamati | Assam | Gandhinagar | Other | HeadWorks | null | | 2019-06-28 14:54:50.0 | | |
351 | Lower Panzara | | | Maincanal | Structure | Complete | | 2019-07-07 09:44:44.0 | | |
352 | Lower Panzara | | | Maincanal | Structure | Complete | | 2019-07-07 09:44:47.0 | | |
353 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:49:57.0 | | |
354 | Mod. of Gang Canal | Rajasthan | Ganganagar | Any Other | Minors/ Sub-Minors | null | T minor | 2019-07-17 10:20:40.0 | | |
355 | Mod. of Gang Canal | Rajasthan | Ganganagar | Minors/ Sub-Minors | Any Other | | T Chak | 2019-07-17 10:45:29.0 | | |
356 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | Complete | 30 H | 2019-07-17 12:49:30.0 | | |
357 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | Complete | 29 PS(A) | 2019-07-17 16:37:40.0 | | |
358 | Sardar Sarovar | Gujarat | Gandhinagar | Structure | Maincanal | Complete | | 2019-06-28 14:38:14.0 | | |
359 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | for testing | 2019-06-28 14:52:13.0 | | |
360 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Maincanal | Structure | OnGoing | aquaduct | 2019-06-28 16:13:13.0 | | |
361 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | HeadWorks | Barrage | Complete | | 2019-06-28 16:26:03.0 | | |
362 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Maincanal | Main Canal | Complete | GRMC | 2019-06-28 16:26:54.0 | | |
363 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Maincanal | Main Canal | Complete | GRMC | 2019-06-28 17:01:45.0 | | |
364 | Subernarekha Multipurpose | Jharkhand | Saraikela-Kharsawan | Maincanal | Main Canal | Complete | Guari Canal | 2019-06-29 12:43:55.0 | | |
365 | | | Nawada | | Branch Canal | OnGoing | 12345 | 2019-07-25 16:14:09.0 | | |
366 | Sri Komarambheem | Telangana | Adilabad | HeadWorks | Dam | Complete | | 2019-08-29 13:34:59.0 | | |
367 | Kanupur | Odisha | Kendujhar | HeadWorks | Dam | OnGoing | Delayed progress | 2019-08-31 18:17:51.0 | | |
368 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | Electrical Pole shifting done, work completed upto 80% | 2019-11-26 15:17:31.0 | | |
369 | Nandur Madhmeshwar Ph. II | Maharashtra | Sindhudurg | HeadWorks | Dam | OnGoing | | 2019-12-05 14:39:39.0 | | |
370 | Durgawati | | Rohtas | Headworks | Dam | Complete | | 2018-12-13 16:32:44.0 | | |
371 | Gosikhurd (NP) | | Bhandara | Headworks | Dam | null | | 2018-10-16 18:07:51.0 | | |
372 | Bargi Diversion Projrct Ph- II (Km. 63 to Km. 104) | | Jabalpur | Distributaries | Structure | Complete | | 2018-12-17 11:11:23.0 | | |
373 | Champamati | | Kokrajhar | Branch Canal | Branch Canal | Complete | RBC3 | 2019-05-11 14:20:49.0 | | |
374 | Gosikhurd (NP) | | Chandrapur | MainCanal | Structure | Complete | | 2018-10-12 12:22:41.0 | | |
375 | Gundlakamma | Andhra Pradesh | Prakasam | Structure | Branch Canal | Complete | Offtake | 2019-11-18 12:38:06.0 | | |
376 | Karanja | Karnataka | Bidar | Structure | Distributaries | Complete | Lining work is in progress | 2019-12-23 11:53:33.0 | | |
377 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | down stream at Railway crossing on atiwal lift | 2019-12-23 13:28:53.0 | | |
378 | Kelo | | Raigarh | MainCanal | Maincanal | Complete | | 2018-12-20 16:16:41.0 | | |
379 | Kelo | | Raigarh | Distributaries | Maincanal | Complete | | 2018-12-20 16:40:20.0 | | |
380 | Kelo | | Raigarh | MainCanal | Structure | Complete | | 2018-12-21 09:50:23.0 | | |
381 | Waghur Project | | Jalgaon | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2019-05-09 11:28:39.0 | | |
382 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | OnGoing | | 2019-08-28 19:02:33.0 | | |
383 | Mod. of Gang Canal | | | BranchCanal | AnyOther | | | 2018-09-28 17:03:36.0 | | |
384 | Mod. of Gang Canal | | | MainCanal | Structure | Complete | | 2018-09-28 17:03:36.0 | | |
385 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | Complete | 29 PS(A) | 2019-07-17 16:39:21.0 | | |
386 | Mod. of Gang Canal | | | MainCanal | Structure | Complete | | 2018-09-28 17:03:36.0 | | |
387 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | Complete | 30 H | 2019-07-17 12:50:40.0 | | |
388 | Sardar Sarovar | | Kachchh | BranchCanal | Structure | Ongoing | | 2018-12-05 09:59:10.0 | | |
389 | Sardar Sarovar | | Patan | Minors_Sub_Minors | Outlet | Complete | | 2018-12-06 13:20:21.0 | | |
390 | Sri Komarambheem | Telangana | Adilabad | Structure | Maincanal | Complete | | 2019-08-29 14:30:43.0 | | |
391 | Kelo | | Raigarh | Headworks | Dam | Complete | | 2018-12-21 10:00:39.0 | | |
392 | Upper Tunga | | Haveri | Maincanal | Structure | OnGoing | | 2019-03-14 11:11:57.0 | | |
393 | Sri Rameshwar Irrigation | | Belgaum | HeadWorks | Other | null | | 2019-03-13 11:07:54.0 | | |
394 | Sri Rameshwar Irrigation | | Belgaum | HeadWorks | Other | null | | 2019-03-13 11:08:14.0 | | |
395 | Sri Rameshwar Irrigation | | Belgaum | HeadWorks | Other | null | | 2019-03-13 11:10:28.0 | | |
396 | Sri Rameshwar Irrigation | | Belgaum | HeadWorks | Other | null | | 2019-03-13 11:10:31.0 | | |
397 | Upper Tunga | | Haveri | Maincanal | Structure | OnGoing | | 2019-03-14 11:02:30.0 | | |
398 | Borolia | Assam | Nawada | Dam | HeadWorks | Complete | test | 2019-07-26 17:25:29.0 | | |
399 | Kelo | | Raigarh | MainCanal | Structure | null | | 2018-12-21 09:51:59.0 | | |
400 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:50:12.0 | | |
401 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 13:51:10.0 | | |
402 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | Complete | 83 RB | 2019-07-17 18:09:26.0 | | |
403 | Musuramilli | | East Godavari | Distributaries | Structure | Complete | | 2018-12-05 13:32:31.0 | | |
404 | Musuramilli | | East Godavari | Distributaries | Structure | Complete | | 2018-12-05 13:32:32.0 | | |
405 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | Complete | 30 H | 2019-07-17 12:50:42.0 | | |
406 | Nandur Madhmeshwar Ph. II | | | null | Outlet | OnGoing | | 2019-07-07 09:45:36.0 | | |
407 | Palemvagu | | Khammam | Distributaries | Distributaries | OnGoing | | 2019-05-04 14:45:49.0 | | |
408 | Palemvagu | Telangana | Khammam | Distributaries | Distributaries | OnGoing | D14 | 2019-07-29 10:38:44.0 | | |
409 | Borolia | Assam | Gandhinagar | Main Canal | Maincanal | Complete | | 2019-06-28 14:38:39.0 | | |
410 | Sardar Sarovar | | Patan | Minors_Sub_Minors | Outlet | null | | 2018-12-06 13:11:40.0 | | |
411 | Sri Rameshwar Irrigation | | Belgaum | Distributaries | Any Other | null | | 2019-03-13 13:26:20.0 | | |
412 | Thoubal | | Thoubal | BranchCanal | AnyOther | | | 2018-12-27 10:29:48.0 | | |
413 | Thoubal | | Thoubal | MainCanal | AnyOther | | | 2018-12-27 10:23:37.0 | | |
414 | Thoubal | | Thoubal | MainCanal | AnyOther | | | 2018-12-27 10:32:07.0 | | |
415 | Thoubal | | Thoubal | MainCanal | AnyOther | | | 2018-12-27 10:41:53.0 | | |
416 | Upper Indravati (KBK) | | Kalahandi | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-27 10:23:10.0 | | |
417 | Upper Indravati (KBK) | | Kalahandi | MainCanal | Maincanal | Complete | | 2018-12-27 13:08:28.0 | | |
418 | Upper Indravati (KBK) | | Kalahandi | Distributaries | Structure | Complete | | 2018-12-27 13:10:55.0 | | |
419 | Palemvagu | Telangana | Khammam | Distributaries | Distributaries | OnGoing | D15 | 2019-07-29 10:38:45.0 | | |
420 | Tadipudi LIS | Andhra Pradesh | West Godavari | Other | HeadWorks | null | | 2019-09-06 11:19:59.0 | | |
421 | Upper Indravati (KBK) | | Kalahandi | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-27 12:43:17.0 | | |
422 | Upper Indravati (KBK) | | Kalahandi | Distributaries | Maincanal | Complete | | 2018-12-27 13:11:52.0 | | |
423 | Waghur Project | | Jalgaon | HeadWorks | Other | null | | 2019-05-09 10:27:43.0 | | |
424 | Upper Tunga | | Haveri | Maincanal | Structure | OnGoing | | 2019-03-14 11:09:43.0 | | |
425 | Dolaithabi Barrage | | Imphal East | MainCanal | AnyOther | | | 2018-12-27 16:38:47.0 | | |
426 | Int. Anandapur Barrage Ph. I | Odisha | Baleshwar | Maincanal | Main Canal | Complete | | 2019-08-29 09:41:11.0 | | |
427 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Main Canal | OnGoing | | 2019-08-29 13:49:57.0 | | |
428 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | Complete | 20 FF | 2019-07-17 14:16:15.0 | | |
429 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | Complete | 83 RB | 2019-07-17 18:11:12.0 | | |
430 | Nandur Madhmeshwar Ph. II | | | null | Outlet | OnGoing | | 2019-07-07 09:45:38.0 | | |
431 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | RD4.050Km approach canal to rmc | 2019-11-22 12:09:41.0 | | |
432 | Sardar Sarovar | Gujarat | Gandhinagar | Structure | Maincanal | Complete | | 2019-06-28 14:39:07.0 | | |
433 | Sri Komarambheem | Telangana | Adilabad | Structure | Maincanal | Complete | | 2019-08-29 14:33:08.0 | | |
434 | Thoubal | | Thoubal | MainCanal | AnyOther | | | 2018-12-27 10:46:37.0 | | |
435 | Thoubal | | Thoubal | MainCanal | AnyOther | | | 2018-12-27 13:33:19.0 | | |
436 | Upper Indravati (KBK) | | Kalahandi | MainCanal | Maincanal | Complete | | 2018-12-27 10:45:45.0 | | |
437 | Upper Indravati (KBK) | | Kalahandi | Distributaries | Maincanal | Complete | | 2018-12-27 10:48:34.0 | | |
438 | Upper Indravati (KBK) | | Kalahandi | MainCanal | Maincanal | Complete | | 2018-12-27 10:54:08.0 | | |
439 | Upper Indravati (KBK) | | Kalahandi | Distributaries | Maincanal | Complete | | 2018-12-27 10:55:32.0 | | |
440 | Sardar Sarovar | Gujarat | Nawada | HeadWorks | Barrage | Yet To Be Completed | 333 | 2019-07-26 17:26:46.0 | | |
441 | Upper Tunga | | Haveri | Maincanal | Structure | OnGoing | | 2019-03-14 12:34:12.0 | | |
442 | Upper Tunga | | Haveri | Maincanal | Structure | Yet To Be Completed | | 2019-03-14 12:35:24.0 | | |
443 | Upper Tunga | | Haveri | Maincanal | Structure | OnGoing | | 2019-03-14 12:36:37.0 | | |
444 | Upper Tunga | | Haveri | Minors/ Sub-Minors | Any Other | null | | 2019-03-14 16:22:04.0 | | |
445 | Dolaithabi Barrage | | Imphal East | MainCanal | Maincanal | Ongoing | | 2018-11-21 02:56:42.0 | | |
446 | Mahuar Project | Madhya Pradesh | Shivpuri | HeadWorks | Dam | Complete | located at shivpuri district | 2019-07-27 12:01:54.0 | | |
447 | Sindh Project Ph - II | Madhya Pradesh | Shivpuri | Other | HeadWorks | null | capacity of 100 mcm | 2019-07-29 11:01:17.0 | | |
448 | Upper Tunga | | Haveri | Minors/ Sub-Minors | Any Other | null | | 2019-03-14 16:26:31.0 | | |
449 | Upper Tunga | | Haveri | Maincanal | Structure | OnGoing | | 2019-03-14 11:15:22.0 | | |
450 | Champamati | | Kokrajhar | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | Micro lift irrigation | 2019-05-11 14:39:34.0 | | |
451 | null | | Chandrapur | MainCanal | Maincanal | Ongoing | | 2018-10-17 13:56:56.0 | | |
452 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | Offtake of Shakarpur, Hasanpur, Bagarpur Dys | 2019-08-29 14:49:32.0 | | |
453 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 14:41:16.0 | | |
454 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 14:44:37.0 | | |
455 | Mod. of Gang Canal | | | Minors_Sub_Minors | Outlet | Complete | | 2018-09-28 17:03:36.0 | | |
456 | Nandur Madhmeshwar Ph. II | | | null | Outlet | OnGoing | | 2019-07-07 09:45:42.0 | | |
457 | Palemvagu | | Khammam | Distributaries | Distributaries | OnGoing | | 2019-05-04 14:48:20.0 | | |
458 | Sardar Sarovar | Gujarat | Gandhinagar | Outlet | Maincanal | Complete | | 2019-06-28 14:42:00.0 | | |
459 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | for testing | 2019-06-28 14:58:13.0 | | |
460 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Distributaries | Distributaries | Complete | OR47 | 2019-06-28 12:55:56.0 | | |
461 | Upper Tunga | | Haveri | Maincanal | Structure | OnGoing | | 2019-03-14 11:38:45.0 | | |
462 | Upper Tunga | | Haveri | Maincanal | Critical Issue / Bottleneck | Yet To Be Completed | | 2019-03-14 12:06:55.0 | | |
463 | Upper Tunga | | Haveri | Distributaries | Critical Issue / Bottleneck | OnGoing | | 2019-03-14 12:51:52.0 | | |
464 | Upper Tunga | | Haveri | Minors/ Sub-Minors | Any Other | null | | 2019-03-14 16:25:40.0 | | |
465 | Waghur Project | | Jalgaon | HeadWorks | Other | null | | 2019-05-09 10:29:12.0 | | |
466 | Lower Panzara | | Dhule | HeadWorks | Other | | Gotane | 2019-05-28 13:51:37.0 | | |
467 | Tadipudi LIS | Andhra Pradesh | East Godavari | Other | HeadWorks | null | Pump House with 4 motors | 2019-09-06 11:33:08.0 | | |
468 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | OnGoing | | 2019-11-25 16:54:23.0 | | |
469 | J. Chokka Rao LIS | | Warangal | HeadWorks | Other | null | | 2019-05-03 10:23:16.0 | | |
470 | Subernarekha | Odisha | Mayurbhanj | HeadWorks | Other | | under progress | 2019-07-30 08:49:59.0 | | |
471 | Lower Wardha | Maharashtra | Wardha | Branch Canal | Branch Canal | Complete | | 2019-08-05 11:51:53.0 | | |
472 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-08-05 16:10:07.0 | | |
473 | Indira Sagar Project Canal Ph I & II (Km. 0 to Km. 142) | | West Nimar | null | Outlet | Complete | | 2019-02-26 11:35:08.0 | | |
474 | Indira Sagar Project Canal Ph I & II (Km. 0 to Km. 142) | | West Nimar | null | Outlet | Complete | | 2019-02-26 12:00:42.0 | | |
475 | Kanupur | Odisha | Kendujhar | Maincanal | Structure | OnGoing | Likely to be completed by June 2020 | 2019-08-29 10:51:57.0 | | |
476 | Kelo | | Raigarh | MainCanal | Structure | Ongoing | | 2018-12-21 10:42:32.0 | | |
477 | Kelo | | Raigarh | MainCanal | Maincanal | Complete | | 2018-12-21 11:10:08.0 | | |
478 | Kelo | | Raigarh | MainCanal | Structure | Ongoing | | 2018-12-21 11:28:08.0 | | |
479 | Lower Panzara | | Dhule | Minors/ Sub-Minors | Any Other | null | | 2019-03-06 16:37:56.0 | | |
480 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | VRB at Chandausi Branch Canal | 2019-08-29 16:45:29.0 | | |
481 | Kandi Canal Ext. (Ph. II) | Punjab | South | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | test | 2019-08-02 16:28:50.0 | | |
482 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 14:46:23.0 | | |
483 | Mod. of Gang Canal | | | Minors_Sub_Minors | Outlet | null | | 2018-09-28 17:03:36.0 | | |
484 | Nardave (Mahammadwadi) | Maharashtra | Sindhudurg | Main Canal | Any Other | Complete | | 2019-12-05 14:52:44.0 | | |
485 | Peddavagu @ Neelwai | Telangana | Adilabad | Distributaries | Distributaries | Complete | 6l distributaes | 2019-11-22 12:15:25.0 | | |
486 | Mahan Project | | Chhindwara | BranchCanal | Structure | Ongoing | | 2018-12-13 13:20:16.0 | | |
487 | Champamati | Assam | Gandhinagar | Outlet | Maincanal | Complete | | 2019-06-28 14:42:23.0 | | |
488 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | OR46 | 2019-06-28 13:13:35.0 | | |
489 | Lower Panzara | | Dhule | Maincanal | Any Other | null | | 2019-03-06 19:02:43.0 | | |
490 | Waghur Project | | Jalgaon | null | Outlet | Complete | | 2019-03-08 07:10:10.0 | | |
491 | Waghur Project | | Jalgaon | HeadWorks | Dam | Complete | | 2019-03-07 17:47:27.0 | | |
492 | Waghur Project | | Jalgaon | HeadWorks | Dam | Complete | | 2019-03-11 11:15:19.0 | | |
493 | Waghur Project | | Jalgaon | HeadWorks | Dam | Complete | | 2019-03-11 11:17:13.0 | | |
494 | Waghur Project | | Jalgaon | HeadWorks | Dam | Complete | | 2019-03-11 11:17:15.0 | | |
495 | Tadipudi LIS | Andhra Pradesh | East Godavari | Other | HeadWorks | null | intake from Godavari river | 2019-09-06 11:35:04.0 | | |
496 | Peddavagu @ Neelwai | Telangana | Adilabad | HeadWorks | Other | Complete | | 2019-11-22 12:46:21.0 | | |
497 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | Water stored | 2019-11-26 09:47:15.0 | | |
498 | Sri Rameshwar Irrigation | | Belgaum | HeadWorks | Other | null | | 2019-03-13 11:11:14.0 | | |
499 | Sri Rameshwar Irrigation | | Belgaum | HeadWorks | Other | null | | 2019-03-13 11:16:15.0 | | |
500 | Lower Wardha | Maharashtra | Wardha | Branch Canal | Branch Canal | Complete | | 2019-08-05 11:53:04.0 | | |
501 | Lower Wardha | Maharashtra | Wardha | Outlet | Minors/ Sub-Minors | Complete | | 2019-08-05 16:12:20.0 | | |
502 | Indiramma Flood Flow Canal | | Karimnagar | HeadWorks | Other | null | | 2019-03-11 11:25:49.0 | | |
503 | Kanupur | Odisha | Kendujhar | Maincanal | Main Canal | OnGoing | Aqueduct over Silisuan nallah | 2019-08-29 10:51:59.0 | | |
504 | Lower Panzara | | Dhule | Maincanal | Any Other | null | | 2019-03-06 19:09:54.0 | | |
505 | Maniyari Tank (ERM) | | | Maincanal | Main Canal | OnGoing | | 2019-06-18 14:59:44.0 | | |
506 | NLBC | | Yadgir | Maincanal | Structure | Complete | | 2019-03-11 16:29:17.0 | | |
507 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | OnGoing | | 2019-06-28 14:42:54.0 | | |
508 | Saryu Nahar Pariyojana | Uttar Pradesh | Shrawasti | Main Canal | Main Canal | OnGoing | Rapti link channel | 2019-08-06 11:52:31.0 | | |
509 | Saryu Nahar Pariyojana | Uttar Pradesh | Shrawasti | Main Canal | Main Canal | Complete | rapti main canal | 2019-08-06 16:36:31.0 | | |
510 | Subernarekha | Odisha | Mayurbhanj | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2019-07-30 09:47:00.0 | | |
511 | Lower Wardha | Maharashtra | Wardha | Structure | Branch Canal | Complete | | 2019-08-06 12:55:02.0 | | |
512 | Sri Rameshwar Irrigation | | Belgaum | HeadWorks | Other | null | | 2019-03-13 11:17:02.0 | | |
513 | Upper Tunga | | Haveri | Distributaries | Critical Issue / Bottleneck | OnGoing | | 2019-03-14 12:53:09.0 | | |
514 | Upper Tunga | | Haveri | Distributaries | Critical Issue / Bottleneck | Yet To Be Completed | | 2019-03-14 12:53:42.0 | | |
515 | Upper Tunga | | Haveri | Distributaries | Structure | OnGoing | | 2019-03-14 13:25:43.0 | | |
516 | Borolia | Assam | Lucknow | Dam | HeadWorks | Complete | test app by bisag 13_09_2009 | 2019-09-13 14:45:44.0 | | |
517 | Borolia | Assam | Lucknow | Structure | Main Canal | Complete | test app by bisag | 2019-09-17 14:49:28.0 | | |
518 | Lower Wardha | Maharashtra | Wardha | Any Other | Branch Canal | Complete | | 2019-08-05 11:55:12.0 | | |
519 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-08-05 16:13:56.0 | | |
520 | Saryu Nahar Pariyojana | Uttar Pradesh | Shrawasti | Main Canal | Structure | OnGoing | in progress | 2019-08-06 12:57:15.0 | | |
521 | Tadipudi LIS | Andhra Pradesh | West Godavari | Distributaries | Distributaries | Complete | Distributary 4 | 2019-09-06 12:11:38.0 | | |
522 | Saryu Nahar Pariyojana | Uttar Pradesh | Shrawasti | Minors/ Sub-Minors | Outlet | Complete | Bidhuni minor Basti branch | 2019-08-07 10:14:20.0 | | |
523 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Any Other | Complete | Rapti main canal RD 69.835 km | 2019-08-07 13:42:12.0 | | |
524 | Sindh Project Ph - II | Madhya Pradesh | Gwalior | HeadWorks | Other | | RD 1725m | 2019-07-30 11:31:24.0 | | |
525 | Sri Rameshwar Irrigation | | Belgaum | Maincanal | Structure | Complete | | 2019-03-13 12:23:07.0 | | |
526 | Sri Rameshwar Irrigation | | Belgaum | Maincanal | Any Other | null | | 2019-03-13 12:24:17.0 | | |
527 | Sri Rameshwar Irrigation | | Belgaum | null | Outlet | Complete | | 2019-03-13 12:41:35.0 | | |
528 | Sri Rameshwar Irrigation | | Belgaum | Maincanal | Structure | Complete | | 2019-03-13 13:02:31.0 | | |
529 | Lower Wardha | Maharashtra | Yavatmal | HeadWorks | Other | Complete | | 2019-08-07 13:49:08.0 | | |
530 | Upper Tunga | | Haveri | Minors/ Sub-Minors | Any Other | null | | 2019-03-14 16:20:01.0 | | |
531 | Upper Tunga | | Haveri | Distributaries | Structure | OnGoing | | 2019-03-14 13:26:27.0 | | |
532 | Nardave (Mahammadwadi) | Maharashtra | Sindhudurg | Main Canal | Any Other | Complete | | 2019-12-05 14:53:46.0 | | |
533 | Upper Tunga | | Haveri | Maincanal | Structure | Complete | | 2019-03-14 13:56:30.0 | | |
534 | Bhima LIS | Karnataka | Bijapur | Barrage | HeadWorks | Complete | | 2019-12-24 11:21:34.0 | | |
535 | Bhima LIS | Karnataka | Gulbarga | Other | HeadWorks | Complete | Intake Channel | 2019-12-24 11:56:33.0 | | |
536 | Lower Wardha | Maharashtra | Wardha | Branch Canal | Branch Canal | Complete | vegetation in canal. | 2019-08-05 11:56:32.0 | | |
537 | Lower Wardha | Maharashtra | Wardha | Outlet | Minors/ Sub-Minors | Complete | | 2019-08-05 16:15:32.0 | | |
538 | Lower Wardha | Maharashtra | Yavatmal | Barrage | HeadWorks | OnGoing | | 2019-08-06 13:46:27.0 | | |
539 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2019-11-22 12:47:11.0 | | |
540 | J. Chokka Rao LIS | | Warangal | Maincanal | Any Other | null | | 2019-05-04 09:28:52.0 | | |
541 | J. Chokka Rao LIS | | Warangal | Distributaries | Distributaries | OnGoing | | 2019-05-03 11:25:16.0 | | |
542 | Karanja | Karnataka | Bidar | Structure | Main Canal | OnGoing | work in progress | 2019-12-23 12:04:30.0 | | |
543 | Lower Wardha | Maharashtra | Yavatmal | HeadWorks | Other | Complete | | 2019-08-07 12:28:32.0 | | |
544 | Tadipudi LIS | Andhra Pradesh | West Godavari | Main Canal | Maincanal | Complete | main canal at ch:11.066 | 2019-09-06 12:13:01.0 | | |
545 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Maincanal | Main Canal | Complete | RD8.0KM | 2019-09-24 12:47:20.0 | | |
546 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | testing | 2019-06-28 14:43:57.0 | | |
547 | Sardar Sarovar | | Kachchh | BranchCanal | Structure | Ongoing | | 2018-12-05 10:22:16.0 | | |
548 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Structure | OnGoing | on Rapti main canal | 2019-08-07 14:08:35.0 | | |
549 | Sindh Project Ph - II | Madhya Pradesh | Gwalior | Main Canal | Maincanal | Complete | completed by 2016 | 2019-07-30 11:38:28.0 | | |
550 | Sardar Sarovar | Gujarat | Lucknow | HeadWorks | Barrage | Complete | test app by bisag offline 13_09_2009 | 2019-09-13 14:47:12.0 | | |
551 | Borolia | Assam | Lucknow | Main Canal | Main Canal | Complete | test app by bisag | 2019-09-17 14:55:41.0 | | |
552 | Peddavagu @ Neelwai | Telangana | Adilabad | HeadWorks | Dam | Complete | | 2019-11-22 12:48:15.0 | | |
553 | Waghur Project | | Jalgaon | Maincanal | Main Canal | Complete | | 2019-05-09 12:17:34.0 | | |
554 | Dolaithabi Barrage | | Imphal East | MainCanal | Maincanal | Ongoing | | 2018-11-21 02:59:01.0 | | |
555 | Borolia | Assam | Lucknow | Main Canal | Main Canal | Complete | 12 | 2019-09-17 14:59:37.0 | | |
556 | Durgawati | | Rohtas | Distributaries | Maincanal | Complete | | 2018-12-13 11:36:47.0 | | |
557 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-08-05 12:33:01.0 | | |
558 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | pimpalgaon minor | 2019-08-05 16:34:43.0 | | |
559 | Lower Wardha | Maharashtra | Yavatmal | Barrage | HeadWorks | OnGoing | | 2019-08-06 13:46:48.0 | | |
560 | Champamati | | Chirang | Branch Canal | Branch Canal | Complete | | 2019-05-11 11:46:27.0 | | |
561 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-12 12:59:23.0 | | |
562 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-12 15:20:44.0 | | |
563 | Indiramma Flood Flow Canal | | Karimnagar | Distributaries | Distributaries | Complete | | 2019-05-03 11:26:25.0 | | |
564 | J. Chokka Rao LIS | | Warangal | Distributaries | Distributaries | OnGoing | | 2019-05-03 11:26:09.0 | | |
565 | Indiramma Flood Flow Canal | | Karimnagar | Distributaries | Distributaries | Complete | | 2019-05-03 11:26:28.0 | | |
566 | Musuramilli | | East Godavari | MainCanal | Maincanal | Complete | | 2018-12-05 13:00:16.0 | | |
567 | Palemvagu | | Khammam | Distributaries | Distributaries | OnGoing | | 2019-05-04 14:29:15.0 | | |
568 | Tadipudi LIS | Andhra Pradesh | West Godavari | Other | HeadWorks | null | Pump House | 2019-09-06 12:29:14.0 | | |
569 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Any Other | Maincanal | null | 0.435Km | 2019-09-24 12:49:42.0 | | |
570 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | For testing | 2019-06-28 14:44:31.0 | | |
571 | Sindh Project Ph - II | Madhya Pradesh | Gwalior | Maincanal | Main Canal | Complete | jorasi tunnel | 2019-07-30 13:59:07.0 | | |
572 | Tillari (MH) | Maharashtra | Sindhudurg | Branch Canal | Branch Canal | OnGoing | the patch work of 1 km under km 30.0 of banda branch canal, is to be completed by may 20 as per tender condition | 2019-12-06 12:42:59.0 | | |
573 | Tillari (MH) | Maharashtra | Sindhudurg | Structure | Branch Canal | OnGoing | | 2019-12-06 13:57:00.0 | | |
574 | Gundlakamma | | Prakasam | HeadWorks | Dam | Complete | | 2019-05-30 09:27:07.0 | | |
575 | Nandur Madhmeshwar Ph. II | | Nashik | HeadWorks | Dam | Complete | Bham Dam | 2019-05-31 10:23:05.0 | | |
576 | Sindh Project Ph - II | Madhya Pradesh | Gwalior | Branch Canal | Branch Canal | Complete | udaipura branch canal of 14.951 km length | 2019-07-30 14:02:17.0 | | |
577 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-08-05 12:34:09.0 | | |
578 | Gosikhurd (NP) | | Bhandara | MainCanal | AnyOther | | | 2018-10-11 10:53:42.0 | | |
579 | Gosikhurd (NP) | | Bhandara | MainCanal | Maincanal | Ongoing | | 2018-10-11 11:25:46.0 | | |
580 | Gosikhurd (NP) | | Bhandara | MainCanal | Maincanal | Complete | | 2018-10-11 12:22:10.0 | | |
581 | Gosikhurd (NP) | | Bhandara | MainCanal | Maincanal | Ongoing | | 2018-10-11 10:42:47.0 | | |
582 | Gundlakamma | | Prakasam | Maincanal | Main Canal | Complete | left canal | 2019-05-30 09:00:53.0 | | |
583 | Gundlakamma | | Prakasam | HeadWorks | Dam | Complete | RD0.1 | 2019-05-30 10:46:27.0 | | |
584 | Aruna Project | | Dhule | Distributaries | Outlet | Complete | CADWM Field Channel | 2019-05-28 11:05:46.0 | | |
585 | Aruna Project | | Dhule | Distributaries | Outlet | Complete | FYI, OR 3 | 2019-05-28 11:33:13.0 | | |
586 | Aruna Project | | Dhule | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | CADWM works | 2019-05-28 11:36:51.0 | | |
587 | Aruna Project | | Dhule | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | LBC Command | 2019-05-28 12:09:44.0 | | |
588 | Nandur Madhmeshwar Ph. II | | Aurangabad | Minors/ Sub-Minors | Structure | OnGoing | | 2019-05-30 14:01:03.0 | | |
589 | Nandur Madhmeshwar Ph. II | | Aurangabad | Minors/ Sub-Minors | Structure | OnGoing | | 2019-05-30 14:03:08.0 | | |
590 | Nandur Madhmeshwar Ph. II | | Aurangabad | Minors/ Sub-Minors | Structure | OnGoing | | 2019-05-30 11:27:24.0 | | |
591 | Nandur Madhmeshwar Ph. II | | Aurangabad | Minors/ Sub-Minors | Structure | OnGoing | | 2019-05-30 11:27:24.0 | | |
592 | Nandur Madhmeshwar Ph. II | | Aurangabad | Minors/ Sub-Minors | Outlet | OnGoing | | 2019-05-30 11:35:00.0 | | |
593 | Nandur Madhmeshwar Ph. II | | Aurangabad | Minors/ Sub-Minors | Outlet | OnGoing | | 2019-05-30 12:09:58.0 | | |
594 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | workshop | 2019-06-28 14:45:12.0 | | |
595 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | pimpalgaon minor | 2019-08-05 16:36:10.0 | | |
596 | Lower Wardha | Maharashtra | Yavatmal | Barrage | HeadWorks | OnGoing | | 2019-08-06 13:47:15.0 | | |
597 | Lower Wardha | Maharashtra | Yavatmal | Other | HeadWorks | Complete | | 2019-08-07 14:42:15.0 | | |
598 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Any Other | Maincanal | null | 0.435Km | 2019-09-24 12:50:19.0 | | |
599 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | Filled upto FRL 578 | 2019-11-26 09:53:33.0 | | |
600 | | | Lucknow | | Dam | Complete | test app by dipak kobiya | 2019-09-17 15:11:38.0 | | |
601 | Bhima LIS | Karnataka | Bijapur | Barrage | HeadWorks | Complete | | 2019-12-24 11:25:18.0 | | |
602 | Bhima LIS | Karnataka | Gulbarga | Other | HeadWorks | Complete | | 2019-12-24 11:57:54.0 | | |
603 | Bhima LIS | Karnataka | Gulbarga | Other | HeadWorks | Complete | 109 cusec, 2 Pump working and 1 stand by | 2019-12-24 12:32:55.0 | | |
604 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-08-05 12:34:37.0 | | |
605 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | Narayanpur | 2019-08-05 16:56:25.0 | | |
606 | Lower Panzara | | Dhule | Maincanal | Main Canal | Complete | RBMC | 2019-05-30 11:16:25.0 | | |
607 | Lower Panzara | | Dhule | Maincanal | Any Other | | | 2019-05-30 11:16:26.0 | | |
608 | Lower Panzara | | Dhule | Maincanal | Outlet | Complete | Dy 6 on RBMC | 2019-05-30 11:16:26.0 | | |
609 | Lower Wardha | Maharashtra | Yavatmal | Barrage | HeadWorks | OnGoing | | 2019-08-06 13:49:36.0 | | |
610 | Karanja | Karnataka | Bidar | Structure | Main Canal | OnGoing | work in progress | 2019-12-23 12:05:46.0 | | |
611 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | Yet To Be Completed | forest department land problem | 2019-11-22 13:01:34.0 | | |
612 | Tadipudi LIS | Andhra Pradesh | West Godavari | Other | HeadWorks | null | Pump House | 2019-09-06 12:30:49.0 | | |
613 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | workshop | 2019-06-28 14:45:13.0 | | |
614 | Sindh Project Ph - II | Madhya Pradesh | Gwalior | Distributaries | Distributaries | Complete | 17.21 km distributary from udaipura branch canal | 2019-07-30 14:36:26.0 | | |
615 | Tillari (MH) | Maharashtra | Sindhudurg | Branch Canal | Branch Canal | Yet To Be Completed | PDN location of banda branch canal from 44.00 to 57.00 km,. Agency is final plot marking work by agency is in progress | 2019-12-06 14:18:37.0 | | |
616 | Tillari (MH) | Maharashtra | North Goa | Branch Canal | Structure | Yet To Be Completed | | 2019-12-09 12:54:52.0 | | |
617 | Lower Wardha | Maharashtra | Yavatmal | Other | HeadWorks | Complete | | 2019-08-07 14:43:13.0 | | |
618 | Upper Penganga | Maharashtra | Nanded | Branch Canal | Branch Canal | OnGoing | work is in progress, Crossing SH 44, Dharmabad | 2019-10-14 15:26:48.0 | | |
619 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Other | HeadWorks | null | Beema lift 2 stage 1 at Thirumalayapu | 2019-09-24 17:04:40.0 | | |
620 | Upper Penganga | Maharashtra | Nanded | Branch Canal | Branch Canal | Complete | DOL 1,FC 4, Dharmabad Branch Canal CADWM WORKS, | 2019-10-15 10:03:43.0 | | |
621 | Gosikhurd (NP) | Maharashtra | Bhandara | Dam | HeadWorks | Complete | | 2019-10-10 15:05:29.0 | | |
622 | Gundlakamma | Andhra Pradesh | Prakasam | Dam | HeadWorks | Complete | | 2019-11-18 11:07:44.0 | | |
623 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | Water stored upto FRL 578 | 2019-11-26 09:55:11.0 | | |
624 | Champamati | | Chirang | Branch Canal | Branch Canal | Complete | Left Branch Canal | 2019-05-11 12:32:46.0 | | |
625 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | sonegaon | 2019-08-05 12:41:11.0 | | |
626 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | Narayanpur | 2019-08-05 16:56:57.0 | | |
627 | Lower Wardha | Maharashtra | Wardha | Barrage | HeadWorks | OnGoing | | 2019-08-06 14:02:24.0 | | |
628 | Lower Wardha | Maharashtra | Yavatmal | Other | HeadWorks | Complete | water tank, samaj mandir | 2019-08-07 14:47:48.0 | | |
629 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | Complete | Rd 4.5km | 2019-11-22 13:02:47.0 | | |
630 | Tadipudi LIS | Andhra Pradesh | West Godavari | Other | HeadWorks | null | Pump House cum intake channel | 2019-09-06 12:33:28.0 | | |
631 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Any Other | Maincanal | null | 0.45km | 2019-09-24 12:54:23.0 | | |
632 | Sardar Sarovar | Gujarat | Gandhinagar | Maincanal | Main Canal | Complete | For Offline testing | 2019-06-28 14:47:05.0 | | |
633 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Structure | OnGoing | Rapti Main canal | 2019-08-07 16:13:19.0 | | |
634 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Main Canal | Structure | OnGoing | Rapti main canal | 2019-08-07 17:57:59.0 | | |
635 | Subernarekha | Odisha | Mayurbhanj | Minors/ Sub-Minors | Structure | Complete | escape channel outfalls to a local MIP tank( phulajharitank) | 2019-07-30 14:46:46.0 | | |
636 | Tillari (MH) | Maharashtra | Sindhudurg | Outlet | Minors/ Sub-Minors | Complete | | 2019-12-06 16:19:59.0 | | |
637 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2019-08-08 18:10:59.0 | | |
638 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | Complete | | 2019-08-09 13:13:14.0 | | |
639 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2019-08-09 14:54:38.0 | | |
640 | Lower Pedhi | Maharashtra | Amravati | Other | HeadWorks | OnGoing | | 2019-08-09 15:09:11.0 | | |
641 | Dolaithabi Barrage | Manipur | Imphal East | Maincanal | Main Canal | Complete | water transmission system | 2019-08-27 11:16:10.0 | | |
642 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Other | HeadWorks | null | Beema lift 2 stage 1 at Thirumalayapu | 2019-09-24 17:05:25.0 | | |
643 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | Complete | | 2019-08-09 13:14:33.0 | | |
644 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | incomplete | 2019-10-09 15:15:43.0 | | |
645 | Gosikhurd (NP) | Maharashtra | Bhandara | Dam | HeadWorks | Complete | | 2019-10-10 15:07:26.0 | | |
646 | Gundlakamma | Andhra Pradesh | Prakasam | Dam | HeadWorks | Complete | Gates | 2019-11-18 11:08:42.0 | | |
647 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | null | 228.640 | 2019-06-28 14:47:12.0 | | |
648 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | sonegaon | 2019-08-05 12:42:01.0 | | |
649 | Lower Wardha | Maharashtra | Wardha | Outlet | Minors/ Sub-Minors | Complete | | 2019-08-05 17:03:52.0 | | |
650 | Bembla | Maharashtra | Yavatmal | Dam | HeadWorks | Complete | gram panchyat karyalay | 2019-08-07 15:42:11.0 | | |
651 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | downstream | 2019-08-08 18:14:52.0 | | |
652 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | Complete | | 2019-08-09 13:13:52.0 | | |
653 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2019-08-09 14:55:16.0 | | |
654 | Lower Pedhi | Maharashtra | Amravati | Other | HeadWorks | OnGoing | | 2019-08-09 15:09:41.0 | | |
655 | Champamati | | Kokrajhar | Branch Canal | Branch Canal | Complete | SRBC | 2019-05-11 13:17:45.0 | | |
656 | Dolaithabi Barrage | Manipur | Senapati | Distributaries | Distributaries | Complete | | 2019-08-26 11:19:52.0 | | |
657 | Tadipudi LIS | Andhra Pradesh | West Godavari | Maincanal | Main Canal | Complete | Sublift 3 | 2019-09-06 14:35:28.0 | | |
658 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Any Other | Maincanal | null | super passage RD 2.2km | 2019-09-24 13:15:42.0 | | |
659 | Subernarekha | Odisha | Mayurbhanj | Maincanal | Main Canal | Complete | | 2019-07-30 14:46:53.0 | | |
660 | Thoubal | Manipur | Imphal East | Main Canal | Maincanal | Complete | | 2019-08-27 15:03:06.0 | | |
661 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Dam | HeadWorks | OnGoing | | 2019-09-24 14:20:37.0 | | |
662 | Thoubal | Manipur | Imphal East | Main Canal | Maincanal | Complete | | 2019-08-27 15:06:30.0 | | |
663 | Gundlakamma | Andhra Pradesh | Prakasam | Dam | HeadWorks | Complete | Intake Well for Drinking Water | 2019-11-18 11:10:55.0 | | |
664 | Thoubal | Manipur | Imphal East | Distributaries | Distributaries | Complete | | 2019-08-27 15:08:55.0 | | |
665 | Tillari (MH) | Maharashtra | North Goa | Outlet | Branch Canal | Yet To Be Completed | NOC FROM NHAI IS PENDING PENDING | 2019-12-09 12:57:18.0 | | |
666 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | sonegaon | 2019-08-05 12:43:15.0 | | |
667 | Bembla | Maharashtra | Yavatmal | Dam | HeadWorks | Complete | water tank | 2019-08-07 15:42:47.0 | | |
668 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | downstream | 2019-08-08 18:16:05.0 | | |
669 | Lower Pedhi | Maharashtra | Amravati | Other | HeadWorks | OnGoing | | 2019-08-09 15:10:26.0 | | |
670 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | outlet | 2019-08-07 18:22:29.0 | | |
671 | Dolaithabi Barrage | Manipur | Senapati | Distributaries | Distributaries | Complete | | 2019-08-26 11:20:03.0 | | |
672 | Dolaithabi Barrage | Manipur | Imphal East | Branch Canal | Branch Canal | Complete | | 2019-08-26 11:54:18.0 | | |
673 | Gosikhurd (NP) | Maharashtra | Chandrapur | Structure | Branch Canal | OnGoing | | 2019-10-09 16:52:04.0 | | |
674 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | khamgaon | 2019-08-05 17:24:54.0 | | |
675 | Palemvagu | Telangana | Khammam | Distributaries | Distributaries | OnGoing | | 2019-11-16 12:42:23.0 | | |
676 | Tadipudi LIS | Andhra Pradesh | West Godavari | Maincanal | Structure | Complete | regulator to sublift 3 | 2019-09-06 14:35:31.0 | | |
677 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Main Canal | Maincanal | Complete | cross regulator | 2019-09-24 17:17:58.0 | | |
678 | Sardar Sarovar | Gujarat | Gandhinagar | Maincanal | Main Canal | OnGoing | | 2019-06-28 14:47:58.0 | | |
679 | Dolaithabi Barrage | Manipur | Imphal East | Maincanal | Main Canal | Complete | | 2019-08-27 11:16:22.0 | | |
680 | Thoubal | Manipur | Imphal East | Maincanal | Main Canal | Complete | tunnel 2 water transmission system | 2019-08-27 11:17:43.0 | | |
681 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Dam | HeadWorks | OnGoing | | 2019-09-24 17:36:12.0 | | |
682 | Gundlakamma | Andhra Pradesh | Prakasam | Dam | HeadWorks | Complete | Down stream side if reservoir | 2019-11-18 11:13:20.0 | | |
683 | Yerracalva | Andhra Pradesh | West Godavari | Main Canal | Maincanal | Complete | Hydraulic Particulars | 2019-11-29 11:43:45.0 | | |
684 | Thoubal | Manipur | Senapati | Maincanal | Main Canal | Complete | water transmission system | 2019-08-27 11:17:48.0 | | |
685 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Barrage | HeadWorks | OnGoing | | 2019-12-16 12:51:41.0 | | |
686 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-08-05 12:46:03.0 | | |
687 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | downstream | 2019-08-08 18:16:49.0 | | |
688 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2019-08-09 13:24:10.0 | | |
689 | Lower Pedhi | Maharashtra | Amravati | Other | HeadWorks | OnGoing | | 2019-08-09 15:11:03.0 | | |
690 | Dolaithabi Barrage | Manipur | Imphal East | Barrage | HeadWorks | Complete | | 2019-08-26 12:47:04.0 | | |
691 | Tadipudi LIS | Andhra Pradesh | West Godavari | Distributaries | Distributaries | Yet To Be Completed | Land Aquistion | 2019-09-06 14:45:23.0 | | |
692 | Gosikhurd (NP) | Maharashtra | Chandrapur | Structure | Branch Canal | OnGoing | | 2019-10-09 16:54:27.0 | | |
693 | Lower Wardha | Maharashtra | Wardha | Distributaries | Distributaries | Complete | Khamgaon | 2019-08-05 17:27:15.0 | | |
694 | Bembla | Maharashtra | Yavatmal | Structure | Minors/ Sub-Minors | Complete | outlet | 2019-08-07 18:31:53.0 | | |
695 | Tadipudi LIS | Andhra Pradesh | West Godavari | Main Canal | Maincanal | Complete | Main canal Road crossing | 2019-09-06 14:54:36.0 | | |
696 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | for testing | 2019-06-28 14:48:37.0 | | |
697 | Thoubal | Manipur | Thoubal | Distributaries | Distributaries | Complete | field channel to crops | 2019-08-27 16:32:29.0 | | |
698 | Tillari (MH) | Maharashtra | North Goa | Outlet | Branch Canal | OnGoing | | 2019-12-09 15:31:56.0 | | |
699 | Tillari (MH) | Maharashtra | North Goa | Structure | Main Canal | OnGoing | | 2019-12-09 16:27:46.0 | | |
700 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Dam | HeadWorks | OnGoing | | 2019-09-24 17:37:13.0 | | |
701 | Gundlakamma | Andhra Pradesh | Prakasam | Dam | HeadWorks | Complete | Upstream of reservoir | 2019-11-18 11:14:56.0 | | |
702 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Barrage | HeadWorks | OnGoing | | 2019-12-16 12:52:25.0 | | |
703 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-08-05 12:47:08.0 | | |
704 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | downstream | 2019-08-08 18:25:51.0 | | |
705 | Lower Pedhi | Maharashtra | Amravati | HeadWorks | Dam | Complete | | 2019-08-09 13:59:04.0 | | |
706 | Dolaithabi Barrage | Manipur | Imphal East | Barrage | HeadWorks | Complete | | 2019-08-26 12:51:44.0 | | |
707 | Thoubal | Manipur | Senapati | HeadWorks | Dam | Complete | | 2019-08-27 11:22:47.0 | | |
708 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Other | HeadWorks | null | under progress | 2019-09-24 17:50:42.0 | | |
709 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | outlet | 2019-08-07 18:35:20.0 | | |
710 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | Ongoing aqueduct work | 2019-10-09 17:23:34.0 | | |
711 | Gundlakamma | Andhra Pradesh | Prakasam | Main Canal | Maincanal | null | Head Regulator | 2019-11-18 11:32:17.0 | | |
712 | Aruna Project | | Dhule | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | CADWM works | 2019-05-28 11:43:14.0 | | |
713 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | khamgaon minor | 2019-08-05 17:36:42.0 | | |
714 | Sardar Sarovar | Gujarat | Gandhinagar | Maincanal | Main Canal | Complete | for offline testing | 2019-06-28 14:50:19.0 | | |
715 | Thoubal | Manipur | Thoubal | Distributaries | Distributaries | Complete | field channel | 2019-08-27 16:51:32.0 | | |
716 | Tillari (MH) | Maharashtra | North Goa | Outlet | Branch Canal | OnGoing | | 2019-12-09 15:36:35.0 | | |
717 | Bhima LIS | Karnataka | Gulbarga | Structure | Main Canal | Complete | Offtake point of D1 & D2 in Allagi Main Canal | 2019-12-24 13:10:05.0 | | |
718 | Tillari (MH) | Maharashtra | North Goa | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | thivim minor offtake from 23.3km of LBMC. it covers around 396Ha | 2019-12-09 16:40:43.0 | | |
719 | Aruna Project | Maharashtra | Sindhudurg | Main Canal | Structure | OnGoing | yet to be completed by March 20 | 2019-12-04 20:04:50.0 | | |
720 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | Complete | 3R-21R-DBM60 | 2019-12-05 11:38:47.0 | | |
721 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Barrage | HeadWorks | OnGoing | | 2019-12-16 13:00:49.0 | | |
722 | Bhima LIS | Karnataka | Bijapur | Barrage | HeadWorks | Complete | | 2019-12-24 11:26:30.0 | | |
723 | Bhima LIS | Karnataka | Gulbarga | Other | HeadWorks | Complete | | 2019-12-24 12:00:07.0 | | |
724 | Indiramma Flood Flow Canal | Telangana | Karimnagar | HeadWorks | Other | Complete | | 2019-12-24 13:07:12.0 | | |
725 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | downstream | 2019-08-08 18:26:20.0 | | |
726 | Lower Pedhi | Maharashtra | Amravati | HeadWorks | Dam | Complete | | 2019-08-09 13:59:42.0 | | |
727 | Dolaithabi Barrage | Manipur | Imphal East | Distributaries | Distributaries | Complete | | 2019-08-26 13:00:26.0 | | |
728 | Int. Anandapur Barrage Ph. I | Odisha | Kendujhar | HeadWorks | Barrage | Complete | | 2019-08-27 12:26:44.0 | | |
729 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Other | HeadWorks | null | under progress | 2019-09-24 17:51:34.0 | | |
730 | Thoubal | Manipur | Thoubal | Distributaries | Distributaries | Complete | field channel by CAD | 2019-08-27 16:51:49.0 | | |
731 | Gundlakamma | Andhra Pradesh | Prakasam | Any Other | Maincanal | null | Ayacut-Paddy | 2019-11-18 11:36:59.0 | | |
732 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Main Canal | Main Canal | Complete | Iffc infall regulator | 2019-12-24 12:34:37.0 | | |
733 | SRSP St. II | Telangana | Khammam | Distributaries | Distributaries | Complete | package 54 | 2019-12-05 10:17:09.0 | | |
734 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | Atiwal lift canal | 2019-12-23 13:14:30.0 | | |
735 | Karanja | Karnataka | Bidar | Outlet | Main Canal | Complete | | 2019-12-23 14:04:05.0 | | |
736 | Aruna Project | | Dhule | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | LBC | 2019-05-28 11:46:52.0 | | |
737 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | Nachangaon | 2019-08-05 13:28:49.0 | | |
738 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Outlet | Complete | khamgaon OL 3 | 2019-08-05 17:42:35.0 | | |
739 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | Lining is completed,in patches | 2019-12-26 12:24:49.0 | | |
740 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Yet To Be Completed | LA issues | 2019-12-23 10:30:39.0 | | |
741 | Bhima LIS | Karnataka | Bijapur | Barrage | HeadWorks | Complete | Reservoir | 2019-12-24 11:27:26.0 | | |
742 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Main Canal | Main Canal | OnGoing | left main canal | 2019-12-24 13:16:51.0 | | |
743 | Palemvagu | | Khammam | Distributaries | Distributaries | OnGoing | | 2019-05-04 14:45:41.0 | | |
744 | Dolaithabi Barrage | Manipur | Imphal East | Distributaries | Distributaries | Complete | | 2019-08-26 13:01:12.0 | | |
745 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Yet To Be Completed | NRBC TOTAL LENGTH 55.9 KM nearly 50.0 km is completed,5 km is pending,up to be completed by May 20 | 2019-12-26 12:52:58.0 | | |
746 | Gundlakamma | Andhra Pradesh | Prakasam | Structure | Maincanal | Complete | | 2019-11-18 11:41:03.0 | | |
747 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Main Canal | Structure | Complete | | 2019-12-24 12:45:15.0 | | |
748 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | OnGoing | 4R-3R-21R-DBM60 | 2019-12-05 11:49:47.0 | | |
749 | Int. Anandapur Barrage Ph. I | Odisha | Kendujhar | HeadWorks | Barrage | Complete | Barrage work completed | 2019-08-27 12:26:45.0 | | |
750 | SRSP St. II | Telangana | Khammam | Distributaries | Distributaries | Complete | | 2019-12-05 10:18:59.0 | | |
751 | Karanja | Karnataka | Bidar | Other | HeadWorks | Complete | | 2019-12-23 11:14:06.0 | | |
752 | Karanja | Karnataka | Bidar | Structure | Main Canal | Complete | Jack well | 2019-12-23 13:15:21.0 | | |
753 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | Nachangaon | 2019-08-05 13:29:19.0 | | |
754 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | khamgaon Fall | 2019-08-05 17:43:48.0 | | |
755 | Palemvagu | | Khammam | Distributaries | Distributaries | OnGoing | | 2019-05-04 14:45:34.0 | | |
756 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2019-12-16 13:37:06.0 | | |
757 | Saryu Nahar Pariyojana | Uttar Pradesh | Basti | Branch Canal | Branch Canal | Complete | Basti Branch canal | 2019-08-08 08:58:33.0 | | |
758 | Thoubal | Manipur | Thoubal | Distributaries | Distributaries | Complete | field channel by CADWM | 2019-08-27 16:54:58.0 | | |
759 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Yet To Be Completed | LA iusses | 2019-12-23 10:32:00.0 | | |
760 | Bhima LIS | Karnataka | Gulbarga | Other | HeadWorks | Complete | | 2019-12-24 11:46:15.0 | | |
761 | Indiramma Flood Flow Canal | Telangana | Karimnagar | HeadWorks | Other | Complete | | 2019-12-24 13:12:13.0 | | |
762 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Structure | Complete | Lining in patch is pending | 2019-12-26 14:53:38.0 | | |
763 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Gulbarga | Main Canal | Outlet | Complete | DPO 1 of Allagi B Main Canal | 2019-12-24 13:31:31.0 | | |
764 | Dolaithabi Barrage | Manipur | Imphal East | Distributaries | Distributaries | Complete | field channel. | 2019-08-26 13:26:22.0 | | |
765 | Gundlakamma | Andhra Pradesh | Prakasam | Structure | Branch Canal | Complete | Working Condition | 2019-11-18 11:54:45.0 | | |
766 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Main Canal | Structure | Complete | | 2019-12-24 12:47:09.0 | | |
767 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | OnGoing | 4R-3R-21R-DBM60 | 2019-12-05 11:53:10.0 | | |
768 | Int. Anandapur Barrage Ph. I | Odisha | Kendujhar | Structure | Maincanal | Complete | | 2019-08-27 12:29:25.0 | | |
769 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | Complete | | 2019-12-05 11:24:56.0 | | |
770 | Karanja | Karnataka | Bidar | Other | HeadWorks | Complete | | 2019-12-23 11:14:58.0 | | |
771 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | Dy 1 | 2019-12-23 13:16:24.0 | | |
772 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | Nachangaon | 2019-08-05 13:29:45.0 | | |
773 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | khangaon Fall | 2019-08-05 18:01:15.0 | | |
774 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | Complete | RCC guide Wall | 2019-12-16 13:38:32.0 | | |
775 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2019-12-16 14:41:00.0 | | |
776 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | | 2019-12-26 16:13:24.0 | | |
777 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Yet To Be Completed | Lining | 2019-12-26 16:20:48.0 | | |
778 | Thoubal | Manipur | Thoubal | Main Canal | Maincanal | OnGoing | | 2019-08-27 17:22:41.0 | | |
779 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | OnGoing | 25 Guntas Land pending, KLI | 2019-12-23 10:35:18.0 | | |
780 | Bhima LIS | Karnataka | Gulbarga | Other | HeadWorks | Complete | Balundagi main canal | 2019-12-24 11:48:20.0 | | |
781 | Bhima LIS | Karnataka | Gulbarga | Structure | Main Canal | Complete | State Highway Xing | 2019-12-24 13:51:41.0 | | |
782 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Distributaries | OnGoing | work.is ongoing yet to be completed by feb 2019 | 2019-12-26 15:21:19.0 | | |
783 | Pushkara LIS | Andhra Pradesh | East Godavari | Other | HeadWorks | Complete | | 2019-12-27 10:22:44.0 | | |
784 | Pushkara LIS | Andhra Pradesh | East Godavari | Other | HeadWorks | Complete | | 2019-12-27 10:23:59.0 | | |
785 | Indiramma Flood Flow Canal | Telangana | Karimnagar | HeadWorks | Other | Complete | | 2019-12-24 13:01:28.0 | | |
786 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | KLI | 2019-12-23 11:16:13.0 | | |
787 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | OnGoing | Almost linings is done, in some patches some portion of lining is pending | 2019-12-27 11:09:07.0 | | |
788 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | work completed | 2019-12-27 11:14:38.0 | | |
789 | Pushkara LIS | Andhra Pradesh | East Godavari | Main Canal | Main Canal | Complete | Delivery cistern | 2019-12-27 11:36:52.0 | | |
790 | Pushkara LIS | Andhra Pradesh | East Godavari | Main Canal | Main Canal | Complete | Head regulator | 2019-12-27 11:38:19.0 | | |
791 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | | 2019-12-26 16:12:47.0 | | |
792 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | | 2019-12-26 16:17:13.0 | | |
793 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Yet To Be Completed | vegitations on canal | 2019-12-26 16:21:53.0 | | |
794 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | OnGoing | | 2019-12-26 16:25:15.0 | | |
795 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | open canal | 2019-12-26 16:37:36.0 | | |
796 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | open canal | 2019-12-26 16:38:38.0 | | |
797 | Khadakpurna | Maharashtra | Buldana | Dam | HeadWorks | Complete | 100% storage | 2020-01-03 10:11:38.0 | | |
798 | Khadakpurna | Maharashtra | Buldana | Dam | HeadWorks | Complete | Non cleareance of bushes , trees on d/s & u/ s side of earthen portion . | 2020-01-03 10:21:25.0 | | |
799 | J. Chokka Rao LIS | Telangana | Warangal | Main Canal | Any Other | OnGoing | lining work is in progress | 2020-01-21 16:50:18.0 | | |
800 | J. Chokka Rao LIS | Telangana | Warangal | Other | HeadWorks | OnGoing | | 2020-01-21 16:51:25.0 | | |
801 | J. Chokka Rao LIS | Telangana | Warangal | Other | HeadWorks | OnGoing | | 2020-01-21 17:45:46.0 | | |
802 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | previous bottleneck of LA is tackled now | 2019-12-27 12:16:03.0 | | |
803 | Krishna Koyna LIS | Maharashtra | Sangli | Outlet | Main Canal | Complete | | 2019-12-27 13:23:51.0 | | |
804 | Pushkara LIS | Andhra Pradesh | East Godavari | Main Canal | Main Canal | Complete | Cross Regulator | 2019-12-27 12:05:27.0 | | |
805 | Pushkara LIS | Andhra Pradesh | East Godavari | Distributaries | Distributaries | Complete | Keshavaram distributary | 2019-12-27 12:06:51.0 | | |
806 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | | 2019-12-27 12:23:53.0 | | |
807 | Pushkara LIS | Andhra Pradesh | East Godavari | Main Canal | Structure | Complete | | 2019-12-27 12:53:56.0 | | |
808 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | | 2019-12-27 12:59:39.0 | | |
809 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | | 2019-12-27 13:01:58.0 | | |
810 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | MURARI HR ON PUSHKAR CANAL | 2019-12-27 13:23:47.0 | | |
811 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | | 2019-12-27 13:25:14.0 | | |
812 | J. Chokka Rao LIS | Telangana | Warangal | Other | HeadWorks | Complete | | 2020-01-22 15:18:51.0 | | |
813 | Lower Dudhana | Maharashtra | Parbhani | Main Canal | Main Canal | Complete | bottleneck was cleared | 2020-02-13 14:52:56.0 | | |
814 | Thotapally | Andhra Pradesh | Vizianagaram | Barrage | HeadWorks | OnGoing | maintenance of gantry girder | 2020-02-18 11:16:34.0 | | |
815 | Thotapally | Andhra Pradesh | Vizianagaram | Barrage | HeadWorks | Complete | maintenance of gantry girder | 2020-02-18 11:17:38.0 | | |
816 | Thotapally | Andhra Pradesh | Vizianagaram | Other | HeadWorks | OnGoing | | 2020-02-18 11:20:11.0 | | |
817 | Thotapally | Andhra Pradesh | Vizianagaram | Other | HeadWorks | OnGoing | | 2020-02-18 11:24:39.0 | | |
818 | Thotapally | Andhra Pradesh | Vizianagaram | Other | HeadWorks | Yet To Be Completed | Protection works required | 2020-02-18 11:26:55.0 | | |
819 | Lower Dudhana | Maharashtra | Parbhani | Main Canal | Main Canal | Complete | RBC main canal, bottleneck was cleared | 2020-02-13 10:01:45.0 | | |
820 | Lower Dudhana | Maharashtra | Parbhani | Main Canal | Main Canal | Complete | previous bottleneck was cleared | 2020-02-13 14:42:07.0 | | |
821 | Thotapally | Andhra Pradesh | Vizianagaram | HeadWorks | Barrage | Complete | Maintenance work in progress | 2020-02-18 11:52:35.0 | | |
822 | Thotapally | Andhra Pradesh | Vizianagaram | Main Canal | Structure | Complete | | 2020-02-18 13:37:19.0 | | |
823 | Thotapally | Andhra Pradesh | Vizianagaram | Main Canal | Structure | Complete | Cross Regulator cum escape | 2020-02-18 13:46:19.0 | | |
824 | Thotapally | Andhra Pradesh | Vizianagaram | Main Canal | Structure | Complete | Aqueduct | 2020-02-18 13:52:20.0 | | |
825 | Thotapally | Andhra Pradesh | Vizianagaram | Main Canal | Structure | Complete | Box type Aqueduct | 2020-02-18 14:30:06.0 | | |
826 | Morna (Gureghar) | Maharashtra | Satara | Other | HeadWorks | Complete | GP building aaddev | 2020-02-26 12:22:54.0 | | |
827 | Morna (Gureghar) | Maharashtra | Satara | Other | HeadWorks | Complete | GP building aaddev | 2020-02-26 12:24:04.0 | | |
828 | Morna (Gureghar) | Maharashtra | Satara | Other | HeadWorks | Complete | aaddev | 2020-02-26 12:25:51.0 | | |
829 | Morna (Gureghar) | Maharashtra | Satara | Other | HeadWorks | Complete | animal water tank | 2020-02-26 12:26:42.0 | | |
830 | Morna (Gureghar) | Maharashtra | Satara | Other | HeadWorks | Complete | GP building | 2020-02-26 13:08:21.0 | | |
831 | Morna (Gureghar) | Maharashtra | Satara | Other | HeadWorks | Complete | GP building | 2020-02-26 13:09:05.0 | | |
832 | Morna (Gureghar) | Maharashtra | Satara | Other | HeadWorks | Complete | | 2020-02-26 13:12:14.0 | | |
833 | Morna (Gureghar) | Maharashtra | Satara | Other | HeadWorks | Complete | RR village | 2020-02-26 13:14:04.0 | | |
834 | Dhansiri | Assam | Udalguri | Branch Canal | Any Other | | | 2020-03-13 13:16:50.0 | | |
835 | Morna (Gureghar) | Maharashtra | Satara | Structure | Main Canal | Complete | | 2020-02-26 12:50:30.0 | | |
836 | Morna (Gureghar) | Maharashtra | Satara | Structure | Main Canal | Complete | | 2020-02-26 12:51:20.0 | | |
837 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | Complete | LBC Canal | 2020-02-26 12:52:20.0 | | |
838 | Thotapally | Andhra Pradesh | Vizianagaram | Main Canal | Structure | Complete | cross Regulator- gates not installed | 2020-02-18 14:32:19.0 | | |
839 | Thotapally | Andhra Pradesh | Srikakulam | Main Canal | Structure | Complete | | 2020-02-18 14:57:19.0 | | |
840 | Thotapally | Andhra Pradesh | Srikakulam | Branch Canal | Branch Canal | Complete | rajam branch canal | 2020-02-18 15:02:19.0 | | |
841 | Thotapally | Andhra Pradesh | Vizianagaram | Main Canal | Structure | Complete | | 2020-02-18 15:42:29.0 | | |
842 | Thotapally | Andhra Pradesh | Vizianagaram | Branch Canal | Branch Canal | Complete | srikakulam branch canal | 2020-02-18 15:50:51.0 | | |
843 | Thotapally | Andhra Pradesh | Vizianagaram | Main Canal | Main Canal | Complete | Srikakulam branch canal gate | 2020-02-18 15:51:44.0 | | |
844 | Morna (Gureghar) | Maharashtra | Satara | Structure | Main Canal | Complete | | 2020-02-26 14:01:57.0 | | |
845 | Wang | Maharashtra | Satara | HeadWorks | Dam | OnGoing | | 2020-02-27 11:00:00.0 | | |
846 | Wang | Maharashtra | Satara | HeadWorks | Dam | Complete | | 2020-02-27 11:09:49.0 | | |
847 | Wang | Maharashtra | Satara | HeadWorks | Dam | OnGoing | | 2020-02-27 11:12:41.0 | | |
848 | Wang | Maharashtra | Satara | HeadWorks | Other | OnGoing | RR village | 2020-02-27 11:13:32.0 | | |
849 | Wang | Maharashtra | Satara | HeadWorks | Other | OnGoing | mendha village | 2020-02-27 11:14:45.0 | | |
850 | Wang | Maharashtra | Satara | HeadWorks | Other | Complete | | 2020-02-27 11:38:24.0 | | |
851 | Wang | Maharashtra | Satara | HeadWorks | Other | Complete | Umarkanchn RR village | 2020-02-27 11:57:25.0 | | |
852 | Wang | Maharashtra | Satara | HeadWorks | Dam | OnGoing | | 2020-02-27 11:59:49.0 | | |
853 | Wang | Maharashtra | Satara | HeadWorks | Other | Complete | | 2020-02-27 12:00:46.0 | | |
854 | Wang | Maharashtra | Satara | HeadWorks | Dam | OnGoing | | 2020-02-27 12:47:10.0 | | |
855 | Tarali | Maharashtra | Satara | Other | HeadWorks | OnGoing | | 2020-02-28 10:03:35.0 | | |
856 | Tarali | Maharashtra | Satara | Other | HeadWorks | OnGoing | | 2020-02-28 10:05:12.0 | | |
857 | Tarali | Maharashtra | Satara | HeadWorks | Dam | Complete | | 2020-02-28 11:58:37.0 | | |
858 | Tarali | Maharashtra | Satara | HeadWorks | Other | OnGoing | | 2020-02-28 11:58:39.0 | | |
859 | Tarali | Maharashtra | Satara | HeadWorks | Dam | OnGoing | | 2020-02-28 11:58:40.0 | | |
860 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | konjurde LIS | 2020-02-28 12:14:44.0 | | |
861 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2020-02-28 12:15:44.0 | | |
862 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2020-02-28 12:24:09.0 | | |
863 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2020-02-28 12:34:18.0 | | |
864 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2020-02-28 12:41:16.0 | | |
865 | Tarali | Maharashtra | Satara | Main Canal | Structure | OnGoing | | 2020-02-28 13:06:17.0 | | |
866 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2020-02-28 13:07:20.0 | | |
867 | null | | Panna | Distributaries | Outlet | Complete | | 2018-10-04 14:06:28.0 | | |
868 | Tarali | Maharashtra | Satara | Main Canal | Structure | OnGoing | | 2020-02-28 15:11:44.0 | | |
869 | Tarali | Maharashtra | Satara | Main Canal | Any Other | OnGoing | | 2020-02-28 16:57:06.0 | | |
870 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | The offset of 50m length has to be constructed by railway department.
The work is pending from Railway Department due to corona and the payment has been released from client to railway department.
| 2020-06-25 11:49:09.0 | | |
871 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | Yet To Be Completed | Due to land acquisition the work is pending | 2020-06-25 13:10:19.0 | | |
872 | Sri Komarambheem | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2020-06-10 13:48:58.0 | | |
873 | Sri Komarambheem | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2020-06-10 13:52:45.0 | | |
874 | Sri Komarambheem | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2020-06-10 13:53:32.0 | | |
875 | Upper Tunga | Karnataka | Haveri | Distributaries | Distributaries | Yet To Be Completed | Off take point of DY- 6 is pending due to land acquisition | 2020-06-25 13:17:06.0 | | |
876 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | work under progress | 2020-06-25 12:35:19.0 | | |
877 | Sri Komarambheem | Telangana | Adilabad | Other | HeadWorks | Complete | | 2020-06-10 14:08:43.0 | | |
878 | Sri Komarambheem | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2020-06-10 14:09:56.0 | | |
879 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2020-02-28 17:07:07.0 | | |
880 | Tarali | Maharashtra | Satara | Main Canal | Structure | OnGoing | | 2020-03-03 20:55:33.0 | | |
881 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | | 2020-06-25 16:04:02.0 | | |
882 | Arjun Shayak | | Mahoba | MainCanal | Maincanal | Ongoing | | 2018-10-30 14:31:55.0 | | |
883 | Arjun Shayak | | Mahoba | MainCanal | AnyOther | | | 2018-10-30 10:41:43.0 | | |
884 | Arjun Shayak | | Mahoba | MainCanal | AnyOther | | | 2018-10-30 11:42:58.0 | | |
885 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | Complete | Head Regulator of Kabrai Feeder Channel | 2019-11-26 09:48:38.0 | | |
886 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | Old Main Canal, IP restored | 2019-11-26 09:51:22.0 | | |
887 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2019-11-26 10:00:03.0 | | |
888 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | Complete | Soil Stabilization req. | 2019-11-26 10:07:08.0 | | |
889 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | VRB for Village Ghutwai | 2019-11-26 10:22:50.0 | | |
890 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | VRB for Jarauli | 2019-11-26 10:41:15.0 | | |
891 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | DRB for Bumneta | 2019-11-26 10:58:20.0 | | |
892 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | HR of Chandrawal Dam Feeder Channel | 2019-11-26 11:35:31.0 | | |
893 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | Escape Channel of Chandrawal Dam Feeder Channel, Gates are installed | 2019-11-26 11:39:26.0 | | |
894 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | Chandrawal River Crossing of Kabrai Feeder Channel | 2019-11-26 11:46:24.0 | | |
895 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | OnGoing | Mining Permission granted and work is in progress with full swing | 2019-11-26 12:00:40.0 | | |
896 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | OnGoing | Reach 21.5 km to 22.0 km of Kabrai Feeder Channel | 2019-11-26 12:02:54.0 | | |
897 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | DRB at 3 km RD of Kabrai Main Canal | 2019-11-26 15:37:16.0 | | |
898 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | OnGoing | HR of Khandeh Disty | 2019-11-26 16:07:43.0 | | |
899 | Arjuna Project | Maharashtra | Ratnagiri | Main Canal | Main Canal | Complete | LBC main canal of total length 16.00km is completed throughoutly.. and one time rotation is supplied in the month of May through the whole strech.. only total length of 87kms of CADWM ON LBC IS IN PROGRESS, 1200M OF LAYING IS DONE. THE WORK IS TO BE COMPLETED BY MARCH20, AS PER TENDER TERMS | 2019-12-03 23:50:19.0 | | |
900 | Bansagar Unit - II | | Rewa | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-15 10:05:12.0 | | |
901 | Bansagar Unit - II | | Sidhi | Distributaries | Outlet | Complete | | 2018-12-14 12:41:00.0 | | |
902 | Bargi Diversion Project Ph- I (km. 16 to Km 63) | | Jabalpur | Minors_Sub_Minors | Structure | Ongoing | | 2018-12-17 15:38:48.0 | | |
903 | Bargi Diversion Project Ph- I (km. 16 to Km 63) | | Jabalpur | Minors_Sub_Minors | Maincanal | Complete | | 2018-12-17 14:43:43.0 | | |
904 | Bargi Diversion Project Ph- I (km. 16 to Km 63) | | Jabalpur | Distributaries | Structure | Complete | | 2018-12-17 11:09:20.0 | | |
905 | Bargi Diversion Project Ph- I (km. 16 to Km 63) | | Jabalpur | MainCanal | Structure | Complete | | 2018-12-17 12:51:52.0 | | |
906 | Bargi Diversion Projrct Ph- IV (Km. 154 to Km. 197) | | Satna | MainCanal | Structure | Complete | | 2018-12-18 13:18:46.0 | | |
907 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | | Katni | MainCanal | Structure | Ongoing | | 2018-12-18 11:33:34.0 | | |
908 | Bargi Diversion Projrct Ph- IV (Km. 154 to Km. 197) | | Katni | MainCanal | Structure | Complete | | 2018-12-18 12:59:42.0 | | |
909 | Bargi Diversion Projrct Ph- IV (Km. 154 to Km. 197) | | Katni | MainCanal | Maincanal | Complete | | 2018-12-18 13:04:33.0 | | |
910 | null | | Chhatarpur | MainCanal | Structure | Complete | | 2018-10-04 11:54:56.0 | | |
911 | null | | Chhatarpur | MainCanal | Structure | Complete | | 2018-10-04 11:54:56.0 | | |
912 | Bariyarpur LBC | | Chhatarpur | Distributaries | Outlet | Complete | | 2018-10-04 14:35:41.0 | | |
913 | null | | Panna | Distributaries | Outlet | Complete | | 2018-10-04 14:06:28.0 | | |
914 | null | | Chhatarpur | MainCanal | Structure | Complete | | 2018-10-03 15:58:16.0 | | |
915 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2019-08-07 18:21:01.0 | | |
916 | Bansagar Unit - II | | Sidhi | BranchCanal | Structure | null | | 2018-12-14 13:50:10.0 | | |
917 | Singhpur Project | | Chhatarpur | Minors_Sub_Minors | Structure | Complete | | 2018-10-03 16:56:46.0 | | |
918 | Lower Wardha | Maharashtra | Yavatmal | HeadWorks | Other | Complete | pump house filter parts are spread to outside. | 2019-08-07 12:35:00.0 | | |
919 | Champamati | | Chirang | MainCanal | AnyOther | | | 2018-12-07 12:48:30.0 | | |
920 | Bhima LIS | Karnataka | Gulbarga | Structure | Distributaries | Complete | discharge measuring device | 2019-12-24 13:12:44.0 | | |
921 | Champamati | | Chirang | Branch Canal | Branch Canal | Complete | | 2019-05-11 11:46:27.0 | | |
922 | Champamati | | Chirang | Branch Canal | Branch Canal | Complete | | 2019-05-11 11:52:03.0 | | |
923 | Champamati | | Chirang | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | MIC | 2019-05-11 11:55:35.0 | | |
924 | Champamati | | Chirang | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | MIC | 2019-05-11 11:59:00.0 | | |
925 | Champamati | | Kokrajhar | Branch Canal | Branch Canal | Complete | RBC3 | 2019-05-11 13:41:44.0 | | |
926 | Champamati | | Kokrajhar | Branch Canal | Branch Canal | Complete | RBC3 | 2019-05-11 13:48:13.0 | | |
927 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-12 12:53:40.0 | | |
928 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-17 12:52:55.0 | | |
929 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-17 13:10:09.0 | | |
930 | Dhansiri | | Udalguri | Distributaries | Maincanal | Ongoing | | 2018-12-12 11:31:34.0 | | |
931 | Dhansiri | | Udalguri | MainCanal | Structure | Ongoing | | 2018-12-12 15:26:54.0 | | |
932 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | tail | 2019-07-09 12:21:19.0 | | |
933 | Dhom Balkawadi | Maharashtra | Satara | Maincanal | Structure | OnGoing | gate installation balance | 2019-07-09 13:21:29.0 | | |
934 | Dolaithabi Barrage | | Imphal East | MainCanal | AnyOther | | | 2018-12-27 16:53:01.0 | | |
935 | Dolaithabi Barrage | Manipur | Imphal East | Outlet | Branch Canal | Complete | | 2019-08-26 14:35:44.0 | | |
936 | Durgawati | | Rohtas | MainCanal | Structure | Complete | | 2018-12-13 12:31:52.0 | | |
937 | Durgawati | | Rohtas | MainCanal | Structure | Complete | | 2018-12-13 13:43:11.0 | | |
938 | Durgawati | | Kaimur (Bhabua) | MainCanal | Structure | Complete | | 2018-12-14 12:12:22.0 | | |
939 | Durgawati | | Rohtas | Distributaries | Outlet | Complete | | 2018-12-13 11:43:30.0 | | |
940 | Durgawati | | Rohtas | Distributaries | Maincanal | Complete | | 2018-12-13 12:34:41.0 | | |
941 | Durgawati | | Rohtas | Distributaries | Structure | Complete | | 2018-12-13 13:45:33.0 | | |
942 | Durgawati | | Kaimur (Bhabua) | MainCanal | Structure | Complete | | 2018-12-14 12:15:25.0 | | |
943 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 09:39:44.0 | | |
944 | Durgawati | | Rohtas | Minors_Sub_Minors | Structure | Complete | | 2018-12-13 14:05:48.0 | | |
945 | Durgawati | | Rohtas | Distributaries | Maincanal | Ongoing | | 2018-12-13 12:04:27.0 | | |
946 | Gosikhurd (NP) | | Bhandara | MainCanal | AnyOther | | | 2018-10-11 10:40:56.0 | | |
947 | Thoubal | | Thoubal | MainCanal | AnyOther | | | 2018-12-27 12:27:56.0 | | |
948 | Gosikhurd (NP) | Maharashtra | Bhandara | Main Canal | Main Canal | OnGoing | | 2019-10-10 16:13:02.0 | | |
949 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | Bottleneck is settled | 2019-12-02 11:23:00.0 | | |
950 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | bottleneck cleared | 2019-12-02 13:05:16.0 | | |
951 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | Godhijhari Branch Canal | 2019-10-09 15:10:30.0 | | |
952 | Gosikhurd (NP) | | Bhandara | BranchCanal | Structure | Complete | | 2018-10-11 14:31:17.0 | | |
953 | Gosikhurd (NP) | | Chandrapur | MainCanal | Maincanal | Ongoing | | 2018-10-17 14:02:05.0 | | |
954 | Gundlakamma | | Prakasam | BranchCanal | Structure | Complete | | 2018-10-22 13:37:50.0 | | |
955 | Gundlakamma | | Prakasam | Distributaries | Distributaries | OnGoing | | 2019-05-30 10:52:46.0 | | |
956 | Gundlakamma | | Prakasam | Distributaries | Distributaries | OnGoing | | 2019-05-30 10:52:46.0 | | |
957 | Gundlakamma | | Prakasam | Distributaries | Distributaries | OnGoing | | 2019-05-30 11:04:12.0 | | |
958 | Gundlakamma | | Prakasam | Distributaries | Distributaries | OnGoing | | 2019-05-30 11:04:12.0 | | |
959 | null | | Prakasam | Distributaries | Outlet | Complete | | 2018-10-22 14:12:01.0 | | |
960 | J. Chokka Rao LIS | Telangana | Warangal | Main Canal | Any Other | OnGoing | 23.40 phase iii | 2020-01-22 15:10:03.0 | | |
961 | J. Chokka Rao LIS | Telangana | Warangal | Main Canal | Any Other | Complete | phase ii | 2020-01-22 16:08:24.0 | | |
962 | J. Chokka Rao LIS | Telangana | Warangal | Main Canal | Any Other | OnGoing | in progress | 2020-01-22 16:43:21.0 | | |
963 | J. Chokka Rao LIS | | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2019-05-03 12:33:10.0 | | |
964 | J. Chokka Rao LIS | | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2019-05-03 12:33:48.0 | | |
965 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | OnGoing | | 2019-12-05 11:57:42.0 | | |
966 | SRSP St. II | Telangana | Khammam | Distributaries | Distributaries | Complete | DBM50 | 2019-12-05 10:29:29.0 | | |
967 | Karanja | Karnataka | Bidar | Structure | Main Canal | OnGoing | | 2019-12-23 13:20:33.0 | | |
968 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | near railway crossing | 2019-12-23 13:21:44.0 | | |
969 | Karanja | Karnataka | Bidar | Structure | Main Canal | OnGoing | Syphone | 2019-12-23 13:43:04.0 | | |
970 | Karanja | Karnataka | Bidar | Structure | Main Canal | OnGoing | syphone | 2019-12-23 13:45:05.0 | | |
971 | Kelo | | Raigarh | Distributaries | Maincanal | Ongoing | | 2018-12-20 15:37:55.0 | | |
972 | Kelo | | Raigarh | Headworks | Dam | Complete | | 2018-12-21 10:04:22.0 | | |
973 | Kelo | | Raigarh | MainCanal | Maincanal | Complete | | 2018-12-21 10:36:53.0 | | |
974 | Khadakpurna | Maharashtra | Buldana | Main Canal | Main Canal | OnGoing | outof 10km yet 4km is completed and balance work to be upto March 2020 | 2020-01-03 10:54:07.0 | | |
975 | Khadakpurna | Maharashtra | Buldana | Main Canal | Main Canal | OnGoing | Lining work inprogress .Preparation of Surface is ready. | 2020-01-03 13:20:34.0 | | |
976 | Krishna Koyna LIS | Maharashtra | Sangli | Outlet | Main Canal | Yet To Be Completed | OUTLET IS PROVIDES, VALVE AND CHAMVER ARE ESTABLISHED, CADWM WORKS IS PENDING | 2019-12-27 11:21:00.0 | | |
977 | Krishna Koyna LIS | Maharashtra | Sangli | Any Other | Main Canal | Complete | farmers are now preparing their draught prone land to the cultivated land, now they are fully take gate farming which is mostly famous for this area | 2019-12-27 11:31:09.0 | | |
978 | Krishna Koyna LIS | Maharashtra | Sangli | Structure | Main Canal | Complete | in the last three month this structure is completed, two time rotation is supplied | 2019-12-27 12:04:05.0 | | |
979 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | OnGoing | | 2019-12-27 13:02:42.0 | | |
980 | Krishna Koyna LIS | Maharashtra | Sangli | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | CADWM WORKS ARE IN PROGRESS | 2019-12-27 15:41:48.0 | | |
981 | Kudali | Maharashtra | Satara | Maincanal | Main Canal | OnGoing | feeder canal | 2019-06-14 12:47:56.0 | | |
982 | Lower Panzara | | Dhule | Minors/ Sub-Minors | Structure | | FC8L | 2019-05-28 13:58:15.0 | | |
983 | Lower Wardha | Maharashtra | Yavatmal | HeadWorks | Other | Complete | | 2019-08-07 12:27:27.0 | | |
984 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | road crossing | 2019-08-07 18:37:04.0 | | |
985 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | Complete | only canal lining work is on progress | 2019-08-28 18:53:36.0 | | |
986 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Main Canal | Main Canal | Complete | Tail end of Main Canal | 2019-08-29 14:28:02.0 | | |
987 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Main Canal | Complete | Head Regulator of Chandausi Branch Canal | 2019-08-29 14:29:45.0 | | |
988 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | Offtake of Didauli Dy at 14km RD of Chandausi Branch Canal | 2019-08-29 17:17:10.0 | | |
989 | Mahuar Project | Madhya Pradesh | Shivpuri | Other | HeadWorks | null | DRB at RBC from Mahauar dam | 2019-07-27 12:03:51.0 | | |
990 | Mod. of Gang Canal | | | BranchCanal | AnyOther | | | 2018-09-28 17:03:36.0 | | |
991 | Mod. of Gang Canal | | | BranchCanal | AnyOther | | | 2018-09-28 17:03:36.0 | | |
992 | Mod. of Gang Canal | | | BranchCanal | AnyOther | | | 2018-09-28 17:03:36.0 | | |
993 | Mod. of Gang Canal | Rajasthan | Ganganagar | Minors/ Sub-Minors | Outlet | Complete | | 2019-07-17 11:49:06.0 | | |
994 | Mod. of Gang Canal | Rajasthan | Ganganagar | Structure | Branch Canal | Complete | Null | 2019-07-18 13:26:40.0 | | |
995 | Mod. of Gang Canal | Rajasthan | Ganganagar | Structure | Branch Canal | Complete | Null | 2019-07-18 13:28:40.0 | | |
996 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2020-02-26 12:37:04.0 | | |
997 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2020-02-26 12:39:12.0 | | |
998 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2020-02-26 12:41:53.0 | | |
999 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2020-02-26 12:42:46.0 | | |
1000 | Morna (Gureghar) | Maharashtra | Satara | Structure | Main Canal | OnGoing | | 2020-02-26 12:46:25.0 | | |
1001 | Morna (Gureghar) | Maharashtra | Satara | Structure | Main Canal | OnGoing | RBC | 2020-02-26 13:38:41.0 | | |
1002 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2020-02-26 13:46:11.0 | | |
1003 | Morna (Gureghar) | Maharashtra | Satara | Structure | Main Canal | Complete | | 2020-02-26 13:48:27.0 | | |
1004 | Morna (Gureghar) | Maharashtra | Satara | Structure | Main Canal | Yet To Be Completed | | 2020-02-26 13:51:31.0 | | |
1005 | Narmada Canal | | Jalor | MainCanal | Maincanal | Complete | | 2018-10-11 16:48:05.0 | | |
1006 | null | | Jalor | MainCanal | Structure | Ongoing | | 2018-10-11 17:17:00.0 | | |
1007 | Narmada Canal | | Jalor | MainCanal | Structure | Complete | | 2018-10-12 10:43:42.0 | | |
1008 | Omkareshwar Project Canal Ph-III (RBC Km. 65.50 to Km. 142) | Madhya Pradesh | Dhar | Maincanal | Main Canal | Complete | main canal at mumbai agra highway nh3 passing through box culvert | 2020-04-29 01:10:36.0 | | |
1009 | Sangola Branch Canal | Maharashtra | Solapur | Structure | Branch Canal | Complete | | 2019-12-26 16:24:31.0 | | |
1010 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | Road crossing and Pipe pushing | 2019-12-26 16:36:56.0 | | |
1011 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | Road crossing | 2019-12-26 16:39:25.0 | | |
1012 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | OnGoing | | 2019-06-28 14:43:53.0 | | |
1013 | Sardar Sarovar | Gujarat | Gandhinagar | Maincanal | Main Canal | Complete | for testing | 2019-06-28 14:56:34.0 | | |
1014 | Sardar Sarovar | Gujarat | Gandhinagar | Main Canal | Maincanal | Complete | for testing | 2019-06-28 14:58:08.0 | | |
1015 | Saryu Nahar Pariyojana | Uttar Pradesh | Bahraich | Branch Canal | Branch Canal | Complete | ?????? | 2019-08-07 09:34:30.0 | | |
1016 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Main Canal | OnGoing | | 2019-08-07 13:42:08.0 | | |
1017 | Sri Komarambheem | Telangana | Adilabad | Distributaries | Distributaries | Complete | D1L2 | 2020-06-10 14:20:50.0 | | |
1018 | Sri Komarambheem | Telangana | Adilabad | Distributaries | Distributaries | Complete | D1L2 | 2020-06-10 14:21:29.0 | | |
1019 | Sri Rameshwar Irrigation | | Belgaum | Maincanal | Structure | Complete | | 2019-03-13 13:04:42.0 | | |
1020 | Sri Rameshwar Irrigation | | Belgaum | null | Outlet | Complete | | 2019-03-13 13:20:40.0 | | |
1021 | Subernarekha | Odisha | Mayurbhanj | Branch Canal | Branch Canal | OnGoing | c/r cum H/R under progress | 2019-07-29 16:29:36.0 | | |
1022 | Subernarekha Multipurpose | Jharkhand | Purbi Singhbhum | Minors/ Sub-Minors | Outlet | Complete | | 2019-08-19 11:19:36.0 | | |
1023 | Tarali | Maharashtra | Satara | Maincanal | Main Canal | OnGoing | Maan extended canal | 2019-06-13 15:17:53.0 | | |
1024 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | Aqueduct | 2020-02-28 17:03:57.0 | | |
1025 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2020-02-28 17:06:06.0 | | |
1026 | Tillari (MH) | Maharashtra | North Goa | Outlet | Branch Canal | Yet To Be Completed | NH 66, crossing is pending, all the letters regarding Required NOC is submitted to the NHAI, BUT still irrigation department does not receive any response from NHAI | 2019-12-09 12:19:20.0 | | |
1027 | Upper Indravati (KBK) | Odisha | Kalahandi | Minors/ Sub-Minors | Any Other | | Kashibahal Well | 2019-06-07 10:15:55.0 | | |
1028 | Upper Indravati (KBK) | Odisha | Kalahandi | Branch Canal | Branch Canal | Complete | chhuriagarh branch canal | 2019-06-07 16:10:57.0 | | |
1031 | Durgawati | Bihar | Rohtas | Distributaries | Distributaries | Complete | | 2020-08-06 11:34:05.0 | | |
1032 | Durgawati | Bihar | Rohtas | Distributaries | Distributaries | Complete | | 2020-08-06 11:37:19.0 | | |
1033 | Durgawati | Bihar | Rohtas | Distributaries | Distributaries | Complete | | 2020-08-06 12:02:45.0 | | |
1034 | Durgawati | Bihar | Rohtas | Distributaries | Distributaries | Complete | | 2020-08-06 12:16:22.0 | | |
1035 | Sardar Sarovar | Gujarat | Rajkot | Main Canal | Main Canal | Complete | | 2020-08-06 12:56:28.0 | | |
1036 | Durgawati | Bihar | Rohtas | Distributaries | Distributaries | OnGoing | | 2020-08-06 14:19:35.0 | | |
1037 | Durgawati | Bihar | Rohtas | HeadWorks | Dam | OnGoing | | 2020-08-06 15:44:58.0 | | |
1038 | Durgawati | Bihar | Rohtas | HeadWorks | Dam | Complete | | 2020-08-06 16:37:02.0 | | |
1039 | Durgawati | Bihar | Rohtas | HeadWorks | Dam | Complete | | 2020-08-06 16:37:17.0 | | |
1040 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | OnGoing | | 2020-08-20 09:13:26.0 | | |
1041 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2020-08-20 09:30:02.0 | | |
1042 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2020-08-20 10:01:12.0 | | |
1043 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2020-08-20 10:16:33.0 | | |
1044 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2020-08-20 10:37:33.0 | | |
1045 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2020-08-20 10:59:27.0 | | |
1046 | Arjun Shayak | Uttar Pradesh | Mahoba | Critical Issue / Bottleneck | Main Canal | Complete | | 2020-08-20 11:58:20.0 | | |
1047 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2020-08-20 12:07:34.0 | | |
1048 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2020-08-20 12:23:40.0 | | |
1049 | Sagad Project | Madhya Pradesh | Vidisha | Any Other | Minors/ Sub-Minors | Complete | | 2020-08-20 13:36:33.0 | | |
1050 | Sagad Project | Madhya Pradesh | Vidisha | Main Canal | Main Canal | Complete | | 2020-08-20 15:03:32.0 | | |
1051 | Sagad Project | Madhya Pradesh | Vidisha | Any Other | Distributaries | Complete | | 2020-08-20 15:19:42.0 | | |
1052 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | OnGoing | | 2020-08-20 16:20:59.0 | | |
1053 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2020-08-20 17:13:33.0 | | |
1054 | Madhya Ganga Canal Ph-II | Uttar Pradesh | | Structure | Main Canal | OnGoing | | 2020-08-31 14:34:47.0 | | |
1055 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Critical Issue / Bottleneck | Main Canal | OnGoing | | 2020-08-31 14:55:31.0 | | |
1056 | Omkareshwar Project Canal Phase-II (RBC Km. 9.70 to Km. 65.50) | Madhya Pradesh | West Nimar | Any Other | Minors/ Sub-Minors | Complete | | 2020-08-31 15:13:32.0 | | |
1057 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | Complete | | 2020-08-31 15:25:34.0 | | |
1058 | Omkareshwar Project Canal Phase-II (RBC Km. 9.70 to Km. 65.50) | Madhya Pradesh | West Nimar | Main Canal | Main Canal | Complete | | 2020-08-31 15:45:08.0 | | |
1059 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | Complete | | 2020-08-31 16:04:30.0 | | |
1060 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | Complete | | 2020-08-31 16:14:45.0 | | |
1061 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Main Canal | Structure | OnGoing | | 2020-08-31 17:01:54.0 | | |
1062 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | OnGoing | | 2020-08-31 17:37:25.0 | | |
1063 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | OnGoing | | 2020-08-31 18:03:29.0 | | |
1064 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | OnGoing | | 2020-08-31 18:46:31.0 | | |
1065 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | Complete | | 2020-08-31 19:04:34.0 | | |
1066 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2020-09-01 10:13:23.0 | | |
1067 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2020-09-01 10:27:31.0 | | |
1068 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | Complete | | 2020-09-01 10:48:10.0 | | |
1069 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Dhar | Distributaries | Distributaries | Complete | | 2020-09-01 12:01:56.0 | | |
1070 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Dhar | Any Other | Distributaries | Complete | | 2020-09-01 12:06:05.0 | | |
1071 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2020-09-01 12:18:22.0 | | |
1072 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Dhar | Any Other | Minors/ Sub-Minors | Complete | | 2020-09-01 12:20:23.0 | | |
1073 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Dhar | Main Canal | Main Canal | Complete | | 2020-09-01 12:26:43.0 | | |
1074 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2020-09-01 12:46:50.0 | | |
1075 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2020-09-01 13:01:11.0 | | |
1076 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Dhar | Other | HeadWorks | Complete | | 2020-09-01 13:07:27.0 | | |
1077 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Moradabad | Structure | Branch Canal | OnGoing | | 2020-09-01 15:50:20.0 | | |
1078 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Moradabad | Critical Issue / Bottleneck | Branch Canal | Yet To Be Taken Up | | 2020-09-01 16:30:05.0 | | |
1079 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2020-09-01 18:14:46.0 | | |
1080 | Omkareshwar Project Canal Ph-IV | Madhya Pradesh | West Nimar | Any Other | Minors/ Sub-Minors | Complete | | 2020-09-02 11:26:16.0 | | |
1081 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Outlet | Branch Canal | Complete | | 2020-09-13 12:02:35.0 | | |
1082 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Outlet | Branch Canal | Complete | | 2020-09-13 12:03:23.0 | | |
1083 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Branch Canal | Outlet | Complete | | 2020-09-13 12:18:05.0 | | |
1084 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Branch Canal | Any Other | Complete | | 2020-09-13 12:20:19.0 | | |
1085 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Branch Canal | Outlet | Complete | | 2020-09-13 12:31:43.0 | | |
1086 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Branch Canal | Outlet | Complete | | 2020-09-13 12:35:51.0 | | |
1087 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Distributaries | Outlet | Complete | | 2020-09-14 09:19:41.0 | | |
1088 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Distributaries | Outlet | Complete | | 2020-09-14 09:21:44.0 | | |
1089 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Distributaries | Distributaries | Complete | | 2020-09-14 09:31:45.0 | | |
1090 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Distributaries | Outlet | Complete | | 2020-09-14 09:49:05.0 | | |
1091 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Distributaries | Outlet | OnGoing | | 2020-09-14 10:27:24.0 | | |
1092 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Distributaries | Outlet | Complete | | 2020-09-14 10:30:29.0 | | |
1093 | Parkachik Khows Canal | Jammu and Kashmir | Kargil | Main Canal | Any Other | Complete | | 2020-09-22 17:47:47.0 | | |
1094 | Parkachik Khows Canal | Jammu and Kashmir | Kargil | Main Canal | Main Canal | Complete | | 2020-09-22 17:57:47.0 | | |
1095 | Parkachik Khows Canal | Jammu and Kashmir | Kargil | Main Canal | Structure | Complete | | 2020-09-22 18:01:25.0 | | |
1096 | Karanja | Karnataka | Bidar | HeadWorks | Other | Complete | | 2020-09-28 13:31:56.0 | | |
1097 | Karanja | Karnataka | Bidar | Other | HeadWorks | Complete | | 2020-09-28 13:33:57.0 | | |
1098 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | | 2020-09-28 13:58:48.0 | | |
1099 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | | 2020-09-28 14:17:13.0 | | |
1100 | Karanja | Karnataka | Bidar | Main Canal | Main Canal | Complete | | 2020-09-28 14:25:23.0 | | |
1101 | Karanja | Karnataka | Bidar | Distributaries | Distributaries | Complete | | 2020-09-28 15:05:26.0 | | |
1102 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-05 16:09:32.0 | | |
1103 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-05 16:10:18.0 | | |
1104 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-05 16:12:04.0 | | |
1105 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-05 16:14:32.0 | | |
1106 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 16:24:43.0 | | |
1107 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-05 16:26:14.0 | | |
1108 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 16:43:48.0 | | |
1109 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 16:45:10.0 | | |
1110 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-05 17:02:28.0 | | |
1111 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-05 17:04:18.0 | | |
1112 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 17:08:37.0 | | |
1113 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-05 17:31:41.0 | | |
1114 | Upper Kundalika | Maharashtra | Bid | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-05 17:33:10.0 | | |
1115 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 17:42:20.0 | | |
1116 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 17:43:17.0 | | |
1117 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 17:44:42.0 | | |
1118 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 17:51:27.0 | | |
1119 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 17:54:42.0 | | |
1120 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 17:55:14.0 | | |
1121 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 18:00:37.0 | | |
1122 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 18:01:25.0 | | |
1123 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 18:02:32.0 | | |
1124 | Upper Kundalika | Maharashtra | Bid | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-05 18:03:35.0 | | |
1125 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-06 15:19:25.0 | | |
1126 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-06 15:21:55.0 | | |
1127 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-06 15:24:58.0 | | |
1128 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-06 15:26:38.0 | | |
1129 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-06 15:27:50.0 | | |
1130 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-06 15:31:54.0 | | |
1131 | Lower Dudhana | Maharashtra | Parbhani | Any Other | Distributaries | Complete | | 2020-10-06 15:33:49.0 | | |
1132 | Lower Dudhana | Maharashtra | Parbhani | Outlet | Distributaries | Complete | | 2020-10-06 15:48:16.0 | | |
1133 | Lower Dudhana | Maharashtra | Parbhani | Outlet | Distributaries | Complete | | 2020-10-06 15:48:49.0 | | |
1134 | Lower Dudhana | Maharashtra | Parbhani | Outlet | Distributaries | Complete | | 2020-10-06 15:49:54.0 | | |
1135 | Lower Dudhana | Maharashtra | Parbhani | Any Other | Distributaries | Complete | | 2020-10-06 16:08:27.0 | | |
1136 | Lower Dudhana | Maharashtra | Parbhani | Any Other | Distributaries | Complete | | 2020-10-06 16:11:41.0 | | |
1137 | Lower Dudhana | Maharashtra | Parbhani | Any Other | Distributaries | Complete | | 2020-10-06 16:13:59.0 | | |
1138 | Lower Dudhana | Maharashtra | Parbhani | Any Other | Distributaries | Complete | | 2020-10-06 16:16:03.0 | | |
1139 | Lower Dudhana | Maharashtra | Parbhani | Outlet | Distributaries | Complete | | 2020-10-06 16:36:36.0 | | |
1140 | Sardar Sarovar | Gujarat | Gandhinagar | Dam | HeadWorks | Complete | | 2020-10-08 18:47:01.0 | | |
1141 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2020-10-12 13:39:54.0 | | |
1142 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2020-10-12 13:41:00.0 | | |
1143 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2020-10-12 13:45:06.0 | | |
1144 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2020-10-12 13:45:56.0 | | |
1145 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2020-10-12 13:47:25.0 | | |
1146 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2020-10-12 14:01:11.0 | | |
1147 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2020-10-12 14:02:15.0 | | |
1171 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 14:58:15.0 | | |
1148 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-12 14:21:32.0 | | |
1149 | Bembla | Maharashtra | Yavatmal | Main Canal | Main Canal | Complete | | 2020-10-12 14:55:28.0 | | |
1150 | Bembla | Maharashtra | Yavatmal | Main Canal | Main Canal | Complete | | 2020-10-12 14:56:35.0 | | |
1151 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-12 15:09:12.0 | | |
1152 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-12 15:09:47.0 | | |
1153 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2020-10-12 15:13:26.0 | | |
1154 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-13 12:02:46.0 | | |
1155 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-13 12:07:09.0 | | |
1156 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-13 12:08:51.0 | | |
1157 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-13 12:10:56.0 | | |
1158 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-13 12:18:28.0 | | |
1159 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-13 12:19:30.0 | | |
1160 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-13 12:28:32.0 | | |
1161 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-13 12:31:31.0 | | |
1162 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-13 12:36:04.0 | | |
1163 | Bembla | Maharashtra | Yavatmal | Main Canal | Main Canal | Complete | | 2020-10-13 12:50:56.0 | | |
1164 | Bembla | Maharashtra | Yavatmal | Outlet | Main Canal | Complete | | 2020-10-13 13:42:26.0 | | |
1165 | Bembla | Maharashtra | Yavatmal | Outlet | Main Canal | Complete | | 2020-10-13 13:45:09.0 | | |
1166 | Bembla | Maharashtra | Yavatmal | Structure | Main Canal | Complete | | 2020-10-13 13:48:24.0 | | |
1167 | Bembla | Maharashtra | Yavatmal | Outlet | Main Canal | Complete | | 2020-10-13 13:50:19.0 | | |
1168 | Bembla | Maharashtra | Yavatmal | Outlet | Main Canal | Complete | | 2020-10-13 14:01:52.0 | | |
1169 | Bembla | Maharashtra | Yavatmal | Outlet | Main Canal | Complete | | 2020-10-13 14:03:08.0 | | |
1170 | Restoration & Mod. of Main Ravi Canal | Jammu and Kashmir | Gurdaspur | Main Canal | Any Other | Complete | | 2020-10-14 00:44:12.0 | | |
1172 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:01:49.0 | | |
1173 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:04:25.0 | | |
1174 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:07:33.0 | | |
1175 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:08:05.0 | | |
1176 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:13:57.0 | | |
1177 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:16:17.0 | | |
1178 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:22:16.0 | | |
1179 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:27:06.0 | | |
1180 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:48:38.0 | | |
1181 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:49:38.0 | | |
1182 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-14 15:51:28.0 | | |
1183 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | Complete | | 2020-10-14 16:04:24.0 | | |
1184 | Lower Wardha | Maharashtra | Wardha | Distributaries | Distributaries | Complete | | 2020-10-14 16:05:13.0 | | |
1185 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-14 16:06:00.0 | | |
1186 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-10-14 16:06:48.0 | | |
1187 | Lower Wardha | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-15 13:26:32.0 | | |
1188 | Lower Wardha | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-15 13:28:42.0 | | |
1189 | Lower Wardha | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-15 13:39:41.0 | | |
1190 | Lower Wardha | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-15 13:43:31.0 | | |
1191 | Lower Wardha | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-15 13:48:52.0 | | |
1192 | Lower Wardha | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-15 14:29:29.0 | | |
1193 | Lower Wardha | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-15 14:30:22.0 | | |
1194 | Lower Wardha | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2020-10-15 14:33:03.0 | | |
1195 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2020-10-16 12:41:06.0 | | |
1196 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2020-10-16 12:42:10.0 | | |
1197 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2020-10-16 12:43:15.0 | | |
1198 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2020-10-16 12:50:54.0 | | |
1199 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2020-10-16 12:58:14.0 | | |
1200 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2020-10-16 12:59:00.0 | | |
1201 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2020-10-16 13:02:06.0 | | |
1202 | Lower Pedhi | Maharashtra | Amravati | HeadWorks | Other | Complete | | 2020-10-16 13:59:52.0 | | |
1203 | Lower Pedhi | Maharashtra | Amravati | HeadWorks | Dam | OnGoing | | 2020-10-16 14:01:19.0 | | |
1204 | Lower Pedhi | Maharashtra | Amravati | HeadWorks | Other | Complete | | 2020-10-16 14:03:05.0 | | |
1205 | Lower Pedhi | Maharashtra | Amravati | HeadWorks | Other | Complete | | 2020-10-16 14:04:20.0 | | |
1206 | Lower Pedhi | Maharashtra | Amravati | HeadWorks | Other | Complete | | 2020-10-16 14:12:55.0 | | |
1207 | Sardar Sarovar | Gujarat | Gandhinagar | Dam | HeadWorks | Complete | | 2020-10-20 11:19:50.0 | | |
1208 | Durgawati | Bihar | South East | Dam | HeadWorks | Complete | | 2020-10-20 14:07:36.0 | | |
1209 | SRSP St. II | Telangana | Nalgonda | Structure | Minors/ Sub-Minors | Complete | | 2020-10-29 11:39:43.0 | | |
1210 | SRSP St. II | Telangana | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-29 13:44:20.0 | | |
1211 | SRSP St. II | Telangana | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-29 13:45:39.0 | | |
1212 | SRSP St. II | Telangana | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-10-29 14:06:54.0 | | |
1213 | SRSP St. II | Telangana | Warangal | Main Canal | Main Canal | Complete | | 2020-10-29 15:31:18.0 | | |
1214 | SRSP St. II | Telangana | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-11-04 12:41:22.0 | | |
1215 | Palemvagu | Telangana | Khammam | Dam | HeadWorks | Complete | | 2020-11-04 12:51:56.0 | | |
1216 | SRSP St. II | Telangana | Khammam | HeadWorks | Dam | Complete | | 2020-11-04 13:02:58.0 | | |
1217 | SRSP St. II | Telangana | Khammam | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-11-04 13:43:38.0 | | |
1218 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | | 2020-11-23 14:31:00.0 | | |
1219 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2020-11-23 14:31:02.0 | | |
1220 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | | 2020-11-23 14:32:03.0 | | |
1221 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Structure | Complete | | 2020-11-23 14:34:05.0 | | |
1222 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Structure | Complete | | 2020-11-23 14:37:09.0 | | |
1223 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | | 2020-11-23 15:20:08.0 | | |
1224 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Structure | OnGoing | | 2020-11-23 15:46:22.0 | | |
1225 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | Complete | | 2020-11-23 16:21:42.0 | | |
1226 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | OnGoing | | 2020-11-23 16:31:29.0 | | |
1228 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Structure | OnGoing | | 2020-11-24 10:42:45.0 | | |
1229 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | OnGoing | | 2020-11-24 13:14:07.0 | | |
1230 | Sangola Branch Canal | Maharashtra | Solapur | Branch Canal | Branch Canal | OnGoing | | 2020-11-24 13:14:37.0 | | |
1231 | Sangola Branch Canal | Maharashtra | Solapur | Structure | Main Canal | Complete | | 2020-11-24 15:27:34.0 | | |
1232 | Sangola Branch Canal | Maharashtra | Solapur | Structure | Main Canal | Complete | | 2020-11-24 15:29:08.0 | | |
1233 | Sangola Branch Canal | Maharashtra | Solapur | Structure | Main Canal | OnGoing | | 2020-11-24 15:42:01.0 | | |
1234 | Sangola Branch Canal | Maharashtra | Solapur | Structure | Main Canal | OnGoing | | 2020-11-24 15:44:19.0 | | |
1235 | Krishna Koyna LIS | Maharashtra | Sangli | Branch Canal | Branch Canal | OnGoing | | 2020-11-25 11:49:40.0 | | |
1236 | Krishna Koyna LIS | Maharashtra | Sangli | Branch Canal | Branch Canal | OnGoing | | 2020-11-25 11:50:48.0 | | |
1237 | Sangola Branch Canal | Maharashtra | Sangli | Minors/ Sub-Minors | Outlet | OnGoing | | 2020-11-25 12:29:42.0 | | |
1238 | Sangola Branch Canal | Maharashtra | Sangli | Minors/ Sub-Minors | Outlet | OnGoing | | 2020-11-25 12:39:55.0 | | |
1239 | Sangola Branch Canal | Maharashtra | Sangli | Minors/ Sub-Minors | Outlet | OnGoing | | 2020-11-25 12:56:33.0 | | |
1240 | Sangola Branch Canal | Maharashtra | Sangli | Minors/ Sub-Minors | Outlet | OnGoing | | 2020-11-25 13:24:56.0 | | |
1241 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-25 14:36:58.0 | | |
1242 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-25 14:37:58.0 | | |
1243 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-25 14:44:39.0 | | |
1244 | Krishna Koyna LIS | Maharashtra | Sangli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-11-25 14:52:48.0 | | |
1245 | Krishna Koyna LIS | Maharashtra | Sangli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-11-25 15:06:25.0 | | |
1246 | Krishna Koyna LIS | Maharashtra | Sangli | Minors/ Sub-Minors | Any Other | Complete | | 2020-11-25 15:10:23.0 | | |
1247 | Krishna Koyna LIS | Maharashtra | Sangli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-11-25 15:27:29.0 | | |
1248 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2020-11-25 15:46:37.0 | | |
1249 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-25 15:51:45.0 | | |
1250 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2020-11-25 16:17:14.0 | | |
1251 | Krishna Koyna LIS | Maharashtra | Sangli | Branch Canal | Branch Canal | Complete | | 2020-11-25 16:23:22.0 | | |
1252 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2020-11-25 16:31:25.0 | | |
1253 | Krishna Koyna LIS | Maharashtra | Sangli | Branch Canal | Branch Canal | OnGoing | | 2020-11-25 16:51:42.0 | | |
1254 | Krishna Koyna LIS | Maharashtra | Sangli | Outlet | Main Canal | Complete | | 2020-11-25 17:42:27.0 | | |
1255 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-26 11:18:36.0 | | |
1256 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Any Other | Complete | | 2020-11-26 11:33:27.0 | | |
1257 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-26 12:14:27.0 | | |
1258 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-26 12:38:48.0 | | |
1259 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-26 12:56:55.0 | | |
1260 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Any Other | Complete | | 2020-11-26 13:17:10.0 | | |
1261 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Any Other | Complete | | 2020-11-26 13:17:10.0 | | |
1262 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-26 13:40:16.0 | | |
1263 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2020-11-26 13:40:41.0 | | |
1264 | Krishna Koyna LIS | Maharashtra | Sangli | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-11-26 14:11:02.0 | | |
1265 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Any Other | Complete | | 2020-11-26 15:52:30.0 | | |
1266 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | OnGoing | | 2020-11-26 16:04:27.0 | | |
1267 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Critical Issue / Bottleneck | Main Canal | Yet To Be Taken Up | | 2020-12-02 10:01:17.0 | | |
1268 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Critical Issue / Bottleneck | Main Canal | OnGoing | | 2020-12-02 10:10:37.0 | | |
1269 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Critical Issue / Bottleneck | Main Canal | Yet To Be Taken Up | | 2020-12-02 11:15:30.0 | | |
1270 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Main Canal | OnGoing | | 2020-12-02 11:16:38.0 | | |
1271 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Critical Issue / Bottleneck | Main Canal | Yet To Be Taken Up | | 2020-12-02 11:24:29.0 | | |
1272 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Main Canal | OnGoing | | 2020-12-02 11:44:33.0 | | |
1273 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Structure | Main Canal | OnGoing | | 2020-12-02 11:45:55.0 | | |
1274 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Critical Issue / Bottleneck | Main Canal | Yet To Be Taken Up | | 2020-12-02 11:55:12.0 | | |
1275 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Critical Issue / Bottleneck | OnGoing | | 2020-12-02 12:43:33.0 | | |
1276 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Structure | OnGoing | | 2020-12-02 13:13:18.0 | | |
1277 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Main Canal | Structure | OnGoing | | 2020-12-02 13:58:28.0 | | |
1278 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Main Canal | Structure | OnGoing | | 2020-12-02 14:13:14.0 | | |
1279 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Branch Canal | Branch Canal | OnGoing | | 2020-12-02 14:14:59.0 | | |
1280 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Barrage | HeadWorks | Complete | | 2020-12-02 14:36:06.0 | | |
1281 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Barrage | HeadWorks | Complete | | 2020-12-02 14:37:32.0 | | |
1282 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Barrage | HeadWorks | Complete | | 2020-12-02 14:40:20.0 | | |
1283 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | | 2020-12-02 14:55:55.0 | | |
1284 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | | 2020-12-02 16:05:55.0 | | |
1285 | Pench Diversion | Madhya Pradesh | Chhindwara | Distributaries | Distributaries | Complete | | 2020-12-03 10:54:15.0 | | |
1286 | Pench Diversion | Madhya Pradesh | Chhindwara | Any Other | Distributaries | Complete | | 2020-12-03 11:14:22.0 | | |
1287 | Pench Diversion | Madhya Pradesh | Chhindwara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-03 11:42:39.0 | | |
1288 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2020-12-04 11:46:22.0 | | |
1289 | Peddavagu @ Neelwai | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2020-12-04 12:27:33.0 | | |
1290 | Peddavagu @ Neelwai | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2020-12-04 12:27:56.0 | | |
1291 | Peddavagu @ Neelwai | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2020-12-04 12:31:09.0 | | |
1292 | Peddavagu @ Neelwai | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2020-12-04 12:33:42.0 | | |
1293 | Peddavagu @ Neelwai | Telangana | Adilabad | Distributaries | Distributaries | Complete | | 2020-12-04 12:54:18.0 | | |
1294 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | | 2020-12-04 13:06:22.0 | | |
1295 | Bawanthadi (MS) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-07 12:05:40.0 | | |
1296 | Bawanthadi (MS) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-07 12:08:12.0 | | |
1297 | Bawanthadi (MS) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-07 12:29:40.0 | | |
1298 | Bawanthadi (MS) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-07 12:29:49.0 | | |
1299 | Bawanthadi (MS) | Maharashtra | Bhandara | Critical Issue / Bottleneck | Distributaries | Complete | | 2020-12-07 16:33:25.0 | | |
1300 | Bawanthadi (MS) | Maharashtra | Bhandara | Distributaries | Distributaries | Complete | | 2020-12-07 16:37:28.0 | | |
1301 | Bawanthadi (MS) | Maharashtra | Bhandara | Distributaries | Distributaries | Complete | | 2020-12-07 16:45:51.0 | | |
1302 | Gosikhurd (NP) | Maharashtra | Bhandara | Other | HeadWorks | OnGoing | | 2020-12-08 12:08:31.0 | | |
1303 | Gosikhurd (NP) | Maharashtra | Bhandara | Other | HeadWorks | OnGoing | | 2020-12-08 12:09:15.0 | | |
1304 | Gosikhurd (NP) | Maharashtra | Bhandara | Main Canal | Main Canal | Yet To Be Taken Up | | 2020-12-08 12:17:46.0 | | |
1305 | Gosikhurd (NP) | Maharashtra | Bhandara | Main Canal | Main Canal | Yet To Be Taken Up | | 2020-12-08 12:22:39.0 | | |
1306 | Gosikhurd (NP) | Maharashtra | Bhandara | Main Canal | Main Canal | Yet To Be Taken Up | | 2020-12-08 12:23:59.0 | | |
1307 | Gosikhurd (NP) | Maharashtra | Bhandara | Main Canal | Main Canal | Yet To Be Taken Up | | 2020-12-08 12:36:24.0 | | |
1308 | Gosikhurd (NP) | Maharashtra | Bhandara | Other | HeadWorks | Complete | | 2020-12-08 12:48:29.0 | | |
1309 | Sardar Sarovar | Gujarat | Morbi | Structure | Branch Canal | Complete | | 2020-12-08 13:54:45.0 | | |
1310 | Sardar Sarovar | Gujarat | Morbi | Branch Canal | Branch Canal | Complete | | 2020-12-08 14:06:44.0 | | |
1311 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2020-12-08 14:11:13.0 | | |
1312 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2020-12-08 14:12:24.0 | | |
1313 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2020-12-08 14:17:28.0 | | |
1314 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2020-12-08 14:18:57.0 | | |
1315 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | Complete | | 2020-12-08 16:06:40.0 | | |
1316 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | Complete | | 2020-12-08 16:21:39.0 | | |
1317 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | Complete | | 2020-12-08 16:24:50.0 | | |
1318 | Sardar Sarovar | Gujarat | Kachchh | Structure | Branch Canal | OnGoing | | 2020-12-09 09:56:36.0 | | |
1319 | Sardar Sarovar | Gujarat | Kachchh | Structure | Branch Canal | OnGoing | | 2020-12-09 10:48:49.0 | | |
1320 | Sardar Sarovar | Gujarat | Kachchh | Structure | Branch Canal | OnGoing | | 2020-12-09 12:21:39.0 | | |
1341 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | Complete | | 2020-12-15 17:30:39.0 | | |
1321 | Sardar Sarovar | Gujarat | Kachchh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-09 13:10:16.0 | | |
1322 | Sardar Sarovar | Gujarat | Kachchh | Critical Issue / Bottleneck | Branch Canal | Yet To Be Taken Up | | 2020-12-09 15:07:10.0 | | |
1323 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Critical Issue / Bottleneck | Yet To Be Taken Up | | 2020-12-14 13:07:23.0 | | |
1324 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | | 2020-12-14 13:16:04.0 | | |
1325 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | Yet To Be Taken Up | | 2020-12-14 13:35:38.0 | | |
1326 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | | 2020-12-14 15:30:10.0 | | |
1327 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | | 2020-12-14 15:39:20.0 | | |
1328 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | | 2020-12-14 16:02:05.0 | | |
1329 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | | 2020-12-14 16:05:08.0 | | |
1330 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Structure | OnGoing | | 2020-12-14 16:57:48.0 | | |
1331 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Structure | Complete | | 2020-12-14 17:53:04.0 | | |
1332 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Main Canal | Main Canal | Complete | | 2020-12-15 11:17:08.0 | | |
1333 | Karanja | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | | 2020-12-15 13:06:19.0 | | |
1334 | Karanja | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | | 2020-12-15 13:26:25.0 | | |
1335 | Upper Tunga | Karnataka | Haveri | Main Canal | Main Canal | OnGoing | | 2020-12-15 13:30:17.0 | | |
1336 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Distributaries | Distributaries | Complete | | 2020-12-15 13:35:26.0 | | |
1337 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Distributaries | Distributaries | Complete | | 2020-12-15 13:36:07.0 | | |
1338 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Distributaries | Complete | | 2020-12-15 16:45:12.0 | | |
1339 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Other | HeadWorks | Complete | | 2020-12-15 17:03:57.0 | | |
1340 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Other | HeadWorks | OnGoing | | 2020-12-15 17:27:25.0 | | |
1342 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Other | HeadWorks | OnGoing | | 2020-12-15 17:45:39.0 | | |
1343 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Distributaries | OnGoing | | 2020-12-16 11:18:16.0 | | |
1344 | Mod. of Gang Canal | Rajasthan | Ganganagar | Outlet | Minors/ Sub-Minors | OnGoing | | 2020-12-16 13:31:04.0 | | |
1345 | Arjuna Project | Maharashtra | Ratnagiri | Dam | HeadWorks | Complete | | 2020-12-17 10:44:40.0 | | |
1346 | Arjuna Project | Maharashtra | Ratnagiri | HeadWorks | Other | OnGoing | | 2020-12-17 13:08:13.0 | | |
1347 | Arjuna Project | Maharashtra | Ratnagiri | HeadWorks | Other | Complete | | 2020-12-17 13:08:16.0 | | |
1348 | Arjuna Project | Maharashtra | Ratnagiri | Branch Canal | Branch Canal | OnGoing | | 2020-12-17 17:29:00.0 | | |
1349 | J. Chokka Rao LIS | Telangana | Warangal | Structure | Main Canal | Complete | | 2020-12-18 10:12:09.0 | | |
1350 | J. Chokka Rao LIS | Telangana | Warangal | Structure | Branch Canal | Complete | | 2020-12-18 10:28:50.0 | | |
1351 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Other | Complete | | 2020-12-18 11:04:24.0 | | |
1352 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Other | Complete | | 2020-12-18 11:09:35.0 | | |
1353 | J. Chokka Rao LIS | Telangana | Warangal | Distributaries | Distributaries | Complete | | 2020-12-18 11:13:42.0 | | |
1354 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Other | Complete | | 2020-12-18 11:15:25.0 | | |
1355 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Other | Complete | | 2020-12-18 11:21:55.0 | | |
1356 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Other | Complete | | 2020-12-18 11:23:51.0 | | |
1357 | J. Chokka Rao LIS | Telangana | Warangal | Structure | Branch Canal | OnGoing | | 2020-12-18 11:47:12.0 | | |
1358 | J. Chokka Rao LIS | Telangana | Warangal | Structure | Branch Canal | OnGoing | | 2020-12-18 11:59:05.0 | | |
1359 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Other | Complete | | 2020-12-18 12:45:07.0 | | |
1360 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Dam | OnGoing | | 2020-12-18 12:47:00.0 | | |
1361 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Other | OnGoing | | 2020-12-18 12:57:52.0 | | |
1362 | Tadipudi LIS | Andhra Pradesh | West Godavari | Main Canal | Main Canal | Complete | | 2020-12-18 14:36:13.0 | | |
1363 | Tadipudi LIS | Andhra Pradesh | West Godavari | Main Canal | Main Canal | Complete | | 2020-12-18 14:38:53.0 | | |
1364 | Tadipudi LIS | Andhra Pradesh | West Godavari | Distributaries | Distributaries | Complete | | 2020-12-18 14:59:46.0 | | |
1365 | Tadipudi LIS | Andhra Pradesh | West Godavari | Main Canal | Main Canal | Complete | | 2020-12-18 15:10:49.0 | | |
1366 | Tadipudi LIS | Andhra Pradesh | West Godavari | Critical Issue / Bottleneck | Distributaries | Yet To Be Taken Up | | 2020-12-18 15:14:59.0 | | |
1367 | Tadipudi LIS | Andhra Pradesh | West Godavari | Structure | Main Canal | Complete | | 2020-12-18 15:30:16.0 | | |
1368 | Tadipudi LIS | Andhra Pradesh | West Godavari | Structure | Main Canal | Complete | | 2020-12-18 15:46:11.0 | | |
1369 | J. Chokka Rao LIS | Telangana | Warangal | Any Other | Main Canal | OnGoing | | 2020-12-18 15:48:05.0 | | |
1370 | Aruna Project | Maharashtra | Sindhudurg | Main Canal | Main Canal | Complete | | 2020-12-18 15:58:03.0 | | |
1371 | J. Chokka Rao LIS | Telangana | Warangal | Structure | Main Canal | OnGoing | | 2020-12-18 16:34:25.0 | | |
1372 | Thoubal | Manipur | Senapati | HeadWorks | Other | OnGoing | | 2020-12-18 16:40:50.0 | | |
1373 | J. Chokka Rao LIS | Telangana | Warangal | Distributaries | Distributaries | OnGoing | | 2020-12-19 11:19:26.0 | | |
1374 | Tadipudi LIS | Andhra Pradesh | West Godavari | Main Canal | Main Canal | Complete | | 2020-12-19 11:38:19.0 | | |
1375 | Tadipudi LIS | Andhra Pradesh | West Godavari | Structure | Main Canal | Complete | | 2020-12-19 11:39:37.0 | | |
1376 | J. Chokka Rao LIS | Telangana | Warangal | Distributaries | Distributaries | OnGoing | | 2020-12-19 11:39:42.0 | | |
1377 | Tadipudi LIS | Andhra Pradesh | West Godavari | Structure | Main Canal | Complete | | 2020-12-19 11:46:22.0 | | |
1378 | J. Chokka Rao LIS | Telangana | Warangal | Structure | Distributaries | Complete | | 2020-12-19 11:49:03.0 | | |
1379 | Tadipudi LIS | Andhra Pradesh | West Godavari | Distributaries | Distributaries | Complete | | 2020-12-19 11:50:32.0 | | |
1380 | J. Chokka Rao LIS | Telangana | Warangal | Distributaries | Distributaries | OnGoing | | 2020-12-19 12:46:56.0 | | |
1381 | J. Chokka Rao LIS | Telangana | Warangal | Structure | Distributaries | OnGoing | | 2020-12-19 12:56:41.0 | | |
1416 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | Complete | | 2020-12-23 15:12:26.0 | | |
1382 | J. Chokka Rao LIS | Telangana | Warangal | Outlet | Minors/ Sub-Minors | OnGoing | | 2020-12-19 13:05:38.0 | | |
1383 | J. Chokka Rao LIS | Telangana | Warangal | Outlet | Minors/ Sub-Minors | Complete | | 2020-12-19 13:29:11.0 | | |
1384 | J. Chokka Rao LIS | Telangana | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-19 13:38:37.0 | | |
1385 | J. Chokka Rao LIS | Telangana | Warangal | Structure | Minors/ Sub-Minors | Complete | | 2020-12-19 13:41:14.0 | | |
1386 | Nardave (Mahammadwadi) | Maharashtra | Sindhudurg | HeadWorks | Dam | OnGoing | | 2020-12-19 16:12:45.0 | | |
1387 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-21 10:59:02.0 | | |
1388 | Indira Sagar Project Canal Ph I & II (Km. 0 to Km. 142) | Madhya Pradesh | East Nimar | Any Other | Minors/ Sub-Minors | Complete | | 2020-12-21 11:02:49.0 | | |
1389 | Indira Sagar Project Canal Ph I & II (Km. 0 to Km. 142) | Madhya Pradesh | East Nimar | Any Other | Minors/ Sub-Minors | Complete | | 2020-12-21 11:51:12.0 | | |
1390 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Main Canal | Main Canal | Complete | | 2020-12-21 12:01:51.0 | | |
1391 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-21 12:45:20.0 | | |
1392 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-21 12:45:40.0 | | |
1393 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-21 13:00:22.0 | | |
1394 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-21 13:00:24.0 | | |
1395 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-21 13:00:29.0 | | |
1417 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | Complete | | 2020-12-23 15:18:08.0 | | |
1530 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-02-03 12:38:49.0 | | |
1396 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-21 13:00:34.0 | | |
1397 | Tillari (MH) | Maharashtra | Sindhudurg | Main Canal | Main Canal | OnGoing | | 2020-12-21 19:16:32.0 | | |
1398 | Tillari (MH) | Maharashtra | North Goa | Main Canal | Main Canal | OnGoing | | 2020-12-21 19:16:35.0 | | |
1399 | Indira Sagar Project Canal Ph III (Km. 143 to Km. 206) | Madhya Pradesh | West Nimar | Any Other | Minors/ Sub-Minors | Complete | | 2020-12-22 13:28:17.0 | | |
1400 | Indira Sagar Project Canal Ph III (Km. 143 to Km. 206) | Madhya Pradesh | West Nimar | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-22 14:23:22.0 | | |
1401 | Indira Sagar Project Canal Ph III (Km. 143 to Km. 206) | Madhya Pradesh | Barwani | Distributaries | Distributaries | Complete | | 2020-12-22 14:29:12.0 | | |
1402 | Indira Sagar Project Canal Ph IV (Km. 206 to Km. 243) | Madhya Pradesh | Barwani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-23 11:02:59.0 | | |
1403 | Indira Sagar Project Canal Ph IV (Km. 206 to Km. 243) | Madhya Pradesh | Barwani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2020-12-23 11:16:10.0 | | |
1404 | Kelo | Chhattisgarh | Janjgir - Champa | Outlet | Minors/ Sub-Minors | OnGoing | | 2020-12-23 11:26:00.0 | | |
1405 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2020-12-23 11:40:13.0 | | |
1406 | Indira Sagar Project Canal Ph IV (Km. 206 to Km. 243) | Madhya Pradesh | Barwani | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2020-12-23 11:41:07.0 | | |
1407 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2020-12-23 12:10:50.0 | | |
1408 | Indira Sagar Project Canal Ph IV (Km. 206 to Km. 243) | Madhya Pradesh | Barwani | Distributaries | Distributaries | Complete | | 2020-12-23 12:33:55.0 | | |
1409 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | Complete | | 2020-12-23 12:58:14.0 | | |
1410 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2020-12-23 13:12:00.0 | | |
1411 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2020-12-23 13:23:08.0 | | |
1412 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2020-12-23 13:33:50.0 | | |
1413 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2020-12-23 14:08:40.0 | | |
1414 | Kelo | Chhattisgarh | Raigarh | Structure | Main Canal | Complete | | 2020-12-23 14:41:43.0 | | |
1415 | Kelo | Chhattisgarh | Raigarh | Main Canal | Main Canal | Complete | | 2020-12-23 14:44:12.0 | | |
1418 | Kelo | Chhattisgarh | Raigarh | Main Canal | Main Canal | Complete | | 2020-12-23 15:33:09.0 | | |
1419 | Kelo | Chhattisgarh | Raigarh | Main Canal | Main Canal | Complete | | 2020-12-23 15:36:23.0 | | |
1420 | Kelo | Chhattisgarh | Raigarh | Dam | HeadWorks | Complete | | 2020-12-23 17:43:12.0 | | |
1421 | Kelo | Chhattisgarh | Raigarh | Dam | HeadWorks | Complete | | 2020-12-23 17:45:55.0 | | |
1422 | Kelo | Chhattisgarh | Raigarh | Dam | HeadWorks | Complete | | 2020-12-23 17:48:16.0 | | |
1423 | Lower Dudhana | Maharashtra | Parbhani | Structure | Distributaries | OnGoing | | 2021-01-12 10:24:11.0 | | |
1424 | Lower Dudhana | Maharashtra | Parbhani | Distributaries | Distributaries | OnGoing | | 2021-01-12 10:42:48.0 | | |
1425 | Lower Dudhana | Maharashtra | Parbhani | Distributaries | Distributaries | Complete | | 2021-01-12 11:05:57.0 | | |
1426 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-12 11:08:46.0 | | |
1427 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-01-12 11:24:05.0 | | |
1428 | Palemvagu | Telangana | Khammam | Dam | HeadWorks | Complete | | 2021-01-12 12:24:03.0 | | |
1429 | Palemvagu | Telangana | Khammam | Dam | HeadWorks | Complete | | 2021-01-12 12:30:00.0 | | |
1430 | Palemvagu | Telangana | Khammam | Dam | HeadWorks | Complete | | 2021-01-12 12:30:00.0 | | |
1431 | Lower Dudhana | Maharashtra | Parbhani | Main Canal | Main Canal | Complete | | 2021-01-12 13:09:30.0 | | |
1432 | Lower Dudhana | Maharashtra | Parbhani | Main Canal | Main Canal | Complete | | 2021-01-12 13:10:50.0 | | |
1433 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-12 13:15:53.0 | | |
1434 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-12 13:36:07.0 | | |
1435 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-12 13:37:04.0 | | |
1436 | Palemvagu | Telangana | Khammam | Main Canal | Main Canal | Complete | | 2021-01-12 13:37:39.0 | | |
1437 | Palemvagu | Telangana | Khammam | Distributaries | Distributaries | OnGoing | | 2021-01-12 13:40:15.0 | | |
1438 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-12 13:41:51.0 | | |
1439 | Palemvagu | Telangana | Khammam | Distributaries | Distributaries | Complete | | 2021-01-12 13:42:38.0 | | |
1440 | Lower Dudhana | Maharashtra | Parbhani | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-01-13 11:22:54.0 | | |
1441 | Lower Dudhana | Maharashtra | Parbhani | Any Other | Minors/ Sub-Minors | Complete | | 2021-01-13 11:39:44.0 | | |
1442 | Lower Dudhana | Maharashtra | Parbhani | Any Other | Minors/ Sub-Minors | Complete | | 2021-01-13 11:40:42.0 | | |
1443 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 11:56:25.0 | | |
1444 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 11:57:26.0 | | |
1445 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | Complete | | 2021-01-19 12:08:25.0 | | |
1446 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 12:47:49.0 | | |
1447 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 13:01:16.0 | | |
1448 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 13:02:03.0 | | |
1449 | Upper Penganga | Maharashtra | Nanded | Any Other | Distributaries | OnGoing | | 2021-01-19 13:17:23.0 | | |
1450 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 14:14:28.0 | | |
1451 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 14:15:31.0 | | |
1452 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 14:16:45.0 | | |
1453 | Upper Penganga | Maharashtra | Nanded | Distributaries | Distributaries | OnGoing | | 2021-01-19 14:17:08.0 | | |
1454 | Upper Penganga | Maharashtra | Nanded | Branch Canal | Branch Canal | OnGoing | | 2021-01-19 15:36:41.0 | | |
1455 | Upper Penganga | Maharashtra | Nanded | Branch Canal | Branch Canal | OnGoing | | 2021-01-19 15:37:10.0 | | |
1456 | Upper Penganga | Maharashtra | Nanded | Branch Canal | Branch Canal | OnGoing | | 2021-01-19 15:42:00.0 | | |
1457 | Upper Penganga | Maharashtra | Yavatmal | Distributaries | Distributaries | Complete | | 2021-01-20 11:59:27.0 | | |
1458 | Upper Penganga | Maharashtra | Yavatmal | Distributaries | Distributaries | Complete | | 2021-01-20 11:59:50.0 | | |
1459 | Upper Penganga | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-01-20 12:53:46.0 | | |
1482 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | Complete | | 2021-01-30 15:21:01.0 | | |
1460 | Upper Penganga | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-01-20 12:54:16.0 | | |
1461 | Mahi Project | Madhya Pradesh | Jhabua | Any Other | Minors/ Sub-Minors | Complete | | 2021-01-22 13:31:07.0 | | |
1462 | Mahi Project | Madhya Pradesh | Jhabua | Any Other | Minors/ Sub-Minors | Complete | | 2021-01-22 14:10:32.0 | | |
1463 | Mahi Project | Madhya Pradesh | Jhabua | Any Other | Minors/ Sub-Minors | Complete | | 2021-01-22 14:30:42.0 | | |
1464 | Mahi Project | Madhya Pradesh | Jhabua | Any Other | Minors/ Sub-Minors | Complete | | 2021-01-22 15:04:10.0 | | |
1465 | Wang | Maharashtra | Satara | Other | HeadWorks | Complete | | 2021-01-27 13:05:25.0 | | |
1466 | Wang | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-01-27 13:38:34.0 | | |
1467 | Wang | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-01-27 13:39:17.0 | | |
1468 | Wang | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-01-27 13:50:52.0 | | |
1469 | Wang | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-01-27 13:52:59.0 | | |
1470 | Wang | Maharashtra | Satara | Other | HeadWorks | Complete | | 2021-01-27 14:16:13.0 | | |
1471 | Wang | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-01-27 14:22:46.0 | | |
1472 | Wang | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-01-27 14:23:21.0 | | |
1473 | Wang | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-01-27 14:24:17.0 | | |
1474 | Wang | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-01-27 15:00:54.0 | | |
1475 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-01-28 12:40:38.0 | | |
1476 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-01-28 12:41:08.0 | | |
1477 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-01-28 12:41:51.0 | | |
1478 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-01-28 12:59:03.0 | | |
1479 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-01-28 13:07:45.0 | | |
1480 | Morna (Gureghar) | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-01-28 13:25:29.0 | | |
1481 | Dhom Balkawadi | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-01-30 15:19:23.0 | | |
1483 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | Complete | | 2021-01-30 15:28:14.0 | | |
1484 | Dhom Balkawadi | Maharashtra | Satara | Outlet | Distributaries | Complete | | 2021-01-30 15:37:30.0 | | |
1485 | Dhom Balkawadi | Maharashtra | Satara | Structure | Distributaries | Complete | | 2021-01-30 15:43:59.0 | | |
1486 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-30 15:54:03.0 | | |
1487 | Dhom Balkawadi | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-01-30 16:28:57.0 | | |
1488 | Dhom Balkawadi | Maharashtra | Satara | Structure | Distributaries | Complete | | 2021-01-30 16:30:23.0 | | |
1489 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | Complete | | 2021-01-30 16:43:22.0 | | |
1490 | Dhom Balkawadi | Maharashtra | Satara | Outlet | Distributaries | Complete | | 2021-01-30 17:33:56.0 | | |
1491 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-01-31 10:46:23.0 | | |
1492 | Dhom Balkawadi | Maharashtra | Satara | Outlet | Distributaries | Complete | | 2021-01-31 11:21:30.0 | | |
1493 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | Complete | | 2021-01-31 11:27:56.0 | | |
1494 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-31 11:40:36.0 | | |
1495 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | Complete | | 2021-01-31 12:43:12.0 | | |
1496 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-31 12:56:38.0 | | |
1497 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-01-31 13:22:25.0 | | |
1498 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | OnGoing | | 2021-01-31 15:22:53.0 | | |
1499 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-31 15:59:33.0 | | |
1500 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-31 16:17:02.0 | | |
1501 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-01-31 16:33:35.0 | | |
1502 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | Complete | | 2021-01-31 17:39:10.0 | | |
1503 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | Complete | | 2021-01-31 17:56:06.0 | | |
1504 | Dhom Balkawadi | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-01-31 17:57:04.0 | | |
1505 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-01 11:21:59.0 | | |
1506 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-01 11:31:47.0 | | |
1507 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-01 11:53:42.0 | | |
1508 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-01 12:24:16.0 | | |
1509 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-01 12:31:23.0 | | |
1510 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-01 12:40:16.0 | | |
1511 | Dhom Balkawadi | Maharashtra | Satara | Main Canal | Structure | Complete | | 2021-02-01 14:33:52.0 | | |
1512 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-01 15:22:37.0 | | |
1513 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-01 15:22:37.0 | | |
1514 | Dhom Balkawadi | Maharashtra | Satara | Distributaries | Distributaries | Complete | | 2021-02-02 09:22:04.0 | | |
1515 | Dhom Balkawadi | Maharashtra | Satara | Structure | Main Canal | Complete | | 2021-02-02 13:35:50.0 | | |
1516 | Dhom Balkawadi | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-02 13:47:16.0 | | |
1517 | Dhom Balkawadi | Maharashtra | Pune | Main Canal | Main Canal | Complete | | 2021-02-02 19:07:31.0 | | |
1518 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-02-03 10:45:13.0 | | |
1519 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-03 10:53:03.0 | | |
1520 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-03 10:53:50.0 | | |
1521 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-03 10:56:05.0 | | |
1522 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-02-03 11:09:11.0 | | |
1523 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-02-03 11:22:11.0 | | |
1524 | Kudali | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-02-03 12:04:22.0 | | |
1525 | Kudali | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-02-03 12:05:17.0 | | |
1526 | Kudali | Maharashtra | Satara | Other | HeadWorks | OnGoing | | 2021-02-03 12:14:44.0 | | |
1527 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-02-03 12:31:43.0 | | |
1528 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-02-03 12:32:52.0 | | |
1529 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-02-03 12:38:10.0 | | |
1531 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-03 12:47:31.0 | | |
1532 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-03 12:49:57.0 | | |
1533 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-03 13:01:22.0 | | |
1534 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-03 13:24:06.0 | | |
1535 | Sri Komarambheem | Telangana | Adilabad | Structure | Distributaries | Complete | | 2021-02-03 14:33:14.0 | | |
1536 | Sri Komarambheem | Telangana | Adilabad | Structure | Distributaries | Complete | | 2021-02-03 14:36:15.0 | | |
1537 | Sri Komarambheem | Telangana | Adilabad | Structure | Distributaries | Complete | | 2021-02-03 14:37:36.0 | | |
1538 | Sri Komarambheem | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2021-02-03 14:55:46.0 | | |
1539 | Sri Komarambheem | Telangana | Adilabad | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-03 15:37:23.0 | | |
1540 | Sri Komarambheem | Telangana | Adilabad | Distributaries | Distributaries | Complete | | 2021-02-03 15:47:01.0 | | |
1541 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-04 14:00:25.0 | | |
1542 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-04 14:37:24.0 | | |
1543 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-04 14:52:29.0 | | |
1544 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-04 14:59:57.0 | | |
1545 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-02-04 15:21:10.0 | | |
1546 | Tarali | Maharashtra | Satara | Outlet | Main Canal | Complete | | 2021-02-04 15:33:24.0 | | |
1547 | Tarali | Maharashtra | Satara | Outlet | Main Canal | Complete | | 2021-02-04 15:40:52.0 | | |
1548 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-02-04 16:54:09.0 | | |
1549 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-02-04 18:21:41.0 | | |
1550 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-02-04 18:27:11.0 | | |
1551 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-02-04 18:46:23.0 | | |
1552 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-02-04 18:47:39.0 | | |
1553 | Tarali | Maharashtra | Satara | Other | HeadWorks | OnGoing | | 2021-02-05 11:36:54.0 | | |
1554 | Tarali | Maharashtra | Satara | Other | HeadWorks | OnGoing | | 2021-02-05 11:39:22.0 | | |
1555 | Dhansiri | Assam | Udalguri | Distributaries | Distributaries | OnGoing | | 2021-02-10 12:14:54.0 | | |
1556 | Dhansiri | Assam | Udalguri | Distributaries | Distributaries | OnGoing | | 2021-02-10 12:23:07.0 | | |
1557 | Dhansiri | Assam | Udalguri | Distributaries | Distributaries | OnGoing | | 2021-02-10 12:47:14.0 | | |
1558 | Dhansiri | Assam | Udalguri | Distributaries | Distributaries | OnGoing | | 2021-02-10 13:20:53.0 | | |
1559 | Dhansiri | Assam | Udalguri | Distributaries | Distributaries | Complete | | 2021-02-10 13:32:42.0 | | |
1560 | Dhansiri | Assam | Udalguri | Distributaries | Distributaries | Complete | | 2021-02-10 14:01:07.0 | | |
1561 | Dhansiri | Assam | Udalguri | Distributaries | Distributaries | Complete | | 2021-02-10 14:03:14.0 | | |
1562 | Khadakpurna | Maharashtra | Buldana | Structure | Main Canal | Complete | | 2021-02-16 12:50:29.0 | | |
1563 | Khadakpurna | Maharashtra | Buldana | Main Canal | Main Canal | Complete | | 2021-02-16 12:57:59.0 | | |
1564 | Khadakpurna | Maharashtra | Buldana | Structure | Minors/ Sub-Minors | Complete | | 2021-02-16 13:06:42.0 | | |
1565 | Khadakpurna | Maharashtra | Buldana | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-16 13:36:58.0 | | |
1566 | Khadakpurna | Maharashtra | Buldana | Main Canal | Main Canal | Complete | | 2021-02-16 14:23:31.0 | | |
1567 | Khadakpurna | Maharashtra | Buldana | Main Canal | Main Canal | Complete | | 2021-02-16 14:24:29.0 | | |
1568 | Khadakpurna | Maharashtra | Buldana | Distributaries | Distributaries | OnGoing | | 2021-02-16 16:05:49.0 | | |
1569 | Khadakpurna | Maharashtra | Buldana | Main Canal | Main Canal | Complete | | 2021-02-17 10:12:53.0 | | |
1570 | Khadakpurna | Maharashtra | Buldana | Main Canal | Main Canal | OnGoing | | 2021-02-17 10:20:49.0 | | |
1571 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | | 2021-02-22 14:34:06.0 | | |
1572 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | | 2021-02-22 14:36:21.0 | | |
1573 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Distributaries | Distributaries | Yet To Be Taken Up | | 2021-02-22 14:45:02.0 | | |
1574 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Distributaries | Distributaries | OnGoing | | 2021-02-22 15:36:13.0 | | |
1575 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Distributaries | Distributaries | OnGoing | | 2021-02-22 15:50:11.0 | | |
1576 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Distributaries | Distributaries | OnGoing | | 2021-02-22 15:52:01.0 | | |
1577 | Subernarekha Multipurpose | Jharkhand | New Delhi | Structure | Branch Canal | Complete | | 2021-02-22 17:57:09.0 | | |
1578 | Warna | Maharashtra | South East | Dam | HeadWorks | OnGoing | | 2021-02-22 18:03:05.0 | | |
1579 | Sardar Sarovar | Gujarat | South East | Dam | HeadWorks | Complete | | 2021-02-23 09:59:27.0 | | |
1580 | Sardar Sarovar | Gujarat | South East | Structure | Branch Canal | Complete | | 2021-02-23 10:24:17.0 | | |
1581 | Bansagar Unit - II | Madhya Pradesh | Satna | Any Other | Minors/ Sub-Minors | Complete | | 2021-02-24 12:05:00.0 | | |
1582 | Bansagar Unit - II | Madhya Pradesh | Satna | Any Other | Minors/ Sub-Minors | Complete | | 2021-02-24 12:48:26.0 | | |
1583 | Bansagar Unit - II | Madhya Pradesh | Satna | Any Other | Minors/ Sub-Minors | Complete | | 2021-02-24 13:13:07.0 | | |
1584 | Mahan Project | Madhya Pradesh | Sidhi | Any Other | Minors/ Sub-Minors | Complete | | 2021-02-25 12:08:18.0 | | |
1585 | Mahan Project | Madhya Pradesh | Sidhi | Any Other | Minors/ Sub-Minors | Complete | | 2021-02-25 12:52:38.0 | | |
1586 | Mahan Project | Madhya Pradesh | Sidhi | Any Other | Minors/ Sub-Minors | Complete | | 2021-02-25 16:48:44.0 | | |
1587 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2021-02-26 13:28:01.0 | | |
1588 | Peddavagu @ Neelwai | Telangana | Adilabad | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-02-26 14:32:38.0 | | |
1589 | Peddavagu @ Neelwai | Telangana | Adilabad | Distributaries | Distributaries | Complete | | 2021-02-26 14:54:12.0 | | |
1590 | Peddavagu @ Neelwai | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2021-02-26 15:11:43.0 | | |
1591 | Peddavagu @ Neelwai | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2021-02-26 15:12:13.0 | | |
1592 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2021-02-26 15:13:55.0 | | |
1593 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-03 11:20:47.0 | | |
1594 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-03 11:24:09.0 | | |
1595 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-03 11:25:01.0 | | |
1596 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-03 11:48:48.0 | | |
1659 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Main Canal | Complete | | 2021-03-04 18:00:01.0 | | |
1597 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-03 11:50:19.0 | | |
1598 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:11:50.0 | | |
1599 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:12:47.0 | | |
1600 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:18:49.0 | | |
1601 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:19:55.0 | | |
1602 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:25:02.0 | | |
1603 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:25:52.0 | | |
1604 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:29:30.0 | | |
1605 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:35:10.0 | | |
1606 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:36:01.0 | | |
1607 | Kharung (ERM) | Chhattisgarh | Bilaspur | Any Other | Minors/ Sub-Minors | OnGoing | | 2021-03-03 12:59:39.0 | | |
1608 | Kharung (ERM) | Chhattisgarh | Bilaspur | Any Other | Minors/ Sub-Minors | OnGoing | | 2021-03-03 13:00:38.0 | | |
1609 | Kharung (ERM) | Chhattisgarh | Bilaspur | Any Other | Minors/ Sub-Minors | OnGoing | | 2021-03-03 13:03:22.0 | | |
1610 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | OnGoing | | 2021-03-03 13:34:57.0 | | |
1611 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 13:39:10.0 | | |
1612 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 15:29:01.0 | | |
1613 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2021-03-03 15:30:16.0 | | |
1614 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 15:36:38.0 | | |
1615 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 15:38:21.0 | | |
1616 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 15:39:06.0 | | |
1617 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 15:57:19.0 | | |
1618 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 15:57:51.0 | | |
1619 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 16:00:32.0 | | |
1620 | Kharung (ERM) | Chhattisgarh | Bilaspur | Outlet | Distributaries | OnGoing | | 2021-03-03 16:01:10.0 | | |
1621 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-03 16:03:21.0 | | |
1622 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-03 16:33:28.0 | | |
1623 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-03 16:35:25.0 | | |
1624 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-03 16:40:02.0 | | |
1625 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-03 16:42:06.0 | | |
1626 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-03 16:49:10.0 | | |
1627 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-03 16:52:09.0 | | |
1628 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 12:57:54.0 | | |
1629 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 12:59:02.0 | | |
1630 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 12:59:36.0 | | |
1631 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 13:17:55.0 | | |
1632 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 13:19:35.0 | | |
1633 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 13:33:32.0 | | |
1634 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 13:34:40.0 | | |
1635 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 13:49:43.0 | | |
1636 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 13:50:55.0 | | |
1637 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 13:55:22.0 | | |
1638 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 13:56:05.0 | | |
1639 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 14:02:46.0 | | |
1640 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 14:04:03.0 | | |
1641 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-04 14:16:19.0 | | |
1642 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-04 14:17:12.0 | | |
1643 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 14:31:25.0 | | |
1644 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 14:32:11.0 | | |
1645 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | Complete | | 2021-03-04 14:43:14.0 | | |
1646 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-04 14:44:30.0 | | |
1647 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-04 14:50:59.0 | | |
1648 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-04 14:51:45.0 | | |
1649 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 17:22:15.0 | | |
1650 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 17:22:45.0 | | |
1651 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 17:23:25.0 | | |
1652 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 17:25:02.0 | | |
1653 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 17:26:48.0 | | |
1654 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | Complete | | 2021-03-04 17:27:35.0 | | |
1655 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Distributaries | Complete | | 2021-03-04 17:29:38.0 | | |
1656 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Main Canal | Complete | | 2021-03-04 17:38:14.0 | | |
1657 | Kharung (ERM) | Chhattisgarh | Bilaspur | Main Canal | Main Canal | Complete | | 2021-03-04 17:40:17.0 | | |
1658 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Main Canal | Complete | | 2021-03-04 17:51:33.0 | | |
1660 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-10 12:24:01.0 | | |
1661 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-10 12:25:32.0 | | |
1662 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-10 12:30:24.0 | | |
1663 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-10 12:34:03.0 | | |
1664 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-10 13:15:19.0 | | |
1665 | Gosikhurd (NP) | Maharashtra | Bhandara | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-10 13:24:25.0 | | |
1666 | Gosikhurd (NP) | Maharashtra | Bhandara | Structure | Minors/ Sub-Minors | Complete | | 2021-03-10 13:40:52.0 | | |
1667 | Gosikhurd (NP) | Maharashtra | Bhandara | Structure | Minors/ Sub-Minors | Complete | | 2021-03-10 13:41:29.0 | | |
1668 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-10 13:53:23.0 | | |
1669 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-10 13:53:46.0 | | |
1670 | Gosikhurd (NP) | Maharashtra | Chandrapur | Structure | Branch Canal | OnGoing | | 2021-03-10 16:40:16.0 | | |
1671 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2021-03-10 16:41:21.0 | | |
1672 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2021-03-10 16:59:18.0 | | |
1673 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2021-03-10 16:59:40.0 | | |
1674 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2021-03-11 08:49:07.0 | | |
1675 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2021-03-11 08:50:36.0 | | |
1676 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2021-03-11 08:51:53.0 | | |
1677 | Gosikhurd (NP) | Maharashtra | Chandrapur | Structure | Branch Canal | Complete | | 2021-03-11 09:03:10.0 | | |
1678 | Gosikhurd (NP) | Maharashtra | Chandrapur | Branch Canal | Branch Canal | OnGoing | | 2021-03-11 09:04:38.0 | | |
1679 | Gosikhurd (NP) | Maharashtra | Chandrapur | Structure | Branch Canal | OnGoing | | 2021-03-11 09:54:43.0 | | |
1680 | Gosikhurd (NP) | Maharashtra | Chandrapur | Structure | Branch Canal | OnGoing | | 2021-03-11 09:55:49.0 | | |
1681 | Gosikhurd (NP) | Maharashtra | Chandrapur | Structure | Branch Canal | Complete | | 2021-03-11 10:21:05.0 | | |
1682 | Gosikhurd (NP) | Maharashtra | Chandrapur | Outlet | Branch Canal | OnGoing | | 2021-03-11 11:16:26.0 | | |
1683 | Gosikhurd (NP) | Maharashtra | Chandrapur | Structure | Branch Canal | Complete | | 2021-03-11 11:23:58.0 | | |
1684 | Bawanthadi (MS) | Maharashtra | Bhandara | Structure | Minors/ Sub-Minors | Complete | | 2021-03-12 13:16:11.0 | | |
1685 | Bawanthadi (MS) | Maharashtra | Bhandara | Structure | Minors/ Sub-Minors | Complete | | 2021-03-12 13:16:48.0 | | |
1686 | Bawanthadi (MS) | Maharashtra | Bhandara | Structure | Minors/ Sub-Minors | Complete | | 2021-03-12 13:26:04.0 | | |
1687 | Bawanthadi (MS) | Maharashtra | Bhandara | Structure | Minors/ Sub-Minors | Complete | | 2021-03-12 13:34:24.0 | | |
1688 | Bawanthadi (MS) | Maharashtra | Bhandara | Structure | Distributaries | Complete | | 2021-03-12 13:57:31.0 | | |
1689 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-13 11:06:34.0 | | |
1690 | Gosikhurd (NP) | Maharashtra | Bhandara | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-13 11:07:05.0 | | |
1691 | Gosikhurd (NP) | Maharashtra | Bhandara | Structure | Main Canal | OnGoing | | 2021-03-13 11:33:03.0 | | |
1692 | Gosikhurd (NP) | Maharashtra | Bhandara | Main Canal | Main Canal | Complete | | 2021-03-13 11:41:13.0 | | |
1693 | Gosikhurd (NP) | Maharashtra | Bhandara | Structure | Distributaries | OnGoing | | 2021-03-13 13:45:09.0 | | |
1694 | Gosikhurd (NP) | Maharashtra | Bhandara | Structure | Distributaries | OnGoing | | 2021-03-13 13:46:43.0 | | |
1695 | Gosikhurd (NP) | Maharashtra | Bhandara | Structure | Distributaries | OnGoing | | 2021-03-13 14:02:11.0 | | |
1696 | Gosikhurd (NP) | Maharashtra | Bhandara | Structure | Distributaries | OnGoing | | 2021-03-13 15:55:10.0 | | |
1697 | Lower Wardha | Maharashtra | Wardha | Barrage | HeadWorks | OnGoing | | 2021-03-15 15:37:22.0 | | |
1698 | Lower Wardha | Maharashtra | Wardha | Barrage | HeadWorks | OnGoing | | 2021-03-15 15:39:44.0 | | |
1699 | Lower Wardha | Maharashtra | Wardha | Other | HeadWorks | OnGoing | | 2021-03-15 16:11:28.0 | | |
1700 | Lower Wardha | Maharashtra | Wardha | Barrage | HeadWorks | Complete | | 2021-03-15 17:15:54.0 | | |
1701 | Lower Wardha | Maharashtra | Wardha | Barrage | HeadWorks | Complete | | 2021-03-15 17:16:35.0 | | |
1702 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-16 11:32:42.0 | | |
1703 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | Complete | | 2021-03-16 11:37:28.0 | | |
1704 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-16 12:27:56.0 | | |
1705 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-16 12:34:59.0 | | |
1706 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-16 12:35:43.0 | | |
1707 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-16 14:39:28.0 | | |
1708 | Lower Wardha | Maharashtra | Wardha | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-16 14:40:23.0 | | |
1709 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-16 15:17:48.0 | | |
1710 | Lower Wardha | Maharashtra | Wardha | Any Other | Minors/ Sub-Minors | OnGoing | | 2021-03-16 15:18:23.0 | | |
1711 | Lower Wardha | Maharashtra | Amravati | Dam | HeadWorks | Complete | | 2021-03-17 09:49:46.0 | | |
1712 | Lower Wardha | Maharashtra | Wardha | Other | HeadWorks | OnGoing | | 2021-03-17 10:08:02.0 | | |
1713 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-17 11:16:08.0 | | |
1714 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-17 11:16:42.0 | | |
1715 | SRSP St. II | Telangana | Nalgonda | Main Canal | Main Canal | Complete | | 2021-03-17 11:35:01.0 | | |
1716 | SRSP St. II | Telangana | Nalgonda | Distributaries | Distributaries | Complete | | 2021-03-17 11:45:55.0 | | |
1717 | SRSP St. II | Telangana | Nalgonda | Structure | Main Canal | Complete | | 2021-03-17 11:53:45.0 | | |
1718 | SRSP St. II | Telangana | Nalgonda | Structure | Main Canal | Complete | | 2021-03-17 11:56:14.0 | | |
1719 | SRSP St. II | Telangana | Nalgonda | Structure | Main Canal | Complete | | 2021-03-17 12:19:31.0 | | |
1720 | SRSP St. II | Telangana | Nalgonda | Structure | Main Canal | Complete | | 2021-03-17 12:22:11.0 | | |
1721 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | OnGoing | | 2021-03-17 12:42:17.0 | | |
1722 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-17 12:57:44.0 | | |
1723 | Lower Wardha | Maharashtra | Wardha | Other | HeadWorks | OnGoing | | 2021-03-17 13:58:07.0 | | |
1724 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | Complete | | 2021-03-17 15:00:39.0 | | |
1725 | SRSP St. II | Telangana | Warangal | Distributaries | Distributaries | OnGoing | | 2021-03-17 15:18:38.0 | | |
1726 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-03-17 15:47:15.0 | | |
1727 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-17 16:07:47.0 | | |
1728 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-03-17 16:34:02.0 | | |
1729 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-03-17 16:47:36.0 | | |
1730 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-03-17 16:59:36.0 | | |
1731 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-17 17:31:34.0 | | |
1732 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-03-17 17:40:09.0 | | |
1733 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-03-17 17:56:22.0 | | |
1734 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-18 10:33:50.0 | | |
1735 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-18 10:57:40.0 | | |
1736 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-18 11:09:32.0 | | |
1737 | Lower Pedhi | Maharashtra | Amravati | Other | HeadWorks | Complete | | 2021-03-18 11:21:16.0 | | |
1738 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-18 11:27:56.0 | | |
1739 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-03-18 11:41:42.0 | | |
1740 | Arjun Shayak | Uttar Pradesh | Mahoba | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-18 11:44:39.0 | | |
1741 | Lower Pedhi | Maharashtra | Amravati | Other | HeadWorks | Complete | | 2021-03-18 11:44:39.0 | | |
1742 | Lower Pedhi | Maharashtra | Amravati | Other | HeadWorks | Complete | | 2021-03-18 11:45:12.0 | | |
1743 | Lower Pedhi | Maharashtra | Amravati | Other | HeadWorks | Complete | | 2021-03-18 11:46:01.0 | | |
1744 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Minors/ Sub-Minors | Complete | | 2021-03-18 11:58:19.0 | | |
1745 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-18 12:07:17.0 | | |
1746 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-03-18 12:11:16.0 | | |
1747 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Distributaries | Distributaries | OnGoing | | 2021-03-18 12:17:17.0 | | |
1748 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2021-03-18 12:21:34.0 | | |
1749 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Distributaries | OnGoing | | 2021-03-18 12:30:41.0 | | |
1750 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Distributaries | OnGoing | | 2021-03-18 12:40:38.0 | | |
1751 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Distributaries | OnGoing | | 2021-03-18 12:43:03.0 | | |
1752 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-18 12:46:39.0 | | |
1753 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-18 12:50:56.0 | | |
1754 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Branch Canal | Branch Canal | OnGoing | | 2021-03-18 12:52:10.0 | | |
1755 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-18 13:00:28.0 | | |
1756 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-18 13:01:29.0 | | |
1757 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-18 13:21:24.0 | | |
1758 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Distributaries | Distributaries | OnGoing | | 2021-03-18 13:24:42.0 | | |
1759 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2021-03-18 13:30:28.0 | | |
1760 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2021-03-18 13:42:18.0 | | |
1761 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Main Canal | OnGoing | | 2021-03-18 13:51:27.0 | | |
1762 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Minors/ Sub-Minors | Complete | | 2021-03-18 14:06:34.0 | | |
1763 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Structure | Main Canal | Complete | | 2021-03-18 14:10:20.0 | | |
1764 | Arjun Shayak | Uttar Pradesh | Hamirpur | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-18 14:11:30.0 | | |
1765 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Minors/ Sub-Minors | Complete | | 2021-03-18 14:29:45.0 | | |
1766 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Main Canal | OnGoing | | 2021-03-18 14:37:00.0 | | |
1767 | Arjun Shayak | Uttar Pradesh | Hamirpur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 14:40:04.0 | | |
1768 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Main Canal | OnGoing | | 2021-03-18 14:43:43.0 | | |
1769 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Main Canal | OnGoing | | 2021-03-18 14:51:06.0 | | |
1770 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Main Canal | Complete | | 2021-03-18 14:56:23.0 | | |
1771 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-18 15:07:33.0 | | |
1772 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Dam | HeadWorks | Complete | | 2021-03-18 15:30:05.0 | | |
1773 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Dam | HeadWorks | Complete | | 2021-03-18 15:36:39.0 | | |
1774 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Distributaries | Distributaries | OnGoing | | 2021-03-18 16:29:02.0 | | |
1775 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 16:33:58.0 | | |
1776 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2021-03-18 16:39:16.0 | | |
1777 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Structure | Minors/ Sub-Minors | Complete | | 2021-03-18 16:49:55.0 | | |
1778 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 17:03:06.0 | | |
1779 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 17:09:45.0 | | |
1780 | Pushkara LIS | Andhra Pradesh | West Godavari | Other | HeadWorks | Complete | | 2021-03-18 17:11:11.0 | | |
1781 | Pushkara LIS | Andhra Pradesh | West Godavari | Other | HeadWorks | Complete | | 2021-03-18 17:12:08.0 | | |
1782 | Pushkara LIS | Andhra Pradesh | West Godavari | Other | HeadWorks | Complete | | 2021-03-18 17:13:57.0 | | |
1783 | Pushkara LIS | Andhra Pradesh | East Godavari | Other | HeadWorks | Complete | | 2021-03-18 17:15:18.0 | | |
1784 | Pushkara LIS | Andhra Pradesh | West Godavari | Other | HeadWorks | Complete | | 2021-03-18 17:17:25.0 | | |
1785 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 17:28:08.0 | | |
1786 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 17:31:36.0 | | |
1787 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 17:40:06.0 | | |
1788 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 17:57:03.0 | | |
1789 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 18:05:43.0 | | |
1790 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 18:09:21.0 | | |
1791 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-03-18 18:20:35.0 | | |
1792 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | | 2021-03-19 08:52:44.0 | | |
1793 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | | 2021-03-19 08:57:35.0 | | |
1794 | Lower Wardha | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-19 10:13:32.0 | | |
1795 | Lower Wardha | Maharashtra | Yavatmal | Structure | Minors/ Sub-Minors | Complete | | 2021-03-19 10:14:18.0 | | |
1796 | Lower Wardha | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-03-19 10:23:01.0 | | |
1797 | Pushkara LIS | Andhra Pradesh | East Godavari | Critical Issue / Bottleneck | Distributaries | Yet To Be Taken Up | | 2021-03-19 10:27:30.0 | | |
1798 | Lower Wardha | Maharashtra | Yavatmal | Structure | Minors/ Sub-Minors | OnGoing | | 2021-03-19 10:28:10.0 | | |
1799 | Lower Wardha | Maharashtra | Yavatmal | Structure | Minors/ Sub-Minors | Complete | | 2021-03-19 10:29:07.0 | | |
1800 | Pushkara LIS | Andhra Pradesh | East Godavari | Critical Issue / Bottleneck | Distributaries | Yet To Be Taken Up | | 2021-03-19 10:38:27.0 | | |
1801 | Lower Wardha | Maharashtra | Yavatmal | Structure | Minors/ Sub-Minors | Complete | | 2021-03-19 11:10:26.0 | | |
1802 | Lower Wardha | Maharashtra | Yavatmal | Main Canal | Main Canal | OnGoing | | 2021-03-19 11:50:46.0 | | |
1803 | Lower Wardha | Maharashtra | Yavatmal | Main Canal | Main Canal | OnGoing | | 2021-03-19 11:51:53.0 | | |
1804 | Lower Wardha | Maharashtra | Yavatmal | Main Canal | Main Canal | OnGoing | | 2021-03-19 11:55:52.0 | | |
1805 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | | 2021-03-19 12:00:46.0 | | |
1806 | Pushkara LIS | Andhra Pradesh | East Godavari | Outlet | Distributaries | Complete | | 2021-03-19 12:02:12.0 | | |
1807 | Pushkara LIS | Andhra Pradesh | East Godavari | Structure | Main Canal | Complete | | 2021-03-19 12:08:33.0 | | |
1808 | Lower Wardha | Maharashtra | Yavatmal | Main Canal | Main Canal | OnGoing | | 2021-03-19 12:55:50.0 | | |
1809 | Bembla | Maharashtra | Yavatmal | Other | HeadWorks | Complete | | 2021-03-20 08:10:49.0 | | |
1810 | Bembla | Maharashtra | Yavatmal | Other | HeadWorks | Complete | | 2021-03-20 08:11:54.0 | | |
1811 | Bembla | Maharashtra | Yavatmal | Dam | HeadWorks | Complete | | 2021-03-20 09:28:47.0 | | |
1812 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Distributaries | Distributaries | OnGoing | | 2021-03-23 10:27:18.0 | | |
1813 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Distributaries | Distributaries | OnGoing | | 2021-03-23 11:03:53.0 | | |
1814 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Distributaries | Distributaries | Complete | | 2021-03-23 11:14:35.0 | | |
1815 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Distributaries | Distributaries | OnGoing | | 2021-03-23 11:30:25.0 | | |
1816 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Distributaries | Distributaries | OnGoing | | 2021-03-23 11:32:55.0 | | |
1817 | J. Chokka Rao LIS | Telangana | Warangal | Other | HeadWorks | OnGoing | | 2021-03-24 14:55:03.0 | | |
1818 | NLBC | Karnataka | Yadgir | Structure | Distributaries | Complete | | 2021-03-26 18:56:34.0 | | |
1819 | NLBC | Karnataka | Yadgir | Distributaries | Distributaries | Complete | | 2021-03-26 18:58:26.0 | | |
1820 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-21 15:32:42.0 | | |
1821 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-21 15:33:23.0 | | |
1822 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | OnGoing | | 2021-06-21 15:37:50.0 | | |
1823 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | OnGoing | | 2021-06-21 15:45:15.0 | | |
1824 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | OnGoing | | 2021-06-21 15:50:49.0 | | |
1825 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Distributaries | Complete | | 2021-06-21 16:01:57.0 | | |
1826 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Distributaries | Complete | | 2021-06-21 16:20:10.0 | | |
1827 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-21 16:23:59.0 | | |
1871 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | | 2021-07-13 13:17:00.0 | | |
1828 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-21 16:34:09.0 | | |
1829 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Distributaries | Complete | | 2021-06-21 16:36:39.0 | | |
1830 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Distributaries | Complete | | 2021-06-22 11:15:15.0 | | |
1831 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Distributaries | Complete | | 2021-06-22 12:01:00.0 | | |
1832 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-22 12:29:43.0 | | |
1833 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-22 12:41:23.0 | | |
1834 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-22 13:08:06.0 | | |
1835 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-22 13:09:12.0 | | |
1836 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-22 13:26:51.0 | | |
1837 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-22 13:34:09.0 | | |
1838 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-22 13:45:11.0 | | |
1839 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2021-06-22 14:09:10.0 | | |
1840 | Sangola Branch Canal | Maharashtra | Solapur | Distributaries | Distributaries | Complete | | 2021-06-22 14:23:51.0 | | |
1841 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2021-06-23 11:36:56.0 | | |
1842 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2021-06-23 11:52:12.0 | | |
1843 | Krishna Koyna LIS | Maharashtra | Sangli | Other | HeadWorks | Complete | | 2021-06-23 14:38:51.0 | | |
1844 | Krishna Koyna LIS | Maharashtra | Sangli | Other | HeadWorks | Complete | | 2021-06-23 14:41:03.0 | | |
1845 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2021-06-23 15:23:14.0 | | |
1846 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2021-06-23 15:25:27.0 | | |
1847 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2021-06-23 15:27:06.0 | | |
1848 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | OnGoing | | 2021-06-23 15:33:16.0 | | |
1849 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | OnGoing | | 2021-06-23 15:34:25.0 | | |
1850 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2021-06-23 16:12:40.0 | | |
1851 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Critical Issue / Bottleneck | Main Canal | Complete | | 2021-07-05 13:24:55.0 | | |
1852 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | Complete | | 2021-07-05 15:12:55.0 | | |
1853 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Bijnor | Structure | Main Canal | OnGoing | | 2021-07-05 15:49:03.0 | | |
1854 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Critical Issue / Bottleneck | Main Canal | OnGoing | | 2021-07-05 16:32:51.0 | | |
1855 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Main Canal | OnGoing | | 2021-07-05 16:58:08.0 | | |
1856 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Main Canal | OnGoing | | 2021-07-05 19:29:23.0 | | |
1857 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | Complete | | 2021-07-06 10:01:31.0 | | |
1858 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | Complete | | 2021-07-06 10:28:33.0 | | |
1859 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | Complete | | 2021-07-06 10:41:51.0 | | |
1860 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2021-07-06 12:04:41.0 | | |
1861 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Outlet | Branch Canal | OnGoing | | 2021-07-06 12:33:02.0 | | |
1862 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2021-07-06 13:47:06.0 | | |
1863 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Jyotiba Phule Nagar | Structure | Branch Canal | OnGoing | | 2021-07-06 14:54:12.0 | | |
1864 | Madhya Ganga Canal Ph-II | Uttar Pradesh | Moradabad | Structure | Branch Canal | OnGoing | | 2021-07-06 17:21:27.0 | | |
1865 | Gadnadi | Maharashtra | Ratnagiri | HeadWorks | Other | Yet To Be Taken Up | | 2021-07-13 11:55:06.0 | | |
1866 | Gadnadi | Maharashtra | Ratnagiri | HeadWorks | Other | OnGoing | | 2021-07-13 11:55:10.0 | | |
1867 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Structure | Complete | | 2021-07-13 12:14:54.0 | | |
1868 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Any Other | Complete | | 2021-07-13 12:16:33.0 | | |
1869 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Structure | Complete | | 2021-07-13 12:51:12.0 | | |
1870 | Gadnadi | Maharashtra | Ratnagiri | Main Canal | Main Canal | OnGoing | | 2021-07-13 12:59:49.0 | | |
1872 | Gadnadi | Maharashtra | Ratnagiri | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-07-13 13:20:23.0 | | |
1873 | Upper Tunga | Karnataka | Shimoga | Dam | HeadWorks | Complete | | 2021-07-14 08:53:05.0 | | |
1874 | Upper Tunga | Karnataka | Shimoga | Structure | Main Canal | Complete | | 2021-07-14 09:10:49.0 | | |
1875 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 11:18:17.0 | | |
1876 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 11:23:55.0 | | |
1877 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 11:25:23.0 | | |
1878 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 11:36:45.0 | | |
1879 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 11:44:52.0 | | |
1880 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 11:46:19.0 | | |
1881 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 11:55:03.0 | | |
1882 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 11:55:50.0 | | |
1883 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 12:40:47.0 | | |
1884 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 12:42:01.0 | | |
1885 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 12:45:16.0 | | |
1886 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 12:46:25.0 | | |
1887 | Kelo | Chhattisgarh | Raigarh | Main Canal | Main Canal | OnGoing | | 2021-07-14 12:49:18.0 | | |
1888 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 13:00:07.0 | | |
1889 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 13:00:59.0 | | |
1890 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 13:03:19.0 | | |
1891 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 13:04:24.0 | | |
1892 | Kelo | Chhattisgarh | Raigarh | Main Canal | Main Canal | OnGoing | | 2021-07-14 13:09:33.0 | | |
1893 | Kelo | Chhattisgarh | Raigarh | Structure | Main Canal | OnGoing | | 2021-07-14 13:11:27.0 | | |
1894 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2021-07-14 13:26:54.0 | | |
1895 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2021-07-14 13:27:59.0 | | |
1896 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2021-07-14 13:39:12.0 | | |
1897 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2021-07-14 13:40:00.0 | | |
1898 | Upper Tunga | Karnataka | Haveri | Structure | Main Canal | Complete | | 2021-07-14 14:03:35.0 | | |
1899 | Upper Tunga | Karnataka | Haveri | Structure | Main Canal | Complete | | 2021-07-14 14:05:38.0 | | |
1900 | Upper Tunga | Karnataka | Haveri | Structure | Main Canal | Complete | | 2021-07-14 14:08:25.0 | | |
1901 | Arjuna Project | Maharashtra | Ratnagiri | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 15:17:05.0 | | |
1902 | Upper Tunga | Karnataka | Haveri | Structure | Main Canal | Complete | | 2021-07-14 15:57:01.0 | | |
1903 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 16:01:29.0 | | |
1904 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 16:02:30.0 | | |
1905 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 16:06:15.0 | | |
1906 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 16:07:24.0 | | |
1907 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 16:14:58.0 | | |
1908 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 16:15:44.0 | | |
1909 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 16:17:42.0 | | |
1910 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 16:39:11.0 | | |
1911 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 16:41:05.0 | | |
1912 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 16:45:25.0 | | |
1913 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 17:00:40.0 | | |
1914 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 17:02:10.0 | | |
1915 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 17:10:19.0 | | |
1916 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 17:18:02.0 | | |
1917 | Upper Tunga | Karnataka | Haveri | Critical Issue / Bottleneck | Main Canal | OnGoing | | 2021-07-14 17:22:16.0 | | |
1918 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 17:23:32.0 | | |
1919 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 17:25:20.0 | | |
1920 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 17:28:21.0 | | |
1921 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 17:37:15.0 | | |
1922 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 17:38:27.0 | | |
1923 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-07-14 17:38:59.0 | | |
1924 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 17:51:55.0 | | |
1925 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-07-14 17:52:17.0 | | |
1926 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-07-14 17:53:24.0 | | |
1927 | Kelo | Chhattisgarh | Raigarh | Structure | Branch Canal | OnGoing | | 2021-07-14 18:02:17.0 | | |
1928 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2021-07-14 18:03:06.0 | | |
1929 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 18:05:51.0 | | |
1930 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-07-14 18:07:34.0 | | |
1931 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2021-07-14 18:09:47.0 | | |
1932 | Upper Tunga | Karnataka | Haveri | Structure | Main Canal | Complete | | 2021-07-14 18:49:10.0 | | |
1933 | Sindh Project Ph - II | Madhya Pradesh | Gwalior | Any Other | Distributaries | Complete | | 2021-07-15 15:08:08.0 | | |
1934 | Sindh Project Ph - II | Madhya Pradesh | Gwalior | Any Other | Distributaries | Complete | | 2021-07-15 15:51:43.0 | | |
1935 | Aruna Project | Maharashtra | Sindhudurg | HeadWorks | Other | Complete | | 2021-07-16 16:02:14.0 | | |
1936 | Nardave (Mahammadwadi) | Maharashtra | Sindhudurg | HeadWorks | Other | OnGoing | | 2021-07-17 12:03:43.0 | | |
1937 | Nardave (Mahammadwadi) | Maharashtra | Sindhudurg | HeadWorks | Other | OnGoing | | 2021-07-17 16:02:50.0 | | |
1938 | Tillari (MH) | Maharashtra | Sindhudurg | Main Canal | Main Canal | Complete | | 2021-07-19 17:37:06.0 | | |
1939 | Tillari (MH) | Maharashtra | North Goa | Main Canal | Main Canal | OnGoing | | 2021-07-19 17:53:02.0 | | |
1940 | Tillari (MH) | Maharashtra | North Goa | Main Canal | Main Canal | OnGoing | | 2021-07-19 18:01:23.0 | | |
1941 | Tillari (MH) | Maharashtra | Sindhudurg | Main Canal | Main Canal | Complete | | 2021-07-20 00:37:54.0 | | |
1942 | Palemvagu | Telangana | Khammam | Distributaries | Distributaries | OnGoing | | 2021-07-28 13:02:28.0 | | |
1943 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Dam | HeadWorks | OnGoing | | 2021-07-30 11:08:38.0 | | |
1944 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Dam | HeadWorks | Complete | | 2021-07-30 11:11:45.0 | | |
1945 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Other | HeadWorks | OnGoing | | 2021-07-30 11:25:53.0 | | |
1946 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Main Canal | Main Canal | Complete | | 2021-07-30 11:35:25.0 | | |
1947 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Main Canal | Main Canal | OnGoing | | 2021-07-30 12:31:19.0 | | |
1948 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Dam | HeadWorks | Complete | | 2021-07-30 12:54:00.0 | | |
1949 | Rajiv Bhima LIS | Telangana | Mahbubnagar | Distributaries | Distributaries | OnGoing | | 2021-07-30 13:17:20.0 | | |
1950 | Saryu Nahar Pariyojana | Uttar Pradesh | Mahrajganj | Branch Canal | Structure | OnGoing | | 2021-08-04 12:17:15.0 | | |
1951 | Saryu Nahar Pariyojana | Uttar Pradesh | Mahrajganj | Structure | Branch Canal | OnGoing | | 2021-08-04 12:46:10.0 | | |
1952 | Saryu Nahar Pariyojana | Uttar Pradesh | Mahrajganj | Structure | Branch Canal | OnGoing | | 2021-08-04 12:47:38.0 | | |
1953 | Saryu Nahar Pariyojana | Uttar Pradesh | Mahrajganj | Structure | Branch Canal | OnGoing | | 2021-08-04 12:48:32.0 | | |
1954 | Saryu Nahar Pariyojana | Uttar Pradesh | Mahrajganj | Structure | Branch Canal | OnGoing | | 2021-08-04 12:50:03.0 | | |
1955 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Structure | Branch Canal | Complete | | 2021-08-04 14:24:27.0 | | |
1977 | Khadakpurna | Maharashtra | Buldana | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-23 16:56:23.0 | | |
1956 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Structure | Branch Canal | Complete | | 2021-08-04 14:25:35.0 | | |
1957 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Structure | Branch Canal | Complete | | 2021-08-04 14:27:34.0 | | |
1958 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Structure | Branch Canal | Complete | | 2021-08-04 16:58:33.0 | | |
1959 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Structure | Branch Canal | Complete | | 2021-08-04 17:01:44.0 | | |
1960 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Branch Canal | Branch Canal | Complete | | 2021-08-04 17:03:20.0 | | |
1961 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Main Canal | Structure | Complete | | 2021-08-04 18:22:34.0 | | |
1962 | Saryu Nahar Pariyojana | Uttar Pradesh | Siddharthnagar | Main Canal | Structure | Complete | | 2021-08-04 18:46:41.0 | | |
1963 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Structure | OnGoing | | 2021-08-05 10:26:58.0 | | |
1964 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Structure | Complete | | 2021-08-05 10:33:23.0 | | |
1965 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Structure | Complete | | 2021-08-05 12:10:55.0 | | |
1966 | Saryu Nahar Pariyojana | Uttar Pradesh | Balrampur | Main Canal | Structure | Complete | | 2021-08-05 21:48:39.0 | | |
1967 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Structure | Branch Canal | OnGoing | | 2021-08-13 10:29:55.0 | | |
1968 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Branch Canal | Yet To Be Taken Up | | 2021-08-13 10:57:53.0 | | |
1969 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Branch Canal | Yet To Be Taken Up | | 2021-08-13 11:27:10.0 | | |
1970 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Structure | Minors/ Sub-Minors | Complete | | 2021-08-13 11:45:41.0 | | |
1971 | Khadakpurna | Maharashtra | Buldana | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-23 13:46:26.0 | | |
1972 | Khadakpurna | Maharashtra | Buldana | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-08-23 13:58:09.0 | | |
1973 | Khadakpurna | Maharashtra | Buldana | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-23 15:44:18.0 | | |
1974 | Khadakpurna | Maharashtra | Buldana | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-23 15:45:13.0 | | |
1975 | Khadakpurna | Maharashtra | Buldana | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-08-23 15:51:48.0 | | |
1976 | Khadakpurna | Maharashtra | Buldana | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-23 15:55:57.0 | | |
1978 | Waghur Project | Maharashtra | Jalgaon | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-24 11:48:38.0 | | |
1979 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Jabalpur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-08-24 12:24:36.0 | | |
1980 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Jabalpur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-08-24 12:29:26.0 | | |
1981 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Jabalpur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-08-24 12:36:41.0 | | |
1982 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Jabalpur | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-08-24 13:03:26.0 | | |
1983 | Waghur Project | Maharashtra | Jalgaon | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-08-24 13:05:46.0 | | |
1984 | Waghur Project | Maharashtra | Jalgaon | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-24 13:09:49.0 | | |
1985 | Waghur Project | Maharashtra | Jalgaon | Any Other | Minors/ Sub-Minors | Yet To Be Taken Up | | 2021-08-24 13:11:35.0 | | |
1986 | Bargi Diversion Projrct Ph- III (Km.104 to Km. 154) | Madhya Pradesh | Jabalpur | Any Other | Minors/ Sub-Minors | Complete | | 2021-08-24 13:21:27.0 | | |
1987 | Waghur Project | Maharashtra | Jalgaon | Outlet | Minors/ Sub-Minors | Yet To Be Taken Up | | 2021-08-24 13:27:43.0 | | |
1988 | Waghur Project | Maharashtra | Jalgaon | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-08-24 13:29:39.0 | | |
1989 | Waghur Project | Maharashtra | Jalgaon | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-24 13:44:46.0 | | |
1990 | Waghur Project | Maharashtra | Jalgaon | Outlet | Minors/ Sub-Minors | Complete | | 2021-08-24 13:49:45.0 | | |
1991 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Outlet | Distributaries | Complete | | 2021-08-25 11:39:04.0 | | |
1992 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Outlet | Distributaries | Complete | | 2021-08-25 11:45:43.0 | | |
1993 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Outlet | Distributaries | Complete | | 2021-08-25 11:47:08.0 | | |
1994 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Distributaries | Distributaries | Complete | | 2021-08-25 11:48:53.0 | | |
1995 | Nandur Madhmeshwar Ph. II | Maharashtra | Aurangabad | Outlet | Distributaries | Complete | | 2021-08-25 11:54:16.0 | | |
1996 | Sardar Sarovar | Gujarat | Gandhinagar | Dam | HeadWorks | Complete | | 2021-09-15 14:40:03.0 | | |
1997 | Bembla | Maharashtra | Yavatmal | Branch Canal | Branch Canal | Complete | | 2021-09-22 12:53:53.0 | | |
1998 | Bembla | Maharashtra | Yavatmal | Branch Canal | Branch Canal | Complete | | 2021-09-22 13:28:30.0 | | |
1999 | Bembla | Maharashtra | Yavatmal | Branch Canal | Branch Canal | Complete | | 2021-09-22 13:42:48.0 | | |
2000 | Bembla | Maharashtra | Yavatmal | Branch Canal | Branch Canal | Complete | | 2021-09-22 13:45:19.0 | | |
2001 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | Complete | | 2021-09-22 13:55:14.0 | | |
2002 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-09-22 14:05:36.0 | | |
2003 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2021-09-22 14:11:28.0 | | |
2004 | Bembla | Maharashtra | Yavatmal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-09-22 14:25:48.0 | | |
2005 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2021-09-22 14:48:01.0 | | |
2006 | Bembla | Maharashtra | Yavatmal | Outlet | Minors/ Sub-Minors | Complete | | 2021-09-22 14:49:57.0 | | |
2007 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | Complete | | 2021-09-22 16:44:38.0 | | |
2008 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | Complete | | 2021-09-22 16:48:49.0 | | |
2009 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2021-09-22 16:51:33.0 | | |
2010 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | Complete | | 2021-09-22 16:57:49.0 | | |
2011 | Bembla | Maharashtra | Yavatmal | Main Canal | Main Canal | Complete | | 2021-09-23 14:38:57.0 | | |
2012 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2021-09-23 14:41:40.0 | | |
2013 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2021-09-23 14:56:27.0 | | |
2014 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | OnGoing | | 2021-09-23 14:58:27.0 | | |
2015 | Bembla | Maharashtra | Yavatmal | Main Canal | Main Canal | Complete | | 2021-09-23 15:12:53.0 | | |
2016 | Bembla | Maharashtra | Yavatmal | Distributaries | Distributaries | Complete | | 2021-09-23 15:28:56.0 | | |
2017 | Bembla | Maharashtra | Yavatmal | Main Canal | Main Canal | Complete | | 2021-09-23 15:45:28.0 | | |
2018 | Lower Wardha | Maharashtra | Wardha | Branch Canal | Branch Canal | OnGoing | | 2021-09-24 12:50:58.0 | | |
2019 | Lower Wardha | Maharashtra | Wardha | Distributaries | Distributaries | Complete | | 2021-09-24 12:59:11.0 | | |
2020 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-09-24 13:04:34.0 | | |
2021 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-09-24 13:20:30.0 | | |
2022 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-09-24 13:22:52.0 | | |
2023 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-09-24 13:37:06.0 | | |
2024 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-09-24 14:15:37.0 | | |
2025 | Lower Wardha | Maharashtra | Wardha | Distributaries | Distributaries | Complete | | 2021-09-25 11:18:39.0 | | |
2026 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-09-25 11:20:33.0 | | |
2027 | Lower Wardha | Maharashtra | Wardha | Outlet | Minors/ Sub-Minors | OnGoing | | 2021-09-25 11:33:42.0 | | |
2028 | Lower Wardha | Maharashtra | Wardha | Distributaries | Distributaries | OnGoing | | 2021-09-25 12:04:14.0 | | |
2029 | Lower Wardha | Maharashtra | Wardha | Outlet | Distributaries | Complete | | 2021-09-25 12:11:55.0 | | |
2030 | Lower Wardha | Maharashtra | Wardha | Outlet | Distributaries | Complete | | 2021-09-25 12:13:01.0 | | |
2031 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-09-25 13:25:57.0 | | |
2032 | Lower Wardha | Maharashtra | Wardha | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-09-25 13:38:32.0 | | |
2033 | Lower Wardha | Maharashtra | Wardha | Branch Canal | Branch Canal | Complete | | 2021-09-25 14:10:07.0 | | |
2034 | Lower Wardha | Maharashtra | Amravati | Any Other | Branch Canal | Complete | | 2021-09-25 16:28:17.0 | | |
2035 | Lower Pedhi | Maharashtra | Amravati | Dam | HeadWorks | OnGoing | | 2021-09-27 10:55:43.0 | | |
2036 | Lower Pedhi | Maharashtra | Amravati | Main Canal | Main Canal | OnGoing | | 2021-09-27 11:03:40.0 | | |
2037 | Indira Sagar Project Canal Ph V (Khargone Lift) | Madhya Pradesh | West Nimar | Other | HeadWorks | Complete | | 2021-10-05 11:44:03.0 | | |
2038 | Indira Sagar Project Canal Ph V (Khargone Lift) | Madhya Pradesh | West Nimar | Other | HeadWorks | OnGoing | | 2021-10-05 13:29:09.0 | | |
2039 | Indira Sagar Project Canal Ph V (Khargone Lift) | Madhya Pradesh | West Nimar | Other | HeadWorks | Complete | | 2021-10-05 16:26:05.0 | | |
2040 | Indira Sagar Project Canal Ph III (Km. 143 to Km. 206) | Madhya Pradesh | West Nimar | Critical Issue / Bottleneck | Minors/ Sub-Minors | OnGoing | | 2021-10-06 10:27:19.0 | | |
2041 | Indira Sagar Project Canal Ph III (Km. 143 to Km. 206) | Madhya Pradesh | West Nimar | Any Other | Minors/ Sub-Minors | Complete | | 2021-10-06 10:55:10.0 | | |
2042 | Indira Sagar Project Canal Ph III (Km. 143 to Km. 206) | Madhya Pradesh | Barwani | Main Canal | Main Canal | OnGoing | | 2021-10-06 13:35:19.0 | | |
2043 | Indira Sagar Project Canal Ph III (Km. 143 to Km. 206) | Madhya Pradesh | Barwani | Distributaries | Distributaries | Complete | | 2021-10-06 16:07:46.0 | | |
2044 | Indira Sagar Project Canal Ph IV (Km. 206 to Km. 243) | Madhya Pradesh | Barwani | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-10-06 17:14:15.0 | | |
2045 | Indira Sagar Project Canal Ph IV (Km. 206 to Km. 243) | Madhya Pradesh | Barwani | Distributaries | Distributaries | OnGoing | | 2021-10-07 10:44:17.0 | | |
2046 | Indira Sagar Project Canal Ph IV (Km. 206 to Km. 243) | Madhya Pradesh | Barwani | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-10-07 11:46:09.0 | | |
2047 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-13 12:54:22.0 | | |
2048 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-13 13:16:34.0 | | |
2049 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-12-13 13:53:12.0 | | |
2050 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-12-13 14:27:51.0 | | |
2051 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-12-13 14:36:54.0 | | |
2052 | Tarali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-12-13 14:43:18.0 | | |
2053 | Tarali | Maharashtra | Satara | Any Other | Main Canal | Complete | | 2021-12-13 16:20:38.0 | | |
2054 | Tarali | Maharashtra | Satara | Any Other | Main Canal | Complete | | 2021-12-13 16:42:41.0 | | |
2055 | Tarali | Maharashtra | Satara | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-12-14 11:52:38.0 | | |
2056 | Tarali | Maharashtra | Satara | Distributaries | Distributaries | OnGoing | | 2021-12-14 12:17:00.0 | | |
2057 | Tarali | Maharashtra | Satara | Minors/ Sub-Minors | Outlet | Complete | | 2021-12-14 12:38:09.0 | | |
2058 | Tarali | Maharashtra | Satara | Minors/ Sub-Minors | Outlet | Complete | | 2021-12-14 12:56:11.0 | | |
2059 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 11:45:43.0 | | |
2060 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 11:46:40.0 | | |
2061 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 11:47:14.0 | | |
2062 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 11:48:08.0 | | |
2063 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 11:51:39.0 | | |
2064 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 11:52:15.0 | | |
2065 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 11:52:53.0 | | |
2066 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 13:08:21.0 | | |
2067 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 13:08:56.0 | | |
2068 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 13:09:23.0 | | |
2069 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 13:10:01.0 | | |
2070 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 13:53:42.0 | | |
2071 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 14:00:46.0 | | |
2072 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 14:01:19.0 | | |
2073 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 14:01:55.0 | | |
2074 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 14:02:37.0 | | |
2075 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 14:03:38.0 | | |
2076 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 14:42:30.0 | | |
2077 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 15:27:29.0 | | |
2078 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 15:28:07.0 | | |
2079 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 15:46:54.0 | | |
2080 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 16:24:05.0 | | |
2081 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 16:25:17.0 | | |
2082 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 16:27:16.0 | | |
2083 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 16:28:48.0 | | |
2084 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-15 16:29:50.0 | | |
2085 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 16:56:19.0 | | |
2086 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 17:14:48.0 | | |
2087 | Morna (Gureghar) | Maharashtra | Satara | Dam | HeadWorks | Complete | | 2021-12-15 17:15:32.0 | | |
2088 | Kudali | Maharashtra | Satara | Other | HeadWorks | OnGoing | | 2021-12-17 10:26:44.0 | | |
2089 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-17 11:06:11.0 | | |
2090 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-17 11:21:15.0 | | |
2091 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-17 11:42:29.0 | | |
2092 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-17 12:04:54.0 | | |
2093 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-17 12:21:12.0 | | |
2094 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-17 12:32:53.0 | | |
2095 | Kudali | Maharashtra | Satara | Structure | Main Canal | OnGoing | | 2021-12-17 12:36:24.0 | | |
2096 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | Complete | | 2021-12-17 13:00:58.0 | | |
2097 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-17 13:43:03.0 | | |
2098 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-17 13:55:36.0 | | |
2099 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-17 15:13:54.0 | | |
2100 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-17 15:16:13.0 | | |
2101 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-17 15:28:01.0 | | |
2102 | Kudali | Maharashtra | Satara | Dam | HeadWorks | OnGoing | | 2021-12-17 15:37:02.0 | | |
2103 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-17 16:29:43.0 | | |
2104 | Kudali | Maharashtra | Satara | Main Canal | Main Canal | OnGoing | | 2021-12-17 16:31:43.0 | | |
2105 | Kelo | Chhattisgarh | Janjgir - Champa | Distributaries | Distributaries | OnGoing | | 2021-12-22 09:55:35.0 | | |
2106 | Kelo | Chhattisgarh | Janjgir - Champa | Distributaries | Distributaries | OnGoing | | 2021-12-22 09:56:18.0 | | |
2107 | Kelo | Chhattisgarh | Janjgir - Champa | Distributaries | Distributaries | OnGoing | | 2021-12-22 09:57:58.0 | | |
2108 | Kelo | Chhattisgarh | Janjgir - Champa | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-12-22 10:10:39.0 | | |
2109 | Kelo | Chhattisgarh | Janjgir - Champa | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2021-12-22 10:13:34.0 | | |
2110 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-12-22 10:26:57.0 | | |
2111 | Kelo | Chhattisgarh | Raigarh | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-12-22 10:28:22.0 | | |
2112 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | Complete | | 2021-12-22 10:34:26.0 | | |
2113 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | Complete | | 2021-12-22 10:36:35.0 | | |
2114 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | Complete | | 2021-12-22 10:38:37.0 | | |
2115 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | Complete | | 2021-12-22 11:05:23.0 | | |
2116 | Kelo | Chhattisgarh | Raigarh | Main Canal | Main Canal | Complete | | 2021-12-22 11:20:23.0 | | |
2117 | Kelo | Chhattisgarh | Raigarh | Main Canal | Main Canal | Complete | | 2021-12-22 11:21:20.0 | | |
2118 | Kelo | Chhattisgarh | Raigarh | Structure | Main Canal | Complete | | 2021-12-22 11:25:27.0 | | |
2119 | Kelo | Chhattisgarh | Raigarh | Main Canal | Main Canal | Complete | | 2021-12-22 11:31:00.0 | | |
2120 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2021-12-22 12:20:39.0 | | |
2121 | Kelo | Chhattisgarh | Raigarh | Branch Canal | Branch Canal | OnGoing | | 2021-12-22 12:23:08.0 | | |
2122 | Kelo | Chhattisgarh | Raigarh | Structure | Branch Canal | Complete | | 2021-12-22 12:27:10.0 | | |
2123 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | Complete | | 2021-12-22 12:51:14.0 | | |
2124 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | Complete | | 2021-12-22 12:52:38.0 | | |
2125 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | Complete | | 2021-12-22 12:53:13.0 | | |
2126 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-12-22 13:04:20.0 | | |
2127 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-12-22 13:09:35.0 | | |
2128 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-12-22 13:35:40.0 | | |
2129 | Kelo | Chhattisgarh | Raigarh | Structure | Minors/ Sub-Minors | OnGoing | | 2021-12-22 14:09:14.0 | | |
2130 | Kelo | Chhattisgarh | Raigarh | Distributaries | Distributaries | OnGoing | | 2021-12-22 14:24:58.0 | | |
2131 | Kelo | Chhattisgarh | Raigarh | Structure | Distributaries | OnGoing | | 2021-12-22 14:32:25.0 | | |
2132 | Kelo | Chhattisgarh | Raigarh | Dam | HeadWorks | Complete | | 2021-12-22 17:11:57.0 | | |
2133 | Kelo | Chhattisgarh | Raigarh | Dam | HeadWorks | Complete | | 2021-12-22 17:14:17.0 | | |
2134 | Kelo | Chhattisgarh | Raigarh | Dam | HeadWorks | Complete | | 2021-12-22 17:25:57.0 | | |
2135 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Barrage | HeadWorks | OnGoing | | 2021-12-23 13:44:27.0 | | |
2156 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | | 2021-12-29 15:54:20.0 | | |
2136 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | | 2021-12-23 14:01:54.0 | | |
2137 | Peddavagu (Sch.Jaganathpoor) | Telangana | Adilabad | Structure | Main Canal | OnGoing | | 2021-12-23 14:21:45.0 | | |
2138 | Peddavagu @ Neelwai | Telangana | Adilabad | Distributaries | Distributaries | Complete | | 2021-12-24 12:08:50.0 | | |
2139 | Peddavagu @ Neelwai | Telangana | Adilabad | Main Canal | Main Canal | OnGoing | | 2021-12-24 12:21:46.0 | | |
2140 | Peddavagu @ Neelwai | Telangana | Adilabad | Distributaries | Distributaries | Complete | | 2021-12-24 12:34:23.0 | | |
2141 | J. Chokka Rao LIS | Telangana | Warangal | Other | HeadWorks | Complete | | 2021-12-28 11:16:32.0 | | |
2142 | J. Chokka Rao LIS | Telangana | Warangal | Main Canal | Main Canal | Complete | | 2021-12-28 12:00:42.0 | | |
2143 | J. Chokka Rao LIS | Telangana | Warangal | Other | HeadWorks | OnGoing | | 2021-12-28 13:00:25.0 | | |
2144 | J. Chokka Rao LIS | Telangana | Warangal | Other | HeadWorks | OnGoing | | 2021-12-28 13:05:28.0 | | |
2145 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | Complete | | 2021-12-29 10:30:53.0 | | |
2146 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | | 2021-12-29 10:48:47.0 | | |
2147 | SRSP St. II | Telangana | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-12-29 12:08:51.0 | | |
2148 | SRSP St. II | Telangana | Warangal | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2021-12-29 12:09:23.0 | | |
2149 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | Complete | | 2021-12-29 13:05:23.0 | | |
2150 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | Complete | | 2021-12-29 13:06:25.0 | | |
2151 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | Complete | | 2021-12-29 13:19:03.0 | | |
2152 | Arjun Shayak | Uttar Pradesh | Mahoba | Main Canal | Main Canal | Complete | | 2021-12-29 13:19:46.0 | | |
2153 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-12-29 13:26:34.0 | | |
2154 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-12-29 13:27:57.0 | | |
2155 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | | 2021-12-29 15:51:20.0 | | |
2157 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | | 2021-12-29 15:57:18.0 | | |
2158 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | | 2021-12-29 15:58:17.0 | | |
2159 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | Complete | | 2021-12-29 16:23:08.0 | | |
2160 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | OnGoing | | 2021-12-29 16:25:29.0 | | |
2161 | Arjun Shayak | Uttar Pradesh | Mahoba | Dam | HeadWorks | OnGoing | | 2021-12-29 16:35:04.0 | | |
2162 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-12-29 17:29:41.0 | | |
2163 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-12-30 10:30:53.0 | | |
2164 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-12-30 10:35:17.0 | | |
2165 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Distributaries | OnGoing | | 2021-12-30 10:42:11.0 | | |
2166 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | Complete | | 2021-12-30 11:26:15.0 | | |
2167 | Arjun Shayak | Uttar Pradesh | Banda | Structure | Main Canal | Complete | | 2021-12-30 12:12:55.0 | | |
2168 | Arjun Shayak | Uttar Pradesh | Banda | Structure | Distributaries | OnGoing | | 2021-12-30 12:29:18.0 | | |
2169 | Arjun Shayak | Uttar Pradesh | Banda | Critical Issue / Bottleneck | Distributaries | OnGoing | | 2021-12-30 12:30:26.0 | | |
2170 | Arjun Shayak | Uttar Pradesh | Banda | Structure | Distributaries | OnGoing | | 2021-12-30 12:32:22.0 | | |
2171 | Arjun Shayak | Uttar Pradesh | Banda | Structure | Main Canal | Complete | | 2021-12-30 12:47:15.0 | | |
2172 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Minors/ Sub-Minors | Complete | | 2021-12-30 12:50:13.0 | | |
2173 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-12-30 13:35:00.0 | | |
2174 | Arjun Shayak | Uttar Pradesh | Mahoba | Structure | Main Canal | OnGoing | | 2021-12-30 13:37:23.0 | | |
2175 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Main Canal | Complete | | 2021-12-30 14:44:30.0 | | |
2176 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Main Canal | OnGoing | | 2021-12-30 15:18:19.0 | | |
2177 | Arjun Shayak | Uttar Pradesh | Hamirpur | Structure | Main Canal | OnGoing | | 2021-12-30 15:21:24.0 | | |
2178 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 11:52:28.0 | | |
2179 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 12:03:24.0 | | |
2180 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 12:14:25.0 | | |
2181 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 12:20:10.0 | | |
2182 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 13:10:23.0 | | |
2183 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 13:13:48.0 | | |
2184 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 13:17:38.0 | | |
2185 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 13:22:10.0 | | |
2186 | Kharung (ERM) | Chhattisgarh | Bilaspur | Distributaries | Distributaries | OnGoing | | 2022-02-04 13:26:49.0 | | |
2187 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2022-02-04 14:17:12.0 | | |
2188 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2022-02-04 14:17:55.0 | | |
2189 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2022-02-04 14:19:37.0 | | |
2190 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2022-02-04 14:24:01.0 | | |
2191 | Kharung (ERM) | Chhattisgarh | Bilaspur | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2022-02-04 14:29:46.0 | | |
2192 | Kharung (ERM) | Chhattisgarh | Bilaspur | Structure | Minors/ Sub-Minors | Complete | | 2022-02-04 14:33:11.0 | | |
2193 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Structure | Main Canal | Complete | | 2022-02-16 12:30:23.0 | | |
2194 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Structure | Main Canal | Complete | | 2022-02-16 12:33:06.0 | | |
2195 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Structure | Minors/ Sub-Minors | Complete | | 2022-02-16 12:36:54.0 | | |
2196 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2022-02-16 12:38:08.0 | | |
2197 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 12:44:30.0 | | |
2198 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 12:46:28.0 | | |
2199 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 12:48:02.0 | | |
2200 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 12:54:16.0 | | |
2201 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 13:06:21.0 | | |
2202 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 13:18:02.0 | | |
2203 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 13:19:14.0 | | |
2204 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 13:23:50.0 | | |
2205 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 13:32:14.0 | | |
2206 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 13:33:43.0 | | |
2207 | Maniyari Tank (ERM) | Chhattisgarh | Mungeli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-02-16 13:42:50.0 | | |
2208 | Palemvagu | Telangana | Khammam | Main Canal | Main Canal | Complete | | 2022-03-03 12:14:27.0 | | |
2209 | Palemvagu | Telangana | Khammam | Dam | HeadWorks | OnGoing | | 2022-03-03 12:25:55.0 | | |
2210 | Palemvagu | Telangana | Khammam | Dam | HeadWorks | OnGoing | | 2022-03-03 12:29:00.0 | | |
2211 | Palemvagu | Telangana | Khammam | Distributaries | Distributaries | Complete | | 2022-03-03 12:45:31.0 | | |
2212 | Palemvagu | Telangana | Khammam | Distributaries | Distributaries | Complete | | 2022-03-03 12:59:16.0 | | |
2213 | Sri Komarambheem | Telangana | Adilabad | Dam | HeadWorks | Complete | | 2022-03-08 13:09:12.0 | | |
2214 | Sri Komarambheem | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2022-03-08 13:11:13.0 | | |
2215 | Sri Komarambheem | Telangana | Adilabad | Distributaries | Distributaries | Complete | | 2022-03-08 13:31:23.0 | | |
2216 | Sri Komarambheem | Telangana | Adilabad | Main Canal | Main Canal | Complete | | 2022-03-08 13:34:28.0 | | |
2217 | Sri Komarambheem | Telangana | Adilabad | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2022-03-08 13:51:22.0 | | |
2218 | Sri Komarambheem | Telangana | Adilabad | Distributaries | Distributaries | Complete | | 2022-03-08 13:59:57.0 | | |
2219 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Distributaries | Distributaries | Complete | | 2022-03-09 10:43:25.0 | | |
2220 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | Complete | | 2022-03-09 10:45:59.0 | | |
2221 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Minors/ Sub-Minors | Minors/ Sub-Minors | OnGoing | | 2022-03-09 11:11:51.0 | | |
2222 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Main Canal | Main Canal | Complete | | 2022-03-09 11:37:14.0 | | |
2223 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Main Canal | Main Canal | Complete | | 2022-03-09 12:04:12.0 | | |
2224 | Int. Anandapur Barrage Ph. I | Odisha | Baleshwar | Structure | Branch Canal | OnGoing | | 2022-03-14 12:23:37.0 | | |
2225 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | OnGoing | | 2022-05-18 09:34:36.0 | | |
2226 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | OnGoing | | 2022-05-18 09:37:50.0 | | |
2227 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | OnGoing | | 2022-05-18 09:39:59.0 | | |
2228 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | OnGoing | | 2022-05-18 09:42:43.0 | | |
2229 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2022-05-18 09:52:42.0 | | |
2230 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2022-05-18 10:17:32.0 | | |
2231 | Sangola Branch Canal | Maharashtra | Solapur | Main Canal | Main Canal | Complete | | 2022-05-18 10:18:29.0 | | |
2232 | Krishna Koyna LIS | Maharashtra | Sangli | Outlet | Minors/ Sub-Minors | Complete | | 2022-05-19 10:07:58.0 | | |
2233 | Krishna Koyna LIS | Maharashtra | Sangli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-05-19 10:37:20.0 | | |
2234 | Krishna Koyna LIS | Maharashtra | Sangli | Outlet | Minors/ Sub-Minors | OnGoing | | 2022-05-19 10:50:50.0 | | |
2235 | Krishna Koyna LIS | Maharashtra | Sangli | Main Canal | Main Canal | Complete | | 2022-05-19 12:44:07.0 | | |
2236 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2022-05-19 12:48:50.0 | | |
2237 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2022-05-19 12:50:34.0 | | |
2238 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2022-05-19 12:51:20.0 | | |
2239 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2022-05-19 13:04:07.0 | | |
2240 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2022-05-19 13:05:54.0 | | |
2241 | Krishna Koyna LIS | Maharashtra | Sangli | Distributaries | Distributaries | Complete | | 2022-05-19 13:30:02.0 | | |
2242 | Indiramma Flood Flow Canal | Telangana | Rajanna Sircilla | Dam | HeadWorks | Complete | | 2022-06-29 11:22:07.0 | | |
2243 | Indiramma Flood Flow Canal | Telangana | Rajanna Sircilla | Main Canal | Main Canal | Complete | | 2022-06-29 11:31:53.0 | | |
2244 | Indiramma Flood Flow Canal | Telangana | Rajanna Sircilla | Main Canal | Main Canal | OnGoing | | 2022-06-29 11:48:10.0 | | |
2245 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Main Canal | Main Canal | OnGoing | | 2022-06-29 16:18:41.0 | | |
2246 | Indiramma Flood Flow Canal | Telangana | Karimnagar | Branch Canal | Branch Canal | OnGoing | | 2022-06-29 16:24:53.0 | | |